Category:INSPECTION REPORT
MONTHYEARIR 05000293/19990051999-10-0808 October 1999 Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20209G2331999-07-0909 July 1999 Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good IR 05000293/19990021999-05-17017 May 1999 Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000293/19990011999-04-20020 April 1999 Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 IR 05000293/19980101998-12-22022 December 1998 Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program IR 05000293/19980081998-12-0101 December 1998 Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19982031998-11-24024 November 1998 Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of Configuration IR 05000293/19980071998-10-0707 October 1998 Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19980061998-08-28028 August 1998 Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19980091998-08-20020 August 1998 Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous Insps IR 05000293/19980051998-07-0909 July 1998 Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified ML20217P7801998-04-0303 April 1998 Insp Rept 50-293/98-03 on 980302-05 & 11-12.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Security Force Capability IR 05000293/19980011998-03-24024 March 1998 Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19970131998-02-0606 February 1998 Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19970121997-12-17017 December 1997 Insp Rept 50-293/97-12 on 971006-10 & 1119.Violations Noted. Major Areas Inspected:Eq Documents for EQ Equipment That Required Requalification Due to Containment Environ Changes Resulting from CS Flow Rate Reduction in 1988 IR 05000293/19970111997-12-11011 December 1997 Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970101997-11-26026 November 1997 Insp Rept 50-293/97-10 on 971104-07.No Violations Noted. Major Areas Inspected:Emergency Response Organization, Simulated Events,Mitigation Actions Emergency Declarations & off-site Agencies IR 05000293/19970081997-10-24024 October 1997 Insp Rept 50-293/97-08 on 970805-0913.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20198L9231997-10-21021 October 1997 Insp Rept 50-293/97-05 on 970514-0828.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Engineering IR 05000293/19970071997-09-15015 September 1997 Insp Rept 50-293/97-07 on 970625-0816.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970801997-09-12012 September 1997 Insp Rept 50-293/97-80 on 970721-0801.Violations Noted.Major Areas Inspected:Effectiveness of Processes for Identifying Resolving & Preventing Issues That Degrade Quality of Plant Operations & Safety ML20216G8181997-09-0404 September 1997 Insp Rept 50-293/97-09 on 970827-28.No Violations Noted. Major Areas Inspected:Licensee Access Authorization Program IR 05000293/19970041997-08-0707 August 1997 Insp Rept 50-293/97-04 on 970505-23.No Violations Noted. Major Areas Inspected:Effectiveness of Licensees Efforts in Maintaining Design Basis of safety-related Sys ML20149K0431997-07-22022 July 1997 Insp Rept 50-293/97-03 on 970429-0624.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20141K7861997-05-22022 May 1997 Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137E5671997-03-18018 March 1997 Insp Rept 50-293/97-01 on 970112-0302.Violations Noted.Major Areas Inspected:Operations,Engineering & Plant Support ML20134K5951997-02-0707 February 1997 Insp Rept 50-293/96-10 on 961123-970111.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19960081996-12-18018 December 1996 Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides Encl IR 05000293/19960061996-10-30030 October 1996 Insp Rept 50-293/96-06 on 960729-0923.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129A0441996-10-11011 October 1996 Insp Rept 50-293/96-09 on 960916-20.Violations Noted. Major Areas Inspected:Miscellaneous Security & Safeguard Issues,Access Authorization Program & Administration Organization & Background Investigation Elements ML20129D8361996-09-20020 September 1996 Insp Rept 50-293/96-07 on 960708-12,0722-26 & 0828-0903. Non Cited Violation Noted.Major Areas Inspected:C/As After Licensee Had Identified Potentially Inoperable Primary Containment as Documented in LER 96-04 IR 05000293/19930201994-01-10010 January 1994 Insp Rept 50-293/93-20 on Stated Date.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Surveillance, Engineering & Plant Support IR 05000293/19930801993-12-21021 December 1993 Insp Rept 50-293/93-80 on 931018-23.No Violations Noted. Major Areas Inspected:Station Blackout Coping Sys,Onsite Ac Supplies & Reliability Program,Plant Mods & QA & Maint Practices for Station Blackout Equipment IR 05000293/19930191993-11-23023 November 1993 Insp Rept 50-293/93-19 on 930928-1101.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering,Plant Support,W/Regard to Security & NRC Info Notice 93-079 ML20058D4771993-11-19019 November 1993 Insp Rept 50-293/93-16 on 930830-1015.Violations Noted.Major Areas Inspected:Audits & Surveillances,Training & Qualifications,Radiological Problem Repts & Associated C/A IR 05000293/19930151993-10-15015 October 1993 Insp Rept 50-293/93-15 on 930817-0927.