Letter Sequence RAI |
---|
|
|
MONTHYEARML20236P3011998-07-13013 July 1998 Forwards RAI Re Licensee 970214,0602 & 980213 Responses to GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions. Response Requested by 980930 Project stage: RAI ML20207A5401999-04-29029 April 1999 Informs That Licensee 980930 Response to GL 96-06,appears to Be Reasonable & Appropriate for Specific Design & Configuration of RB Emergency Cooling at Plant,Unit 1 & That Staff Satisfied with Licensee Resolution of Waterhammer Project stage: Other ML20207B6441999-05-26026 May 1999 Summary of 990507 Meeting with Gpu Nuclear,Inc in Rockville, MD Re Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issues.List of Attendees & Copy of Licensee Handout Used at Meeting Encl Project stage: Meeting 1999-04-29
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L0061999-10-0101 October 1999 Discusses GL 97-06 Issued by NRC on 971231 & Gpu Response for Three Mile Island .Staff Reviewed Response & Found No New Concerns with Condition of SG Internals or with Insp Practices Used to Detect Degradation of SG Internals ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212K8771999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Three Mile Island on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Provides Historical Listing of Plant Issues & Insp Schedule ML20212K8551999-09-30030 September 1999 Informs That During 990921 Telcon Between P Bissett & F Kacinko,Arrangements Were Made for Administration of Licensing Exams at Facility During Wk of 000214.Outlines Should Be Provided to NRC by 991122 ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212J0011999-09-27027 September 1999 Forwards Insp Rept 50-289/99-07 on 990828.No Violations Noted ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211A4261999-08-19019 August 1999 Forwards Insp Rept 50-289/99-04 on 990606-0717.Two Severity Level 4 Violations Occurred & Being Treated as Noncited Violations ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210N7601999-08-10010 August 1999 Informs That NRC Staff Reviewed Applications Dtd 990629, Which Requested Review & Approval to Allow Authority to Possess Radioactive Matl Without Unit Distinction Between Units 1 & 2.Forwards RAI Re License Amend Request 285 ML20210N7191999-08-0606 August 1999 Forwards Notice of Partial Denial of Amend to FOL & Opportunity for Hearing Re Proposed Change to TS 3.1.12.3 to Add LCO That Would Allow Continued HPI Operation ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210B8231999-07-21021 July 1999 Forwards Exemption from Certain Requirements of 10CFR50.54(w) for Three Mile Island Nuclear Station,Unit 2 in Response to Licensee Application Dtd 990309,requesting Reduction in Amount of Insurance for Unit to Amount Listed ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20209H9401999-07-15015 July 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Application for Exemption Dtd 990309. Proposed Exemption Would Reduce Amount of Insurance for Onsite Property Damage Coverage as Listed ML20209G2451999-07-15015 July 1999 Advises That Suppl Info in Support of Proposed License Transfer & Conforming Adminstrative License Amends,Submitted in & Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident ML20216D9861999-07-12012 July 1999 Forwards RAI Re 981019 Application Request for Review & Approval of Operability & SRs for Remote Shutdown Sys. Response Requested within 30 Days of Receipt of Ltr ML20209G5861999-07-0909 July 1999 Forwards Insp Rept 50-289/99-05 on 990510-28.No Violations Noted ML20209F2571999-07-0909 July 1999 Forwards Staff Evaluation Rept of Individual Plant Exam of External Events Submittal on Three Mile Nuclear Station, Unit 1 ML20209D8451999-07-0808 July 1999 Forwards Insp Rept 50-289/99-06 on 990608-11.No Violations Noted.Overall Performance of ERO Very Good & Demonstrated, with Reasonable Assurance,That Onsite Emergency Plans Adequate & That Util Capable of Implementing Plan ML20209D6291999-07-0808 July 1999 Forwards Notice of Withdrawal & Corrected TS Pages 3-21 & 4-9 for Amend 211 & 4-5a,4-38 & 6-3 for Amend 212,which Was Issued in Error.Amends Failed to Reflect Previously Changes Granted by Amends 203 & 204 ML20209D5141999-07-0808 July 1999 Forwards RAI Re 981019 Application & Suppl ,which Requested Review & Approval of Revised Rc Allowable Dose Equivalent I-131 Activity Limit with Max Dose Equivalent Limit of 1.0 Uci/Gram.Response Requested within 30 Days 