ML20238A485

From kanterella
Jump to navigation Jump to search
Forwards Memo from Goldberg Advising That Chart on Pages 34 & 35 of Comanche Peak Rept Does Not Accurately Characterize Analysis of Technical Issues Performed to Determine Region IV Actions Re Insp Findings & Violations
ML20238A485
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/06/1987
From: Connelly S
NRC OFFICE OF INSPECTOR & AUDITOR (OIA)
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20237K807 List: ... further results
References
NUDOCS 8708200496
Download: ML20238A485 (1)


Text

- --

CPRRG - 5 g[/

n.

a. -v

/ essoq'o Cys:- Ro2 Rehm

?

UNIT.ED STATES

~~

n zek g

8.

g NUCLEAR REGULATORY COMMISSION RMartin i

j WASHINGTON,0. C. 20555 _

Taylor t"%,

    • /

c.c s JMurray c.

u.h4 January 6, 1987 m-3 0~

MEMORANDUM FOR: Victor Stello

( 6. g5 Executiva Director for Operations FROM:

Sharon R. Con;;elly, Director q

Office of Inspector and Auditor a

SUBJECT:

OIA COMANCHE PEAK REPORT Attached is a memorandum from Mr. Stephen Goldberg in which he advises me that a

the chart on pages 34 and 35 of the Comanche Peak report does not accurately characterize the_ analysis of technical issues he performed to determine j

whether Region IV management appropriately downgraded, changed or deleted inspection findings and violations. Mr. Goldberg's complete analysis, which is included in the report, remains unchanged and there is no effect on the conclusions of tha report.

f

lb Sharon R Connelly, Direc or Office of Inspector and Auditor

Attachment:

As Stated cc: Commission (S),w/ attach J

J. Fouchard PA,w/ attach 3

C. Kammerer CA, w/ attach T. Scarbrough, ASLAP, w/ attach

~

t

)

8708200496 070312 PDR ADOCK 05000445 G

PDR

_