ML20203D561 | 10 February 1999 | Notice of Violation from Insp on 980614-1123.Violation Noted:From 980614-0615,period Greater than 8 Hours,Unit 1 Channel III 125-volt Battery Bank E1B11 Inoperable with Reactor in Mode 1 & Reactor Not Placed in Hot Standby | |
ML20196G917 | 2 December 1998 | Notice of Violation from Insp on 981102-05.Violation Noted:Licensee Did Not Make Surveys to Ensure Compliance with 10CFR20.1902,requiring Posting of Each Radiation Area with Conspicuous Sign or Signs Bearing Radiation Symbol | |
ML20195F292 | 12 November 1998 | Notice of Violation from Insp on 980906-1017.Violation Noted:On 980922,Work Order BS-354091 Contained Maint Instructions That Were Inappropriate to Circumstances | |
ML20236M301 | 8 July 1998 | Notice of Violation from Insp on 980503-0613.Violation Noted:Fire Brigade Training Drill Did Not Assess Each Member'S Knowledge of Role in Fire Fighting Strategy for Area Assumed to Contain Fire | |
ML20247M475 | 18 May 1998 | Notice of Violation from Insp on 980322-0502.Violation Noted:Combustible Matl,Specifically,Wood Scaffold Installed & Remained in safety-related 2A Isolation Valve Cubicle from Feb 1997 Until April 1998,unattended & W/O Evaluation | Fire Protection Program |
ML20217A845 | 20 April 1998 | Notice of Violation from Insp on 980214-0321.Violation Noted:Licensee Updated UFSAR to Reflect New LOCA Radiological Analysis,Which Increased Thyroid Dose to CR Operator,W/O Obtaining Prior NRC Review & Approval | |
ML20217B558 | 24 March 1998 | Notice of Violation from Insp on 980104-0214.Violation Noted:Fire Hose Stations Listed in Addendum 3 of Procedure OPGP03-ZF-0018 Not Operable When Equipment in Area to Be Protected Required to Be Operable by TS | Fire Protection Program |
ML20202D770 | 12 February 1998 | Notice of Violation from Insp on 980112-15.Violation Noted: Radiation Workers Who Were Likely to Receive Occupational Dose in Excess of 100 Mrems Per Yr Were Not Informed of Presence of Airborne Radioactivity | |
ML20197F346 | 22 December 1997 | Notice of Violation from Insp on 971112.Violations Noted: Programmatic Calculation Deficiencies,First Identified in Observation 92-01-13 Not Promptly Corrected | |
IR 07100020/2012005 | 18 December 1997 | Notice of Violation from Insp on 971020-1205.Violation Noted:From 941031-970812,licensee Had Implemented Exemption from Biennial Written & Annual Operating Tests Required of Licensed Operators for 2 Individuals Assigned to Exam Team | |
ML20198F016 | 8 December 1997 | Notice of Violation from Insp on 970810-1004.Violation Noted:On 970820,written Procedures Were Not Maintained Covering Operational Valve Alignment of Chemical & Vol CS in That Operators Had Utilized Equipment Clearance Order Tag | |
ML20202B501 | 28 November 1997 | Partially Withheld NOV from Insp on 971103-07 (Ref 10CFR73.21).Violations Noted:One Zone Would Not Detect Individual Crawling Under Detection Beam | |
ML20216E766 | 9 September 1997 | Notice of Violation from Insp on 970629-0809.Violation Noted:On 970624,Equipment Clearance Order 97-2-76518 Failed to Provide Adequate Personnel & Equipment Safety in That Ecw Screen Wash Booster Pump 2A Started While Sys Was Drained | |
ML20210R449 | 27 August 1997 | Notice of Violation from Insp on 970721-24.Violation Noted: W Purchase Order E 52891 & Encl Matl Spec A533C07, SA-533 Type B Class 2 Plate, Were Approved by Ltr ST-W2-HS-000040, W/O Concurrent Rev | |
ML20140D501 | 5 June 1997 | Notice of Violation from Insp on 970406-0517.Violation Noted:From Jan 1996 to Apr 1997,operator Did Not Complete Continuous Requalification Training Program | |
ML20140A889 | 3 June 1997 | Notice of Violation from Insp on 970505-09.Violation Noted: Licensee Identified That Access to Isolation Valve Cubicle, Vital Area Was Not Controlled by Security Sys or by an Armed Security Officer | Fitness for Duty |
ML20140F951 | 28 April 1997 | Notice of Violation from Insp on 970223-0405.Violation Noted:Licensee Failed to Verify Operability of ECCS Sump When Visual Insp of Areas Affected by Containment Entry Was Conducted IAW Procedure OPSP03-XC-0002 | |