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L0061999-10-0101 October 1999 Discusses GL 97-06 Issued by NRC on 971231 & Gpu Response for Three Mile Island .Staff Reviewed Response & Found No New Concerns with Condition of SG Internals or with Insp Practices Used to Detect Degradation of SG Internals ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212K8771999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Three Mile Island on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Provides Historical Listing of Plant Issues & Insp Schedule ML20212K8551999-09-30030 September 1999 Informs That During 990921 Telcon Between P Bissett & F Kacinko,Arrangements Were Made for Administration of Licensing Exams at Facility During Wk of 000214.Outlines Should Be Provided to NRC by 991122 ML20212J0011999-09-27027 September 1999 Forwards Insp Rept 50-289/99-07 on 990828.No Violations Noted ML20211A4261999-08-19019 August 1999 Forwards Insp Rept 50-289/99-04 on 990606-0717.Two Severity Level 4 Violations Occurred & Being Treated as Noncited Violations ML20210N7601999-08-10010 August 1999 Informs That NRC Staff Reviewed Applications Dtd 990629, Which Requested Review & Approval to Allow Authority to Possess Radioactive Matl Without Unit Distinction Between Units 1 & 2.Forwards RAI Re License Amend Request 285 ML20210N7191999-08-0606 August 1999 Forwards Notice of Partial Denial of Amend to FOL & Opportunity for Hearing Re Proposed Change to TS 3.1.12.3 to Add LCO That Would Allow Continued HPI Operation ML20210B8231999-07-21021 July 1999 Forwards Exemption from Certain Requirements of 10CFR50.54(w) for Three Mile Island Nuclear Station,Unit 2 in Response to Licensee Application Dtd 990309,requesting Reduction in Amount of Insurance for Unit to Amount Listed ML20209H9401999-07-15015 July 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Application for Exemption Dtd 990309. Proposed Exemption Would Reduce Amount of Insurance for Onsite Property Damage Coverage as Listed ML20209G2451999-07-15015 July 1999 Advises That Suppl Info in Support of Proposed License Transfer & Conforming Adminstrative License Amends,Submitted in & Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20216D9861999-07-12012 July 1999 Forwards RAI Re 981019 Application Request for Review & Approval of Operability & SRs for Remote Shutdown Sys. Response Requested within 30 Days of Receipt of Ltr ML20209F2571999-07-0909 July 1999 Forwards Staff Evaluation Rept of Individual Plant Exam of External Events Submittal on Three Mile Nuclear Station, Unit 1 ML20209G5861999-07-0909 July 1999 Forwards Insp Rept 50-289/99-05 on 990510-28.No Violations Noted ML20209D8451999-07-0808 July 1999 Forwards Insp Rept 50-289/99-06 on 990608-11.No Violations Noted.Overall Performance of ERO Very Good & Demonstrated, with Reasonable Assurance,That Onsite Emergency Plans Adequate & That Util Capable of Implementing Plan ML20209D6291999-07-0808 July 1999 Forwards Notice of Withdrawal & Corrected TS Pages 3-21 & 4-9 for Amend 211 & 4-5a,4-38 & 6-3 for Amend 212,which Was Issued in Error.Amends Failed to Reflect Previously Changes Granted by Amends 203 & 204 ML20209D5141999-07-0808 July 1999 Forwards RAI Re 981019 Application & Suppl ,which Requested Review & Approval of Revised Rc Allowable Dose Equivalent I-131 Activity Limit with Max Dose Equivalent Limit of 1.0 Uci/Gram.Response Requested within 30 Days ML20196J5631999-07-0101 July 1999 Informs That Util 981203 Joint Application with Amergen Energy Co Marked Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20196J5741999-06-30030 June 1999 Informs That as Result of Staff Review of Util Response to GL 92-01,rev 1,suppl 1,info Provided in Support of PT Limits License Amend & B&W Topical Rept,Staff Revised Info for Plant,Unit 1,in Reactor Vessel Integrity Database ML20196H6811999-06-29029 June 1999 Forwards Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted.However,Adequacy of Assessment of Reactor Bldg Emergency Cooler Operability Prior to Conducting Maintenance on One Reactor Bldg Spray Sys,Questionable ML20212H8711999-06-21021 June 1999 Discusses Updated Schedule Commitment Submitted by Gpu on 990602 for Implementing Thermo-Lag 330-1 Fire Barrier C/As & Completion of Thermo-Lag Effort at TMI-1.Informs NRC Will Incorporate Commitment Into Co Modifying License ML20195K2821999-06-17017 June 1999 Forwards Request for Addl Info Re Kinetic Expansion Region Inspection Acceptance Criteria ML20212H6621999-06-0404 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ss