Notice of Violation from Insp on 930926-1106.Violation Noted:Contractor Technician Notified Licensee Personnel That Freeze Plug Had Been Established & Progress Record Sequence 85 of Work Package 308833-EP01 Was Signed Off
ML20058F231
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/02/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20058F195 List:
References
50-498-93-36, 50-499-93-36, NUDOCS 9312080038
Download: ML20058F231 (2)


Text

,

. ~

j w

APPENDIX A j

NOTICE OF VIOLATION i

Houston Lighting & Power Company Docket Nos. 50-498 i

South Texas Project, Units 1 and 2 50-499 License Nos. NPF-76

.J NPF-80 During an NRC inspection conducted September 26 through November 6, 1993, one h

violation of NRC requirements was identified.

In accordance with the " General i

Statement of Policy and Procedure for NRC Enforcement-Actions," 10 CFR Part 2, j

~

Appendix C, the violation is listed below:

Technical Specification 6.8.1.a states, in part, that written i

procedures shall be established, implemented, and maintained including the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.

Item 9.a of f

Appendix A states, in part, " Maintenance that can affect the performance of safety-related equipment should be properly preplanned and performed in accordance with written procedures, documented instructions, or drawings appropriate to the j

circumstances."

This requirement was implemented, in part, by Procedure MNP-1004, j

" Freeze Stop Procedure," Revision 1.

Step 4.10.9 states, "Upon i

reaching the freeze stop temperature outside the jacket at the i

thermo-couple record the time, inspect the jacket, notify the i

customer freeze stop plug and release pipe for work to be done by customer."

Contrary to the above, at or about 5:05 a.m. on October 13, 1993, i

the contractor technician notified licensee personnel that a i

freeze plug had been established, and Progress Record Sequence 85 l

of Work Package 308833-EP01 was signed off, thereby releasing the pipe for work, without achieving the freeze stop temperature outside the jacket. Testing later verified that the freeze plug

{

had not been established.

I This is a Severity Level IV violation.

(Supplement I)

(499/93036-2) l Pursuant to the provisions of 10 CFR 2.201, Houston Lighting & Power Company-is hereby required to submit a written statement or explanation to the U.S.

l Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.

20555 with a copy to the Regional Administrator, Region IV, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, j

within 30 days of the date of the letter transmitting this Notice of Violation-(Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:

(1) the reason for the j

violation, or if contested, the basis for disputing the violation, (2) the corrective steps which have been taken and results achieved, (3) the 93120B0038 931202

?

PDR ADOCK 05000498 PDR O

I

h

. l corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in_this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause j

is shown, consideration will be given to extending the response time.