1 Y
t APPENDIX A NOTICE OF VIOLATION Houston' Lighting & Power Company Dockets: 50-498 South Texas Project (STP), Unit 1 Operating License: NPF-76 During an.NPC inspection conducted February 1-28, 1989, a violation of NRC requirements was identified. The violation-involved operating without taking y
i hour grab samples while the Gaseous Waste Processing System Oxygen Analyzer In accordance with the " General Statement of Polic Procedure for NRC Enforcement Actions," 10 CFR Part 2 Appendix C (y and1988),the
- was inoperable.
violation is listed below:
TS Surveillance Requirement 3.3.3.11 states in part that with the Gaseous j
Waste Processing Monitoring System Oxygen Monitor inoperable, operations i
~
may continue provided grab samples are collected at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and analyzed within the following 4' hours.
. Contrary to the above, on February 8,1989, the licensee discovered that l
the monthly. Analog Channel Operational Surveillance Test for the Gaseous Waste Processing System Oxygen Analyzer had not been performed and that operations had continued without taking grab samples of the Gaseous Waste Processing System for the period of February 5-8, 1989.
i This is a' Severity Level IV violation..(Supplement I) (498/8904-01)
I Houston Lighting & Power Company's response to this violation will be reviewed as part of the review regarding LER 89-007.
No additional written response is.
required for this violation.-
l Dated at Arlington, Texas, I
this / f W ay of 1989 l