PY-CEI-NRR-0493, Forwards Perry Nuclear Power Plant Control Room Validation Summary Rept, Per Section 2.7 of Suppl 1 to Dcrdr.Submittal Re Control Room Review Process,Required Prior to Issuance of Full Power Ol,Completed

From kanterella
Jump to navigation Jump to search
Forwards Perry Nuclear Power Plant Control Room Validation Summary Rept, Per Section 2.7 of Suppl 1 to Dcrdr.Submittal Re Control Room Review Process,Required Prior to Issuance of Full Power Ol,Completed
ML20202F329
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/11/1986
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML20202F335 List:
References
PY-CEI-NRR-0493, PY-CEI-NRR-493, NUDOCS 8607150143
Download: ML20202F329 (1)


Text

THE CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY P O BOX 5000 - CLEVELAND. oHlo 44101 - TELEPHONE (216) 622-98M - ILLUMINATING BLDG - 55 PUBLICSoVARE Serving The Best Locarian in the Nation MURRAY R. EDELMAN SR VCE PRESCENT NUCLEAR July 11, 1986 PY-CEI/NRR-0493 L Dr. W. R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Control Room Validation Summary Report

Dear Dr. Butler:

We are hereby submitting the Perry Nuclear Power Plant Control Room Validation Report in accordance with our commitment made in Section 2.7 of the Detailed Control Room Design Review, Supplement 1, submitted by our letter of October 2, 1986 (PY-CEI/NRR-0373 L). This completes (ur submittals related to control room review process required prior to issuance of the full power license.

Should you have any questions, please feel free to call me.

Very truly yours, N

Murray R. Edelman Senior Vice President l Nuclear Group ,

MRE:njc Enclosure )

cc: Jay Silberg, Esq.

John Stefano (2)

J. Grobe 8607150143 860711 PDR A

ADOCK 05000440 $$

PDR h A L

)