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls Maint & Surveillance,Emergency Preparedness,Security,Safety Assessment & Quality Verification IR 05000293/19930171993-09-24024 September 1993 Insp Rept 50-293/93-17 on 930830-0903.No Violations Noted. Major Areas Inspected:Mgt Controls,Qa Audits & ODCM IR 05000293/19930141993-09-0808 September 1993 Insp Rept 50-293/93-14 on 930713-0816.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support IR 05000293/19930111993-08-0404 August 1993 Insp Rept 50-293/93-11 on 930606-11.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions of Previously Identified Electrical Distribution Sys Functional Insp Findings & Observations IR 05000293/19930011993-02-0303 February 1993 Insp Rept 50-293/93-01 on 930111-14.Weaknesses Noted.Major Areas Inspected:Eop Review,Rev,Approval Process,Qa Involvement in EOP Program & Operator Training in EOPs IR 05000293/19920811993-02-0202 February 1993 Probabilistic Risk Assessment Based Insp Rept 50-293/92-81 on 921130-1218.Violation Noted.Major Areas Inspected:Review of Emergency Diesel Generators & Hpcis.App a Encl IR 05000293/19920281993-01-28028 January 1993 Insp Rept 50-293/92-28 on 921124-1231.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security,Safety Assessment & Quality Verification IR 05000293/19920261993-01-21021 January 1993 Insp Rept 50-293/92-26 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Ep Program Changes, Emergency Response Facilities,Equipment,Instrumentation, Supplies & Organization & Mgt Control IR 05000293/19920231992-12-29029 December 1992 Safety Insp Rept 50-293/92-23 on 921020-1123.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security & Safety Assessment & Quality Verification IR 05000293/19920241992-11-23023 November 1992 Insp Rept 50-293/92-24 on Stated Date.No Safety Concerns or Violations Noted.Major Areas Inspected:Audits & Surveillances,Collective Personnel Exposure Status,Outage Radiological Controls & Implementation of Exposure Programs IR 05000293/19900201990-11-0707 November 1990 Safety Insp Rept 50-293/90-20 on 900816-1008.Violation Noted.Major Areas Inspected:Plant Operations,Security, Maint & Surveillance,Engineering & Technical Support, Radiological Controls,Emergency Preparedness & Safety IR 05000293/19900211990-10-11011 October 1990 Insp Rept 50-293/90-21 on 900905-07.Major Areas Inspected: 900902-03 Event Involving Number of Component Malfunctions & Operational Complications Following Shutdown.Operating Procedures Lacked Adequate Guidance for Operators IR 05000293/19900091990-08-20020 August 1990 Insp Rept 50-293/90-09 on 900806-10.No Violations or Deviations Noted.Major Areas Inspected:Control of Design, Design Changes,Mods,Engineering & Technical Support Organization,Staffing,Communications,Qa & Training IR 05000293/19900161990-07-30030 July 1990 Partially Withheld Physical Security Insp Rept 50-293/90-16 on 900625-29 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support & Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids 1999-08-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000293/19990051999-10-0808 October 1999 Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20209G2331999-07-0909 July 1999 Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good IR 05000293/19990021999-05-17017 May 1999 Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000293/19990011999-04-20020 April 1999 Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 IR 05000293/19980101998-12-22022 December 1998 Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program IR 05000293/19980081998-12-0101 December 1998 Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19982031998-11-24024 November 1998 Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of Configuration IR 05000293/19980071998-10-0707 October 1998 Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19980061998-08-28028 August 1998 Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19980091998-08-20020 August 1998 Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous Insps IR 05000293/19980051998-07-0909 July 1998 Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified ML20217P7801998-04-0303 April 1998 Insp Rept 50-293/98-03 on 980302-05 & 11-12.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Security Force Capability IR 05000293/19980011998-03-24024 March 1998 Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19970131998-02-0606 February 1998 Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19970121997-12-17017 December 1997 Insp Rept 50-293/97-12 on 971006-10 & 1119.Violations Noted. Major Areas Inspected:Eq Documents for EQ Equipment That Required Requalification Due to Containment Environ Changes Resulting from CS Flow Rate Reduction in 1988 IR 05000293/19970111997-12-11011 December 1997 Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970101997-11-26026 November 1997 Insp Rept 50-293/97-10 on 971104-07.No Violations Noted. Major Areas Inspected:Emergency Response Organization, Simulated Events,Mitigation Actions Emergency Declarations & off-site Agencies IR 05000293/19970081997-10-24024 October 1997 Insp Rept 50-293/97-08 on 970805-0913.