North.North Atlantic Energy Service Corporation SNorthP.O.
Box 300 Seabrook, NH 03874 Atlantic (603) 474-9521 The Northeast Utilities System July 10, 2002 Docket No. 50-443 NYN-02072 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station June 2002 Monthly Operating Report Enclosed please find Monthly Operating Report 02-06. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of June, 2002 and is submitted in accordance with :the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this
- matter, please contact Mr. James M. Peschel, Manager - Regulatory Programs, at (603) 773-7194.
Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
Gene F. St. Pierre Station Director cc:
H. J. Miller, NRC Region I Administrator R. D. Starkey, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector
OPERATING DATA REPORT DOCKET NO.
50-443 UNIT Seabrook I DATE July 1, 2002 COMPLETED BY J. L. Dalton TELEPHONE (603) 773-7025 OPERATING STATUS
- 1.
Unit Name:
Seabrook Station Unit 1
- 2.
Reporting Period:
JUNE 2002
- 3.
Licensed Thermal Power (MWt):
3411.0
- 4.
Design Electrical Rating (Net MWe):
1148.0
- 5.
Maximum Dependable Capacity (Net MWe):
1155.3
- 6.
If Changes Occur in Capacity Ratings (Items Number 3 through 5)
Not Applicable Since Last Report, Give Reasons:
This Month Yr-to-Date Cumulative
- 7.
Number of Hours Reactor Was Critical 720.0 3713.7 90217.6
- 8.
Hours Generator On-Line 709.4 3666.7 87375.4
- 9.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 10.
Net Electrical Energy Generated (MWH) 775658 4184948 98070480 1 of 2 OPERATING
SUMMARY
The unit underwent power ascension testing in early June following a planned refueling outage. The unit reached 100% Rated Thermal Power (RTP) on June 40h. There was a planned reduction in power on June 1St in support of an SG chemistry cleanup, which required the unit to be off line. The unit was also forced to downpower to repair a steam leak. This yielded an availability factor of 98.5 % and a capacity factor of 93.2 % based on the MDC value of 1155.3 Net MWe.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-443 UNIT Seabrook 1 DATE July 1, 2002 COMPLETED BY J. L. Dalton TELEPHONE (603) 773-7025 MONTH: JUNE 2002 2 of 2 NO.
DATE TYPE' DURATION REASON 2 METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (HOURS)
DOWN REACTOR 3 COMMENTS 02-03 06/01/02 S
10.60 F
5 During power ascension from a planned refueling outage, operations initiated a power decrease to 4% (offline) to support SG chemistry cleanup. This chemistry hold was cleared in just over ten hours.
02-04 06/04/02 F
0 A
5 Unit was powered down to 51% to allow the safe installation of a leak repair device around a section of piping, which had a defective socket weld and was leaking steam. The unit returned to full power operations on June 6th.
2 3
F:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)