Notice of Violation from Insp on 930111-15.Violation Noted:Licensee Technical Advisory Council Failed to Review & Approve Current Biennial Training Plan
ML20128M083
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/11/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20128M049 List:
References
50-498-93-01, 50-498-93-1, 50-499-93-01, 50-499-93-1, NUDOCS 9302220083
Download: ML20128M083 (1)


Text

i.

APPENDIX A NOTICE OF VIOLATION Houston Lighting & Power Company Dockets:

50-498 South Texas Project, Units 1 and 2 50-499 Licenses:

NPF-76 NPF-80 During an NRC inspection conducted on January 11-15, 1993, a violation of NRC requirements <<as identified.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR 2, Appendix C, the violation is listed below:

Failure to Follow An Approved Procedure Appendix B to 10 CFR 50, Criterion V requires, in part, that activities af fecting quality shall be established and implemented in accordance with procedures appropriate to the circumstances and shall be accomplished in accordance with these procedures.

Nuclear Training Department Procedure NTP-230, Revision 2, provides guidance for implementing the nuclear training program.

Sections 6.3.5.3 and 6.3.5.4 of NTP-230 require the Technical Advisory Council to review and approve a biennial training plan in accordance with specified criteria.

Contrary to the above, the licensee's Technical Advisory Council failed to review and approve the current biennial training plan.

This is a Severity Level IV violation (Supplement 1)(498/9301-01; 499/9301-01).

Pursuant to the provisions of 10 CFR 2.201, Houston Lighting & Power Company is hereby required to submit a written statement or explanation to the -

U.S. Nuclear Reaulatory Commission, ATTN:

Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region IV, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Natice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the ress.ts achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not receivad within the time specified in this Notice, an order or demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the respcnse time.

Dated at Arlingt Texas this//6f day of-1993 9302220003 930211 PDR ADOCK 05000498

-G PDR

_