MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl IR 05000445/19983011998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J Oconnor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant IR 05000445/19930991993-08-0404 August 1993 Notification of Significant Licensee Meeting W/Util on 930818 to Discuss Results of SALP Repts 50-445/93-99 & 50-446/93-99 ML20045C8631993-06-18018 June 1993 Notification of Significant Licensee Meeting W/Util on 930708 to Discuss Results of Internal Evaluation of 930515 Power Increase in Excess of Procedurally Prescribed Limits & to Address Concerns in Listed Insp Repts ML20035H6251993-04-30030 April 1993 Notifies Commission That Staff Will Not Issue Directors Decision Re 10CFR2.206 Petition by Natl Whistleblower Ctr Issued in Apr 1993.Decision Expected to Be Issued by Mid May 1993 ML20035C2171993-03-30030 March 1993 Discusses Comanche Peak Unit 2 Full Power Licensing.Addl Info Re Current 10CFR2.206 Petitions & Technical Info Re Thermo-Lag Encl ML20035C2251993-03-29029 March 1993 Recommends Issuance of Full Power OL for Comanche Peak Steam Electric Station Unit 2.Basis for Recommendation Contained in 930201 Readiness Assessment & Addl Info Submitted ML20034G7471993-03-0808 March 1993 Forwards Corrected Footnote Five of NRC Staff Reply to Cfur Request for Hearing & Leave to Intervene, ML20046C9661993-02-18018 February 1993 Notifies of NRC 930128 Meeting W/Numarc to Discuss NUMARC Plans to co-fund Performance of Ampacity Derating Tests of Fire Barrier Configurations Assembled by Util at Omega Point Labs.List of Attendees Encl ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl IR 05000445/19983011998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J Oconnor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant IR 05000445/19930991993-08-0404 August 1993 Notification of Significant Licensee Meeting W/Util on 930818 to Discuss Results of SALP Repts 50-445/93-99 & 50-446/93-99 ML20045C8631993-06-18018 June 1993 Notification of Significant Licensee Meeting W/Util on 930708 to Discuss Results of Internal Evaluation of 930515 Power Increase in Excess of Procedurally Prescribed Limits & to Address Concerns in Listed Insp Repts ML20035H6251993-04-30030 April 1993 Notifies Commission That Staff Will Not Issue Directors Decision Re 10CFR2.206 Petition by Natl Whistleblower Ctr Issued in Apr 1993.Decision Expected to Be Issued by Mid May 1993 ML20035C5221993-04-0606 April 1993 Staff Requirements Memo Re SECY-93-083,w/respect to 930406 Motion for Stay of Full Power License for Comanche Peak Unit 2 & Petition to Intervene in Comanche Peak Proceedings ML20035C2171993-03-30030 March 1993 Discusses Comanche Peak Unit 2 Full Power Licensing.Addl Info Re Current 10CFR2.206 Petitions & Technical Info Re Thermo-Lag Encl ML20035C2251993-03-29029 March 1993 Recommends Issuance of Full Power OL for Comanche Peak Steam Electric Station Unit 2.Basis for Recommendation Contained in 930201 Readiness Assessment & Addl Info Submitted ML20034G7471993-03-0808 March 1993 Forwards Corrected Footnote Five of NRC Staff Reply to Cfur Request for Hearing & Leave to Intervene, ML20046C9661993-02-18018 February 1993 Notifies of NRC 930128 Meeting W/Numarc to Discuss NUMARC Plans to co-fund Performance of Ampacity Derating Tests of Fire Barrier Configurations Assembled by Util at Omega Point Labs.List of Attendees Encl ML20128H2931993-02-10010 February 1993 Staff Requirements Memo Re Emergency Motion to Stay Issuance of low-power Operating License.Staff Issued Order Denying Motion ML20128E4301993-02-0505 February 1993 Staff Requirements Memo Re 930129 Affirmation/Discussion & Vote on SECY-93-016 Discussing FRN Concerning Proposed Issuance of OL ML20062J1941993-02-0303 February 1993 Board Notification 93-001:notifies of 930202 Emergency Motion to Stay Issuance of low-power OL Requesting Listed Items Including Issue Order Staying Issuance of License ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities 1999-08-27
[Table view] |
Text
,
[}*,
- /..
a- /
((
UNITED STATES NUCLEAR REGULATORY COMMISSION C AtR 6 9 o
WASHINGTON, D. C. 20$55 3
)
FEB 181987 MEMORANDUM FOR:
Guy Arlotto, Chairman l
Comanche Peak Report Review Group FROM:
James H. Sniezek Deputy Executive Director Regional Operations and Generic Requirements
SUBJECT:
NPC POLICY AND PPOCEDURES FOR PROCESSING INSPECTION FINDINGS In response to John Davis' letter to me of February 9,1987, same subject as above, the following documents may have some bearing on your review of policy and guidance on control and processing of inspection and enforcement findings:
1.