Bajwa Will Be Section Chief for Three Mile Island Nuclear Station ML20207E7201999-05-27027 May 1999 Discusses Reorganization of Nrr,Effective 990328. Organization Chart Encl ML20207B6541999-05-27027 May 1999 Forwards SER Accepting Util Program to Periodically Verify design-basis Capability of safety-related MOV at TMI-1 & That Util Adequately Addressed Actions Requested in GL 96-05 ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206S3411999-05-14014 May 1999 Forwards Insp Rept 50-289/99-02 on 990314-0424.Violations Occurred & Being Treated as non-cited Violations.Security Program Was Inspected During Period & Found to Be Effective ML20206N5831999-05-13013 May 1999 Requests Description of Proposed Corrective Actions for Fire Zones AB-FZ-3,AB-FZ-5,AB-FZ-7,FH-FZ-2,CB-FA-1 & FH-FZ-6. Confirmation That Corrective Actions & Commitments Made Will Be Completed by 991231,requested IR 05000298/19980091999-05-12012 May 1999 Refers to Insp Rept 50-298/98-09 Conducted Between 981227-990130.During Insp,Apparent Violation of 10CFR50.50 Identified & Being Treated as non-cited ML20206H3571999-05-0606 May 1999 Forwards RAI Re 981203 Application & Suppls & 0416,requesting Review & Approval of Revised Core Protection SL & Bases for TMI-1 to Reflect Average of 20% of Tubes Plugged Per Sg.Response Requested within 10 Days of Receipt ML20207A5401999-04-29029 April 1999 Informs That Licensee 980930 Response to GL 96-06,appears to Be Reasonable & Appropriate for Specific Design & Configuration of RB Emergency Cooling at Plant,Unit 1 & That Staff Satisfied with Licensee Resolution of Waterhammer ML20206D4001999-04-20020 April 1999 Informs of Completion of Review of Gpu Request for Exemption Submitted on 961231,970908,971230,980521,981014,981125 & 981223 from Requirements of 10CFR50,App R,Section III.G.2 for TMI Unit 1.Forwards Exemption & Safety Evaluation ML20205S6791999-04-16016 April 1999 Forwards Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted.Identification by Licensee Staff of Elevated Tritium Activity in Monitoring Well Led to Investigation & Identification of Leak from Buried Radwaste Path ML20205P3391999-04-0909 April 1999 Discusses Results of Plant Performance Review for Three Mile Island Completed on 990225.Historical Listing of Plant Issues That Were Considered During PPR Encl IR 05000289/19980061999-03-26026 March 1999 Ack Receipt of 981112 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-289/98-06 .Action Does Not Change NRC Determination That Change to Hpis Valve Configuration Involved URI ML20204E3911999-03-17017 March 1999 Informs That Region I Plans to Conduct Open Predecisional Enforcement Conference to Discuss Apparent Violations Re Efs Issues as Described in Insp Rept 50-289/98-09,per ML20204B6771999-03-15015 March 1999 Submits Withdrawal of Amend Request for Operating License DPR-46.Proposed Change Would Have Modified Facility TSs Pertaining to Neutron Monitoring Neutron Detectors ML20207H7391999-03-0505 March 1999 Forwards Insp Rept 50-289/98-09 on 981227-990130.Two Apparent Violations Being Considered for Enforcement Action.First Violation Deals with Failure to Follow Procedures for Control of Emergency Boration Source ML20203F4911999-02-0505 February 1999 Forwards Request for Addl Info Re Licensee 981125 Amend Application Re TS Change Request 277 for OTSG Inservice Insp During 13R for Three Mile Island,Unit 1 ML20202H6771999-02-0303 February 1999 Documents Basis for NRC Staff Generic Approval of Requests to Relocate TS Requirements from Tss.Staff Generic SER Finding Relative to Relocated TS Requirements Encl ML20196K3511999-01-22022 January 1999 Refers to Gpu Responses to Second NRC RAI Re GL 92-08 & Review of Gpu Analytical Approach for Ampacity Derating Determinations.Forwards SE & SNL Technical Ltr Rept Concluding That No Outstanding Safety Concerns Identified ML20199H6471999-01-20020 January 1999 Forwards RAI Re Gpu TS Change Request 277 OTSG Cycle 13 for Plant Unit 1.NRC Has Determined That Addl Info Needed to Complete Review ML20199G7401999-01-12012 January 1999 Forwards Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted.Operator Workaround Program Found to Be Acceptable ML20206S0221999-01-0808 January 1999 Responds to Re Changes to Physical Security Plan Identified as Rev 38,submitted Under Provisions of 10CFR50.54(p).Based on NRC Determination,Changes Do Not Decrease Overall Effectiveness of Security Plan 1999-09-30
[Table view] |
Text
- _ - - - _ .