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20198L9231997-10-21021 October 1997 Insp Rept 50-293/97-05 on 970514-0828.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Engineering IR 05000293/19970071997-09-15015 September 1997 Insp Rept 50-293/97-07 on 970625-0816.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970801997-09-12012 September 1997 Insp Rept 50-293/97-80 on 970721-0801.Violations Noted.Major Areas Inspected:Effectiveness of Processes for Identifying Resolving & Preventing Issues That Degrade Quality of Plant Operations & Safety ML20216G8181997-09-0404 September 1997 Insp Rept 50-293/97-09 on 970827-28.No Violations Noted. Major Areas Inspected:Licensee Access Authorization Program IR 05000293/19970041997-08-0707 August 1997 Insp Rept 50-293/97-04 on 970505-23.No Violations Noted. Major Areas Inspected:Effectiveness of Licensees Efforts in Maintaining Design Basis of safety-related Sys ML20149K0431997-07-22022 July 1997 Insp Rept 50-293/97-03 on 970429-0624.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20141K7861997-05-22022 May 1997 Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137E5671997-03-18018 March 1997 Insp Rept 50-293/97-01 on 970112-0302.Violations Noted.Major Areas Inspected:Operations,Engineering & Plant Support ML20134K5951997-02-0707 February 1997 Insp Rept 50-293/96-10 on 961123-970111.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19960081996-12-18018 December 1996 Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides Encl IR 05000293/19960061996-10-30030 October 1996 Insp Rept 50-293/96-06 on 960729-0923.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129A0441996-10-11011 October 1996 Insp Rept 50-293/96-09 on 960916-20.Violations Noted. Major Areas Inspected:Miscellaneous Security & Safeguard Issues,Access Authorization Program & Administration Organization & Background Investigation Elements ML20129D8361996-09-20020 September 1996 Insp Rept 50-293/96-07 on 960708-12,0722-26 & 0828-0903. Non Cited Violation Noted.Major Areas Inspected:C/As After Licensee Had Identified Potentially Inoperable Primary Containment as Documented in LER 96-04 IR 05000293/19930201994-01-10010 January 1994 Insp Rept 50-293/93-20 on Stated Date.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Surveillance, Engineering & Plant Support IR 05000293/19930801993-12-21021 December 1993 Insp Rept 50-293/93-80 on 931018-23.No Violations Noted. Major Areas Inspected:Station Blackout Coping Sys,Onsite Ac Supplies & Reliability Program,Plant Mods & QA & Maint Practices for Station Blackout Equipment IR 05000293/19930191993-11-23023 November 1993 Insp Rept 50-293/93-19 on 930928-1101.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering,Plant Support,W/Regard to Security & NRC Info Notice 93-079 ML20058D4771993-11-19019 November 1993 Insp Rept 50-293/93-16 on 930830-1015.Violations Noted.Major Areas Inspected:Audits & Surveillances,Training & Qualifications,Radiological Problem Repts & Associated C/A IR 05000293/19930151993-10-15015 October 1993 Insp Rept 50-293/93-15 on 930817-0927.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls Maint & Surveillance,Emergency Preparedness,Security,Safety Assessment & Quality Verification IR 05000293/19930171993-09-24024 September 1993 Insp Rept 50-293/93-17 on 930830-0903.No Violations Noted. Major Areas Inspected:Mgt Controls,Qa Audits & ODCM IR 05000293/19930141993-09-0808 September 1993 Insp Rept 50-293/93-14 on 930713-0816.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support IR 05000293/19930111993-08-0404 August 1993 Insp Rept 50-293/93-11 on 930606-11.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions of Previously Identified Electrical Distribution Sys Functional Insp Findings & Observations IR 05000293/19930011993-02-0303 February 1993 Insp Rept 50-293/93-01 on 930111-14.Weaknesses Noted.Major Areas Inspected:Eop Review,Rev,Approval Process,Qa Involvement in EOP Program & Operator Training in EOPs IR 05000293/19920811993-02-0202 February 1993 Probabilistic Risk Assessment Based Insp Rept 50-293/92-81 on 921130-1218.Violation Noted.Major Areas Inspected:Review of Emergency Diesel Generators & Hpcis.App a Encl IR 05000293/19920281993-01-28028 January 1993 Insp Rept 50-293/92-28 on 921124-1231.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security,Safety Assessment & Quality Verification IR 05000293/19920261993-01-21021 January 1993 Insp Rept 50-293/92-26 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Ep Program Changes, Emergency Response Facilities,Equipment,Instrumentation, Supplies & Organization & Mgt Control IR 05000293/19920231992-12-29029 December 1992 Safety Insp Rept 50-293/92-23 on 921020-1123.