EDO policy statement on the distribution of draft inspection and investigation reports dated October 7, 1983.
2.
EDO policy statement on control of NRC reports and other documents dated December 3, 1984.
3.
Region IV memorandum to ED0 on policy for control of NRC reports and other documents, dated January 2, 1985.
4.
EDO memorandum of April 23, 1985 to Region IV providing comments on, reference number 3 above.
5.
IE memorandum to EDO, ADM and Regional Administrators on control of inspection and enforcement documents, dated February 10, 1986.
6.
EDO memorandum of February 19,~1986, to IE providing comments on IE memorandum of February 10, 1986, copies also provided to Regional Administrators, reference number 5 above.
7.
IE Manual Chapter 0620, Control of Inspection and Enforcement Documents.
8.
EDO memorandum of February 6,1987 to IE providing comments on draft IE Manual Chapter 0617, Resolution of Difference of Opinion about Inspection Fi.id:ngs.
- -m -
fw h;74225hF
~2-FEB 181987 i
(;opies of the above listed documents are enclosed.
If you have any questions concerning these documents, please contact Bill Brach, 492-4359.
1044-a is H. Sniezek De ty Executive Director e ional Operations and Generic requirements
Enclosures:
As stated cc w/ enc 1:
V. Stello R. Erickson 1
s
N.fk[rk, y /3 ;
n
![,,
UNITED STATES NUCLEAR REGULATORY COMMISSION'
{
WASHINGTON, D. c. 20S$5
\\
/
OCT 0 7 W I
MEMORANDUM FOR:
Richard C. DeYoung, Director, IE l
Thomas E. Murley, Regional Administrator, RI James P. O'Reilly, Regional Administrator, RII James G. Keppler, Regional Administrator, RIII John T. Collins, Regional Administrator, RIV John B. Martin, Regional Administrator, RV FROM:
William J. Dircks Executive Director for Operations
SUBJECT:
POLICY ON THE DISTRIBUTION OF ORAFT INSPECTION AND INVESTIGATION REPORTS I have reviewed your connents with regard to the policy on distribution of draft inspection reports stated in my memoranda of March 24 and July 30, 1982.
I have also discussed our policy on release of draft investigation reports with the Directors of 01 and OIA.
The primary motivation of this policy statement is to ensure that official NRC documents, and their inspection and investigative conclusions, are published without any taint, either real or perceived, of improper influence by those we regulate. Moreover, we will reinforce policies which strengthen the authority of the NRC field staff to connent freely on safety issues at the preliminary stages of fact collection and evaluation. The basic problem to be addressed by this policy is the fact that licensees shall not be afforded opportunities to modify NRC documents to their advantage outside the public arena.
In order to give suitable consideration to these issues, the policies stated in my memoranda of March 24 and July 30., 1982 are superseded by the following:
A.
Objectives The following statements reflect the basic objectives of this policy statement:
1.
To ensure that sufficient flexibility is provided to the Regional Administrators so that they and their staffs will not hesitate to disseminate safety-related infonnation to licensees during the inspection / investigation process, prior to distribution of the final reports, and i
2.
To ensure that inspection / investigation findings accurately
{
represent the facts collected by, and the conclusions crawn by, the NRC staff, without improper influences by licensees or their agents j
f gh W
J w g s i t c' I (o,
c.
2 on the content and/or conclusions of NRC reports of inspections or investigations.
B.
Safety and Security Issue Communications NRC policy recognizes that nuclear safety and security concerns must be addressed by prompt, positive actions. Accordingly, safety or security infomation must be promptly and clearly identified to responsible licensee management to obtain prompt licensee evaluation and, if appro-priate, safety-related corrective actions. Such clear communications are necessary to maintaining required levels of safety and security at licensed facilities. When such communications are made as a result of concerns that arise during the course of an inspection / investigation, the fact of the communication should be noted in the inspection / investigation report, and a copy of any written communication should be included in the report.