July 13, 1998'
. - *Mr. J:mes W. Langenbach, Vice PTsitnt cnd Director- TMl GPU Nuclerr, Inc.
P.O. Box 480 Middletown, PA 17057
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING GPU NUCLEAR RESPONSE TO GENERIC LETTER (GL) 96-06 FOR THE THREE MILE ISLAND <
NUCLEAR STATION, UNIT 1 (TMI-1)(TAC NO. M96877) I
Dear Mr. Langenbach:
The staff has reviewed your letters dated February 14, and June 2,1997, and February 13,1998, regarding GL 96-06, " Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Conditions." The February 14,1997, submittal addresses the issues of waterhammer, two-phase flow, and thermally-induced pressurization of piping runs penetrating the containment for TMI Unit 1. The June 2,1997, submittal contained a description of your planned corrective actions. The February 13,1998, submittal provided a summary of your evaluations. The staff has determined that it will need the additional information identified in i
the enclosure to complete its review of your responses. Please respond to this request for !
additional information by September 30,1998, in order for the staff to remain on schedule with its review.
Sincerely, Original signed by Timothy G. Colbum, Senior Project Manager Project Directorate 1-3 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Docket No. 50-289
Enclosure:
Request for Additionallaformation g ,, c- 4 ,
y ,.rp p cc w/ encl: See next page 3 " ' " " ^ ^ '~
l DISTRIBUTION
, Docket File ACRS RWessman TCollins PUBLIC CHehl, R1 OGC PDl-3 r/f JZwolinski JTatum JFair TMarsh TClark y\gf DOCUMENT NAME: G:\COLBURN\gl9606.rai To receive a copy of this document, indicate in the box: "C" - Copy without
. attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy 0FrlCE PDI-3/PM l PDI 3/LA / , l l PDI 3fD lA) I l NAME TColburn @& TClark di[.Pc [ n C[
DATE
., /i l {' 9 )( *)/ / 3/ %,/? WJ/) 5}='T&
( OFFICIAL' RECORD COPY
9807160241 900713 PDR ADOCK 05000289 P PDR L_1-------------- - - - _ - - - - . -
. J.Langenbach Three Mile Island Nuclear Station, Unit No.1 cc:
Michael Ross Robert B. Borsum Director, O&M, TMl B&W Nuclear Technologies i
GPU Nuclear, Inc. Suite 525 P.O. Box 480 1700 Rockville Pike Middletown, PA 17057 Rockville, MD 20852
! John C. Fomicola William Domsife, Acting Director {
l Director, Planning and Bureau of Radiation Protection
. Regulatory Affairs Pennsylvania Department of GPU Nuclear, Inc. Environmental Resources l 100 Interpace Parkway P.O. Box 2063 Parsippany, NJ 07054 Harrisburg, PA 17120 l
Jack S. Wetmore Dr. Judith Johnsrud Manager, TMI Regulatory Affairs National Energy Committee GPU Nuclear, Inc. Sierra Club P.O. Box 480 433 Orlando Avenue Middletown, PA 17057 State College, PA 16803
!_ Emest L. Blake, Jr., Esquire Peter W. Eselgroth, Region I )
l Shaw, Pittman, Potts & Trowbridge U.S. Nuclear Regulatory Commission l 2300 N Street, NW. 475 Allendale Road l Washington, DC 20037 King of Prussia, PA 19406
-l Chairman l
Board of County Commissioners of Dauphin County ;
Dauphin County Courthouse '
i Harrisburg, PA 17120 I
Chairman Board of Supervisors I L
of Londonderry Township R.D. #1, Geyers Church Road ;
Middletown, PA 17057 Wayne L. Schmidt Senior Resident inspector (TMI-1)
U.S. Nuclear Regulatory Commission P.O. Box 219 I l Middletowrt PA 17057 '
l Regional Administrator l l Region 1 i
U.S. Nuclear Regulatory Commission i 475 Allendale Road King of Prussia, PA 19406
~
REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TMI-1)
RESPONSE TO GENERIC LETTER (GL) 96-06 (TAC NO. M96877) in its submittal of June 2,1997, the licensee identified eleven piping segments that are susceptible to thermally-induced over pressure. The licensee indicated that the Reactor Coolant Pump Goal Retum Line was demonstrated to be acceptable by analysis. The licensee also committed to instaff pressure protection for the remaining ten piping segments. In order to complete its review of the licensee's response to the GL, the staff needs additional information regarding the Reactor Coolant Pump Seal Retum Line piping segment which was found accepts,ble by analysis. Please provide the following information:
- 1. Provide the applicable design criteria for the piping and the valves. Include the required load combinations;
- 2. Provide a drawing of the piping run between the isolation valves. Include the lengths j and thicknesses of the piping segments and the type and thickness of the insulation;
- 3. Provide the maximum-calculated temperature and pressure for the pipe run.
