PY-CEI-NRR-0990, Forwards LERs 89-005,89-006 & 89-007 for Perry Unit 1

From kanterella
Jump to navigation Jump to search
Forwards LERs89-005,89-006 & 89-007 for Perry Unit 1
ML20247K162
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/27/1989
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247K166 List:
References
PY-CEI-NRR-0990, PY-CEI-NRR-990, NUDOCS 8904050181
Download: ML20247K162 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - .

. -4 THE CLEVELAND ELECTRIC ILLUMINATING COMPANY P.O. BOX 97 N PERRY, OHIO 44081 E TELEPHONE (216) 259-3737 N ADDRESS 10 CENTER ROAD FROM CLEVELAND: 261 1650 Serving The Best Location in the Nation Al Kaplan PERRY NUCLEAR POWER PLANT VICE PAESIDENT NUOLE AA GAOUP March 27, 1989 PY-CEI/NRR-0990 L U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 LERs 890' 5, 89006 and 89007

Dear Sir:

Enclosed are Licensee Event Reports 89005, C9006 and 89007 for the Perry Nuclear Power Plant.

Very truly y,ours, Al Kaplan Vice President Nuclear Group AK/sc

Enclosure:

LERs 89005, 89006 and 89007 cc: T. Colburn NRC Resident Inspector U.S. Nuclear Regulatory Commission 799 Roosevelt Road .

Glen Ellyn, Illinois 60137 f6h 1 i

DO$K$$ofkO PDC

- - _ - - - - - - -