Notice of Violation from Insp on 890101-31.Violation Noted: Rev 0 to Procedure OTEP03-ZA-0039 Failed to Include Provisions for Independent Verification That Control Room Envelope Makeup Fan Air Inlets Restored to Normal
ML20245E876
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/25/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20245E859 List:
References
50-499-89-02, 50-499-89-2, NUDOCS 8905020171
Download: ML20245E876 (1)


Text

p -

4 APPENDIX A

, NOTICE OF VIOLATION p Houston Lighting .&-Power Company Docket: 50-499 iSouthTexasProject(STP), Unit 2- Operating License: NPF-78 During an NRC inspection conducted January 1-31, 1989, a violation of NRC i

requirements was identified. The violation involved the failure to accomplish i an activity affecting quality in accordance with documented procedures. In-

accordance with the 10 Enforcement Actions," " General CFR PartStatement 2, AppendixofCPolicy (and Procedure for NRC1989),thevio
below:

,10 CFR Part 50, Appendix B, Criterion:Y, requires that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings. ,

~

a South Texas Project Station Procedure OPGP03-ZA-0039, Revision 8, " Plant Procedures Writer's Guide," Section 3.2.20, " Independent Verification," -t requires, in part, that alignment changes or_ alterations in_ status of components / systems identified as safety-related be independently verified-when a' component / system is returned to service following_a period when the component / system was inoperable due to maintenance or testing or when a component / system is removed from service or altered from its normal configuration, n ,

Contrary to the' above, Station Procedure OTEP03-FP-0006, Revision 0, ,

" Relay Room Halon Concentration Test," did not include provisions for independent' verification that the control room envelope makeup fan air inlets had beenr.estored to normal configuration after testing. This oversight ' led to the plastic sheeting being left on the Train C control room envelope makeup fan inlet thereby rendering that train inoperable.

This is a Severity Level IV violation. (Supplements)(499/8902-01)

~

Pursuant to the provisions of 10 CFR 2.201, Houston Lighting & Power Com)any is hereby required to submit to this office within 30 days of the date of tie letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violation if admitted, 2)_.the corrective steps which have been taken and the results achieved,

3) the corrective steps which will be taken to avoid further violations, and 4).the date when full compliance will be achieved.

Dated at Arlington, Texas,

.this p g g day of 1989 8905020171 690425 hDR ADOCK 05000493 PDC