ML20137F463 | 27 March 1997 | Notice of Violation from Insp Completed on 961206.Violation Noted:From 960222-1003,excessive Leakage from ECCS Valve, Existed & Not Promptly Identified & Corrected | Condition Adverse to Quality |
ML20137G038 | 21 March 1997 | Notice of Violation from Insp on 970112-0222.Violation Noted:Reactor Coolant Sys Level Sight Glass Was Not in Svc During Reduced Reactor Coolant Sys Inventory Operations | |
ML20137D595 | 20 March 1997 | Notice of Violation from Insp on 970217-21.Violation Noted:Contamination Surveys Were Not Performed to Determine Concentration or Quantities of Radioactive Matl Inside Primary Side of SG Prior to Start of Work | |
ML20129F905 | 2 October 1996 | Notice of Violation from Insp on 960728-0907.Violation Noted:Licensee Failed to Establish Written Procedures Covering Surveillance Tests & Calibr of Axial Flux Difference Monitor Alarm Device Following Sys Maint | |
ML20149L456 | 20 February 1996 | Notice of Violation from Insp on 960108-22.Violation Noted: on 951223,during Conduct of Surveillance on Solid State Protection Sys,Crew Failed to Declare Surveillance Test Unsatisfactory After Observing SIS Valve MOV-0016B Not Open | |
ML20059H054 | 20 January 1994 | Notice of Violation from Insp on 931213-17.Violation Noted: Failure to Follow Requirements of Work Process Program Procedure Were Identified | |
ML20058F231 | 2 December 1993 | Notice of Violation from Insp on 930926-1106.Violation Noted:Contractor Technician Notified Licensee Personnel That Freeze Plug Had Been Established & Progress Record Sequence 85 of Work Package 308833-EP01 Was Signed Off | |
ML20059C820 | 27 October 1993 | Notice of Violation from Insp on Stated Date.Violation Noted:Maintenance Personnel Installed Replacement Reverse Power Relay W/O Ecnp/Mod Package Issued Authorizing Use | |
ML20056F398 | 24 August 1993 | Notice of Violation from Insp on 930802-06.Violation Noted: Large Number of Personnel Requalified by Acting as Evaluator or Controller in Emergency Drill or Exercise Without Having to Successfully Demonstrate Position Duties | |
ML20056C975 | 23 July 1993 | Notice of Violation from Insp on 930628-0702.Violation Noted:On 930613,oncoming Unit 2 Operations Shift Failed to Conduct Adequate Review of Current Plant Condition & Was Not Aware That CCW Isolated from Spent Fuel Pool HX | |
ML20128M083 | 11 February 1993 | Notice of Violation from Insp on 930111-15.Violation Noted:Licensee Technical Advisory Council Failed to Review & Approve Current Biennial Training Plan | |
ML20127D495 | 10 September 1992 | Notice of Violation from Insp on 920705-0801.Violation Noted:Procedure 2P0P02-HE-0001 Determined to Be Inappropriate to Circumstances | |
ML20058D387 | 1 November 1990 | Notice of Violation from Insp on 900912-21.Violation Noted: on 900912,Unit 1 Entered Mode 3 W/One ECCS Subsystem Inoperable & Subsystem Not Restored to Operable Status Until Temp of RCS Cold Legs Reached 385 F | |
ML20059K937 | 18 September 1990 | Notice of Violation from Insp on 900730-0808.Violation Noted:On 900726,Steps 5.13.1 & 5.13.2 of Plant Procedure IPSP03-AF-0001,Rev 6, Auxiliary Feedwater Pump 11 Inservice Test, Performed Concurrently & Not Completely Independent | |
ML20056B399 | 20 August 1990 | Notice of Violation from Insp on 900604-08.Violations Noted: Licensee Designated Vehicles (Ldv) Left Outside Overnight & During First Quarter of CY90,two Ldvs Left in Protected Areas W/Keys in Ignition | Safeguards Contingency Plan |
ML20248C703 | 28 September 1989 | Notice of Violation from Insp on 890814-18.Violation Noted: Manual Valves 1-XWL-0392 & 1-XWL-0349 Not Closed Per Steps 4.3.6.1 & 4.3.6.4.b of Procedure 1PCP13-WL-0007, Waste Evaporator Operations | Grab sample |
ML20247H537 | 12 September 1989 | Notice of Violation from Insp on 890821-25.Violations Noted: in-process Monitoring of Welding Parameters Not Being Conducted & Three Holding Ovens Contained Covered Electrodes or More than One Heat Code of Same Size | |