Describe in detail the method used to calculate these pressure and temperature l values. This should include a discussion of the heat transfer model used in the l analysis and the basis for the heat trartsfer coefficients used in the analysis.
GL 96-06, " Assurance of Equipment Operability and Containment integrity During Design-Basis Accident Conditions," dated September 30,1996, included a request for licensees to evaluate cooling water systems that serve containment air coolers to assure that they are not vulnerable to waterhammer and two-phase flow conditions. The licensee provided its assessment of the waterhammer and two-phase flow issues for TMI-1 in letters dated February 14,1997, and February 13,1998. The licensee has determined that since a minimal amount of voiding will occur (<1%) in the reactor building emergency cooling (RBEC) system during the worst-case scenario, waterhammer and two-phase flow do not present a concem for TMI-1. The RBEC system provides cooling water for the containment air cooling units. In order to assess the licensee's resolution of these issues, the following additionalinformation is requested:
- 4. Provide a detailed description of the " worst case" scenarios for waterhammer and two-phase flow, taking into consideration the complete range of event possibilities, system configurations, and parameters. For example, all temperatures, pressures, flow rates, load combinations, and potential component failures should be considered. Additional two-phase flow considerations include:
the effects of void fraction on flow balance and heat transfer; the consequences of steam formation, transport, and accumulation; cavitation, resonance, and fatigue effects; and erosion considerations.
Enclosure 3
it is important for licensees to realize that in addition to heat transfer considerations, two-phase flow also involves structural and system integrity concems that must be addressed. Licensees may find NUREG/CR-6031, " Cavitation Guide for Control Valves," helpful in addressing some l
aspects of the two-phase flow analyses.
l 5. Describe and justify all assumptions and input parameters (including those used in any computer codes) that were used in the waterhammer and two-phase flow analyses.
Confirm that these assumptions and input parameters are conservative and are consistent with the existing design and licensing basis of the plant. Any exceptions should be explained and justified.
- 6. Confirm that the waterhammer and two-phase flow analyses included a complete failure modes and effects analysis (FMEA) for all components (including electrical and pneumatic failures) that could impact performance of the cooling water system and confirm that the FMEA is documented and available for review, or explain why a l cornplete and fully documented FMEA was not performed.
i
- 7. Determine the uncertainty in the waterhammer and two-phase flow analyses that have been completed, explain how the uncertainty was determined, and how it was accounted for in the analyses to assure conservative results.
- 8. Provide a complete description of any limitations and non-conservatism that exist in the fan cooler model that was developed, including use of the GOTHIC computer code in this particular application. Explain how the fan cooler model and use of the GOTHIC code were validated such that conservative results are assured.
l g. Depending on the context,1% voiding can be a substantial amount. Clarify what was meant by the characterization that was made (e.g., <1% mass fraction of vapor in the fluid stream; <1% vapor formed when compared to the total fluid mass of the system).
l Explain why this amount of voiding does not constitute a waterhammer or two-phase i flow concem.
- 10. Discuss specific system operating parameters and other operating restrictions that must be maintained to assure that the waterhammer and two-phase flow analyses remain valid (e.g., pressures, temperatures, surge tank level, system alignment), and explain why it would not be appropriate to establish technical specification requirements to acknowledge the importance of these parameters and operating restrictions. Also, describe and justify use of any non-safety related instrumentation and controls in maintaining these parameters and operating restrictions.
- 11. Implementing measures to assare that waterhammer and two-phase flow will not occur, such as maintaining system alignment requirements and surge tank parameters, is an acceptable approach for addressing these concems. However, all scenarios must be considered so assure that the vulnerability to waterhammer and two-phase flow has been eliminated. Confirm that all scenarios have been considered, including those where the affected containment penetrations are not
- isolated (if this is a possibility), such that the measures that have been established j are adequate to prevent the occurrence of waterhammer and two-phase flow during (and following) all applicable accident scenarios.
l
r
- 12. Explain and justify all uses of " engineering judgement" that were credited.
)
)
l 13. Provide a simplified diagram of the system, showing major components, active components, relative elevations, lengths of piping runs, and the location of any orifices and flow restrictions.
I
- 14. Describe in detail any plant modifications or procedure changes that have been I made or are planned to be made to resolve the waterhammer and two-phase flow issues.
l l 1 l
l l
l l
!