Forwards Insp Repts 50-498/87-40 & 50-499/87-40 on 870511-0703 & Notice of Violation
ML20234E218
Person / Time
Site: South Texas  
Issue date: 09/17/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20234E221 List:
References
NUDOCS 8709220315
Download: ML20234E218 (2)


See also: IR 05000498/1987040

Text

4

l

SEP 171987

I

In' Reply Refer To:

Dockets:

50-498/87-40

50-499/87-40

Houston Lighting & Power Company

ATTN:

J. H. Goldberg

Group Vice President, Nuclear

P. O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. C. E. Johnson and

D. L. Garrison of this office during the period May 11 through July 3,1987, of

activities authorized by NRC Construction Permits CPPR-128 and CPPR-129 for the

South Texas Project, Units 1 and 2, and to the discussion of our findings with

J. T. Westermeier and other members of your staff at the conclusion of the

.

inspection.

Areas examined during the inspection included site tours, licensee action on

previously reported items, licensee action on IE Notices, followup on

10 CFR Part 21 reports, pipe supports and restraints, and followup on allegations.

Within these areas, the inspection consisted of selective examination of

representative records, interviews with personnel, and observations by the NRC

inspectors. The inspection findings are documented in the enclosed inspection

,

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

i

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

DLGar [rison

PI g

C: PB/

ACtf

C:

RIV:SR

RPB/C

CEJohn o

1r

RGTaylor

GL

stable

MEmerson

EGag iardo

/,c/87

r /n,/87

e/r;/87

s / 9 /87

fn+w/87

9 / 3 87

f

8709220315 870917

PDR

ADDCK 05000498

G

PDR

"li

///

.

,

-_

_ _ _ _ _ - - _

_

_ _

__

1

.E

,

Houston Lighting & Power Company

-2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

% m ns cerned to

s..

r_ > q. t.,

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-498/87-40

50-499/87-40

cc w/ enclosures:

Houston Lighting & Power Company

ATTN:

M. Wisenberg, Manager,

Nuclear Licensing

P. O. Box 1700

Houston, Texas 77601

Houston Lighting & Power Company

ATTN:

G. E. Vaughn, Vice President,

Nuclear Operations

P. 0. Box 1700

Houston, Texas 77001

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib, by RIV:

  • RPB

DRSP

  • RRI-0PS

R. D. Martin, RA

  • RRI-t0NST.
  • SectionChief(RPB/C)
  • RPSB
  • MIS System
  • RIV File
  • D. Weiss, RM/ALF
  • RSTS Operator

R. Pirfo, ELD

  • R. G. Taylor, RPB/C
  • RSB
  • Project Inspector, RPB
  • R. Hall
  • P.

Kadambi, NRR

M. Emerson

  • w/766