Notice of Violation from Insp on 870511-0703.Violation Noted:Failure to Maintain Cold Position of Spring Hanger After Balancing of Piping Sys by Not Assuring That Line Filled W/Water Prior to Verifying Cold Load Position
ML20234E226
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/17/1987
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20234E221 List:
References
50-498-87-40, 50-499-87-40, NUDOCS 8709220317
Download: ML20234E226 (1)


Text

Q n 1

i APPENDIX A NOTICE OF VIOLATION Houston Lighting and Power Dockets: 50-498 i South Texas Project, Units 1 & 2 50-499 Permits: CPPR-128 CPPR-129 i

During an NRC inspection conducted May 11 through July 3, 1987, one violation i of NRC requirements was identified. The violation involved a failure to follow procedures. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the violation is listed below:

Failure to Follow Procedure for Adjusting Spring Hangers Criterion V of Appendix 8 to 10 CFR 50 requires that activities affecting quality be prescribed by and accomplished in accordance with appropriate  ;

instructions, procedures, or drawings. This requirement is amplified by the  !

approved Quality Assurance Program Description (QAPD) of South Texas Project (STP). .

1 Standard Site Procedure (SSP) 9, Revision 4, paragraph 5.6.6.5, requires that the actual cold load position of spring hangers be maintained after  !

balancing a piping system in accordance with the arocedure as outlined in Appendix 2 of Specification SL340JS1002 and Attac1 ment SSP 9-42.

t j

Contrary to the above, the cold position the construction of a spring support group)after hanger (RC-1212-HL-5001 failed to maintain balancing of 1 the piping system by not assuring the line was filled with water prior to .

verifying the cold load position. i This is a Severity Level IV violation. (SupplementII)(498/8740-01)

Pursuant to the provisions of 10 CFR 2.201, Houston Lighting & Power Company is  ;

hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved, (3)'the corrective steps which will be taken to avoid further violations, and (4) the date.when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas, this fr/d day of 4j&ulet,1987 8709220317 870917' PDR ADOCK 05000498 G PDR