Where approved by regional' management, inspectors may, in preparation for exit interviews or enforcement meetings, provide to the licensee a listing o,f significant issues developed in the course of an inspection, in order to facilitate communication of inspection findings which require corrective action. However, notes, draft reports, draft evaluations, draft notices of v.iolations or non-compliance, or other material i
containing preliminary inspection conclusions, findings and recommendations.are not to be provided to the licensee, except as required by safety or security concerns, as noted above.
Briefing materials prepared by the staff for use in meetings with licensees occasioned by inspection activities should be reviewed by regional management prior to distribution.at a meeting, and appended to the inspection report.
C.
Release of Draft Inscection Reports Under no circumstances should draft inspection reports, either in their i
entirety or excerpts from them, be released to licensees or their agents, or i
to any source external to the NRC without the express permission of the EDO.,
For the purposes of this policy, a draft inspection report is the preliminary draft of the document which will provide the account and conclusions of an official NRC inspection.
It is to be considered a draft inspection report from its initial development, and throughout the period of supervisory and management review, until final publication and distribution in accordance with IE Manual Chapter 1025.
In the event any draft inspection report is inadvertently or otherwise released contrary to this policy, the EDO should be promptly advised in writing. The EDO will take or recomend action as appropriate.
r, s.
3 0..
. Release of Oraft Investigation Reports For the purposes 'of this pclicy, a draft investigation report is the preliminary draft of the document which will provide the account and findings of an official NRC inquiry or investigation.
It is to be considered a draft investigation report from its initial development, and throughout the period of supervisory and management review, until final publication.
It is important to realize that OI is required by Comission directives to inform Regional Administrators of safety and security issues as they are developed in the course of an investigation.
Regional Administrators shall act on this-information in accordance with the policies set forth above for the prompt communication of safety and security issues, and in addition shall observe the following procedure.
The Regional Administrator shall inform the Director. 01, in advance that infomation related to an open investigation is being considered for release to the licensee because safety or security concerns require initiation of corrective actions before publication of the investigation report. The Director OI, should review the information.to be released and advise the Regional Administrator of the anticipated effect of its release on the course of the investigation. The Regional Administrator will release the.information only after detemining that the safety or security concerns are significant enough to justify the risk of compromising the effectiveness of the investigation and, possibly, subsequent enforcement or prosecution options. Any such release of information should be recorded in the investigation report.
Pursuant to Comission approved OI policy, ~ draft OI reports of investigation will not be circulated outside the NRC without the specific approval of the Chairman.
(OIA draft reports of investigation will under no circumstances be reviewed with or given to licensees, their agents, or to any source external to NRC, without the express pemission of the Director, OIA.) Requests for such pemission should be made through the EDO.
In the case of an emergency appearing to require immediate action, NRC personnel shall provide the licensee with any information they judge the circumstances warrant.
If time permits, regional management should be consulted first.
1
1 4
The foregoing policies are effective immediately.
The EDO, following an appropriate evaluation period for this policy, will incorporate this policy into the NRC Manual. 'Also, the EDO is reviewing existing procedures and practices related to other types of communications under the cognizance of other NRC Offices and will issue policy guidance where deemed appropriate.
i Willia J. Dircks Executive Director for Operations cc:
H. Denton J. Davis R. Minogue G. Messenger
- 8. Hayes I
/[
3 UNITED STATES NUCLEAR REGULATORY COMMISSION o
3 E
WASHINGTON, D. C. 20555 l
DEC3 1984 MEMORANDUM FOR:
Office Directors Regional Administrators FROM:
William J. Dircks Executive Director for Operations j
SUBJECT:
POLICY ON CONTROL OF NRC REPORTS AND OTHER DOCUMENTS On.0ctober 7, 1983, I issued a policy statement regarding the distribution of draft inspection and investigation reports.
Since that time, other events have occurred that indicate the need for a general policy statement that addresses the release of all NRC reports add other documents, either in their draft or final form.
That policy statement is enclosed.
The major premise of the enclosed policy statement is that documents will not be provided to one licensee or member of the public unless they can be made available (generally through the Public Document Room) to all.
Nothing in the enclosed policy statement should be construed as a relaxation.of my October 1983 policy statement.
Rather, it is my intent that the procedures, developed in response to the enclosed policy statement be consistent with the specific directions in my October 1983 policy statement.
As an amplification of my October 1983 policy, you should also establish procedures to ensure that 01 is promptly informed whenever a material false statement is suspected.
Additionally, matters being referred to 01 should be coordinated with OI prior to advising a licensee of the potential referral.
To assure overall consistency and completeness your procedures should be forwarded to DEDROGR for review and comment.