ML20245L562 | 15 August 1989 | Notice of Violation from Insp on 890601-30.Violation Noted: Util Fire Watchman Assigned to Fire Protection Sys Compensatory Hourly Fire Watches Falsified Fire Watch Log Entries | Fire Watch |
ML20245J528 | 10 August 1989 | Notice of Violation from Insp on 890607-30.Violation Noted: Procedure 0P0P04-RP-0001 Did Not Provide Adequate Guidance Re Expected Failure of Reactor Protection Pressure Channel During Low Temp Low Pressure Operations | |
ML20245F212 | 22 June 1989 | Notice of Violation from Insp on 890605-09.Violation Noted: Purchase Order Ordered nonsafety-related Westinghouse Selector Switches Rather than safety-related Selector Switches | |
ML20244C373 | 7 June 1989 | Notice of Violation from Insp on 890401-02.Violations Noted: Equipment Qualification File for Wyle Labs Assessment Rept on Limitorque Operators for Eight Auxiliary Feedwater Valves W/Space Heaters Installed,Did Not Support Qualification | |
ML20246Q027 | 9 May 1989 | Notice of Violation from Insp on 890301-31.Violation Noted: During Tour of Unit 2 Fuel Handling Bldg,Visitor Found W/O Badge Attached to Front of Body Between Shoulder & Waist | |
ML20245J536 | 1 May 1989 | Notice of Violation from Insp on 890313-17.Violations Noted: Combustible Matls Found Stored Outside of Storage Locker in Room 301 on 890315 & Temporary Scaffolding Erected in Pump Bays W/O Insp & Evaluation by Project Engineering | Temporary Modification Scaffolding |
ML20245E876 | 25 April 1989 | Notice of Violation from Insp on 890101-31.Violation Noted: Rev 0 to Procedure OTEP03-ZA-0039 Failed to Include Provisions for Independent Verification That Control Room Envelope Makeup Fan Air Inlets Restored to Normal | |
ML20245C574 | 19 April 1989 | Notice of Violation from Insp on 890201-28.Violation Noted: Monthly Analog Channel Operational Surveillance Test for Gaseous Waste Processing Sys Oxygen Analyzer Not Performed | Grab sample |
ML20236B999 | 17 March 1989 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50.000.Noncompliance Noted:Adequate Measures Not Established to Assure Plant Design Basis Correctly Translated Into Specs,Drawings & Procedures | |
ML20196E365 | 5 December 1988 | Notice of Violation from NRC Investigation Rept on 880129-0415.Violations Noted:Plant Fire Watch Supervisor & Fire Watch Personnel Assigned Fire Protection Sys Compensatory Hourly Watches Initialed Fire Watch Logs | Fire Watch Hourly Fire Watch |
ML20206G512 | 15 November 1988 | Notice of Violation from Insp on 880711-15,25-29 & 0808-12. Violations Noted:Adequate Procedures Not in Place to Assure Important Activities Satisfactorily Accomplished | |
ML20245D732 | 28 September 1988 | Notice of Violation from Insp on 880822-26.Violations Noted: Procedures Failed to Provide Sufficient Guidance Re Supplementary Actions Necessary to Ensure All Required Channels Placed in Trip Condition | |
ML20154N885 | 21 September 1988 | Notice of Violation from Insps on 880211-0331 & 0405-0502. Violations Noted:Licensee Discovered 7 Out of 12 Feedwater Flow Transmitters Valved Out of Svc Since 870430 | |
ML20153E614 | 31 August 1988 | Notice of Violation from Insp on 880701-31.Violations Noted: Failure to Perform Surveillances in Accordance W/Tech Specs & Failure to Maintain Nitrogen Gas Pressure on Electrical Penetrations in Unit 2 After Equipment Turnover | |
ML20151V561 | 12 August 1988 | Notice of Violation from Insp on 880601-30.Violation Noted: No Monthly Test Performed for motor-operated Valve FV-4548 Until After 880518 & on 880607,unplanned Release of Approx 1,500 Gallons of Radwaste Occurred | Stroke time Power Operated Valves |
ML20151R040 | 20 July 1988 | Notice of Violation from Insp on 880627-0701.Violation Noted:Ncr SS-05553 Improperly Closed Out in That Ultrasonic Thickness Measurements,Made After Qc,Showed Different Actual Wall Thickness |