January 2004 Monthly Operating Report for Seabrook Station
ML040510485
Person / Time
Site: Seabrook 
Issue date: 02/12/2004
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NYN-04015
Download: ML040510485 (3)


Text

FPL Energy FPL Energ Sealbrook Station Seabrook Station P.O. Box 300 Seabrook, NIl 03874 (603) 773-7000 FEB 1 2 2004 Docket No. 50-443 NYN-04015 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station January 2004 Monthly Operating Report Enclosed please find Monthly Operating Report 04-01. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of January, 2004 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:

H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector

OPERATING DATA REPORT DOCKET NO.

50443 UNIT Seabrook I DATE February 1, 2004 COMPLETED BY P. E. Nardone TELEPHONE (603) 773-7074 OPERATING STATUS

1. Unit Name:

Seabrook Station Unit 1

2.

Reporting Period:

JANUARY 2004

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1148.0

5.

Maximum Dependable Capacity (Net MWe):

1155.3

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

Not Applicable Since Last Report, Give Reasons:

This Month Yr-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 744.0 744.0 103573.8

8. Hours Generator On-Line 744.0 744.0 100658.3
9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10.

Net Electrical Energy Generated (MWH) 861272 861272 113315604 OPERATING

SUMMARY

The unit operated at 100% power except for fifteen hours this month. Power was reduced on four separate occasions (98%) to facilitate repairs to vital inverter IC and IA. This yielded an availability factor of 100% and a capacity factor of 100.20% based on the MDC value of 1155.3 Net MWe.

I of 2

.1s II UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50443 UNIT Seabrook 1 DATE February 1, 2004 COMPLETED BY P. E. Nardone TELEPI lONE (603) 773-7074 MONTH: JANUARY 2004 NO.

DATE TYPE' DURATION REASON 2 METIHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR 3 COMhMENTS No entries for this month.

2 3

F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 -Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 -Other (Explain)

F - Administrative G - Operational Error (Explain) l1-Other (Explain) 2of2