By copy of this memo, I am directing the Office of Administration to incorporate these policies into appropriate NRC Manual Chapters.
/
3 William}'J.Dircks 4
'1 -
/. s l
l Executive Director for Operations
Enclosure:
As stated
}
cc:
Chairman Palladino Commissioner Roberts Commissioner Asselstine Ccamissioner Bernthal Commissioner Zech V. Stello, DEDROGR SECY OPE OGC JgglD l
r.
9
)
POLICY ON CONTROL OF NRC REPORTS AND OTHER DOCUMENTS I
INTRODUCTION l
NRC must act promptly and positively on nuclear safety and safeguards concerns, Such concerns must be identified promptly, documented and made known to respon-j sible licensee management to obtain prompt evaluation and appropriate cor-rective action.
At the same time, NRC documents must be developed and issued without improper licensee or public influence, or the appearance thereof, and must be made available to the. public in a timely manner, consistent with NRC regulations, policies and procedures.
OBJECTIVES The objectives of this policy statement with regard to both plant-specific and generic NRC reports and other documents (referred to hereinafter as " documents")
are:
l '.
To provide.NRC staff with general policy guidance on the release and distribution of draft and final documents.
2.
To assure that staff documents are developed and issued without improper influences, real or perceived, by the public or by applicants, licensees, permittees or their subcontractors or agents (referred to hereinafter as
" licensees") and are made available promptly to the public.
3.
.To assure that sufficient flexibility is provided to Office Directors and Regional Administrators so that they and their staffs will not hesitate to disseminate appropriate safety or safeguards information to licensees, before distribution of final documents.
POLICY For the purpose of this policy, the term " documents" encompasses all written material considered to be NRC records under 10 CFR Part 9.
A draft document is to be considered a draft from its initial development throughout the period of
)
review until its issuance as a final document.
A final document is one that has been signed or otherwise approved for publication and distribution.
Final documents will be distributed in a manner that will ensure that the public, the licensees, NRC contractors and Government agencies have access to information they need to fulfill their responsibilities.
Final documents provided to licensees will be placed in the Public Document Room (PDR).
Any decision under this policy to place documents in the PER must also be con-sistent with NRC regulations, policies and procedures regrrding confidentiality, security, safeguards, proprietary, and Privacy Act Information and investigative matters.
'.i Draft documents, or information contained therein, are not to be discussed with,. given to,' or shown to any licensee or the public by NRC staff without prior approval.
i Predecisional interagency or intraagency memoranda and letters shall not be provided to licensees or the public or placed in the PDR without prior -
management approval.
In the event any document is inadvertently or otherwise released by the NRC, its contractors or other Government agencies contrary to this policy, the EDO should be advised promptly in writing of the occurrence and the corrective action to be taken by the responsible Office to avoid recurrence of such release.
Normally, under such circumstances, the released document should be placed. in the PDR.
EXCEPTIONS In the event there is an emergency, or a significant safety or safeguards issue appears to require immediate action, NRC personnel, at their discretion, may discuss with, show to, or provide the licensee with any pertinent material they believe the circumstances warrant.
In the normal course of conducting regulatory activities, communications with licensees, vendors,. industry representatives and other Government agencies are at times' necessary regarding initial NRC staff positions, license conditions, confirmation of action letters, inspection findings, preparation of bulletins and information notices, events at other facilities, etc.
Such communications can be held in advance of the final NRC documents for the purpose of (1) gaining factual information, (2) assessing the cost, feasibility and benefit of, or alternatives to, proposed actions, or (3) alerting licensees to initial staff positions or safety findings in order that corrective actions can be initiated promptly.
This policy statement is not intended to impede such exchanges of information.
Any written communications provided by the staff to licensees or the public shall, however, be placed in the PDR.
Draft research reports, studies, data or other documentation based on information obtained from a licensee or vendor, which may be discussed or exchanged with those parties and other participants in a study or research program, are not subject to restraint under this policy statement.
Draft proposed and final rules, policy statements and other documents pertaining to materials regulated by the Agreement States may be sent to the Agreement States for comment and are not subject to restraint under this policy.
l l
Nothing in the policy statement shall automatically preclude the release of agency records pursuant to a fo> mal request under the Freedom of Information Act.
IMPLEMENTATION Program and Regional Offices are expected to develop and implement procedures l
that reflect this policy.
IE, NMSS and NRR, in coordination with Regional Offices, should develop generic procedures for use by the Regional Offices regarding inspection, fuels and materials licensing and reactor licensing, respectively.
4 0
4 6