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security & Safety Assessment & Quality Verification IR 05000293/19920241992-11-23023 November 1992 Insp Rept 50-293/92-24 on Stated Date.No Safety Concerns or Violations Noted.Major Areas Inspected:Audits & Surveillances,Collective Personnel Exposure Status,Outage Radiological Controls & Implementation of Exposure Programs IR 05000293/19900201990-11-0707 November 1990 Safety Insp Rept 50-293/90-20 on 900816-1008.Violation Noted.Major Areas Inspected:Plant Operations,Security, Maint & Surveillance,Engineering & Technical Support, Radiological Controls,Emergency Preparedness & Safety IR 05000293/19900211990-10-11011 October 1990 Insp Rept 50-293/90-21 on 900905-07.Major Areas Inspected: 900902-03 Event Involving Number of Component Malfunctions & Operational Complications Following Shutdown.Operating Procedures Lacked Adequate Guidance for Operators IR 05000293/19900091990-08-20020 August 1990 Insp Rept 50-293/90-09 on 900806-10.No Violations or Deviations Noted.Major Areas Inspected:Control of Design, Design Changes,Mods,Engineering & Technical Support Organization,Staffing,Communications,Qa & Training IR 05000293/19900161990-07-30030 July 1990 Partially Withheld Physical Security Insp Rept 50-293/90-16 on 900625-29 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support & Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids 1999-08-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000293/19990051999-10-0808 October 1999 Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20209G2331999-07-0909 July 1999 Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good IR 05000293/19990021999-05-17017 May 1999 Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000293/19990011999-04-20020 April 1999 Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 IR 05000293/19980101998-12-22022 December 1998 Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program IR 05000293/19980081998-12-0101 December 1998 Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19982031998-11-24024 November 1998 Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of Configuration IR 05000293/19980071998-10-0707 October 1998 Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19980061998-08-28028 August 1998 Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19980091998-08-20020 August 1998 Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous Insps IR 05000293/19980051998-07-0909 July 1998 Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified ML20217P7801998-04-0303 April 1998 Insp Rept 50-293/98-03 on 980302-05 & 11-12.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Security Force Capability IR 05000293/19980011998-03-24024 March 1998 Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19970131998-02-0606 February 1998 Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19970121997-12-17017 December 1997 Insp Rept 50-293/97-12 on 971006-10 & 1119.Violations Noted. Major Areas Inspected:Eq Documents for EQ Equipment That Required Requalification Due to Containment Environ Changes Resulting from CS Flow Rate Reduction in 1988 IR 05000293/19970111997-12-11011 December 1997 Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970101997-11-26026 November 1997 Insp Rept 50-293/97-10 on 971104-07.No Violations Noted. Major Areas Inspected:Emergency Response Organization, Simulated Events,Mitigation Actions Emergency Declarations & off-site Agencies IR 05000293/19970081997-10-24024 October 1997 Insp Rept 50-293/97-08 on 970805-0913.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20198L9231997-10-21021 October 1997 Insp Rept 50-293/97-05 on 970514-0828.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Engineering IR 05000293/19970071997-09-15015 September 1997 Insp Rept 50-293/97-07 on 970625-0816.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970801997-09-12012 September 1997 Insp Rept 50-293/97-80 on 970721-0801.Violations Noted.Major Areas Inspected:Effectiveness of Processes for Identifying Resolving & Preventing Issues That Degrade Quality of Plant Operations & Safety ML20216G8181997-09-0404 September 1997 Insp Rept 50-293/97-09 on 970827-28.No Violations Noted. Major Areas Inspected:Licensee Access Authorization Program IR 05000293/19970041997-08-0707 August 1997 Insp Rept 50-293/97-04 on 970505-23.No Violations Noted. Major Areas Inspected:Effectiveness of Licensees Efforts in Maintaining Design Basis of safety-related Sys ML20149K0431997-07-22022 July 1997 Insp Rept 50-293/97-03 on 970429-0624.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20141K7861997-05-22022 May 1997 Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137E5671997-03-18018 March 1997 Insp Rept 50-293/97-01 on 970112-0302.Violations Noted.Major Areas Inspected:Operations,Engineering & Plant Support ML20134K5951997-02-0707 February 1997 Insp Rept 50-293/96-10 on 961123-970111.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19960081996-12-18018 December 1996 Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides Encl IR 05000293/19960061996-10-30030 October 1996 Insp Rept 50-293/96-06 on 960729-0923.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129A0441996-10-11011 October 1996 Insp Rept 50-293/96-09 on 960916-20.Violations Noted. Major Areas Inspected:Miscellaneous Security & Safeguard Issues,Access Authorization Program & Administration Organization & Background Investigation Elements ML20129D8361996-09-20020 September 1996 Insp Rept 50-293/96-07 on 960708-12,0722-26 & 0828-0903. Non Cited Violation Noted.Major Areas Inspected:C/As After Licensee Had Identified Potentially Inoperable Primary Containment as Documented in LER 96-04 IR 05000293/19930201994-01-10010 January 1994 Insp Rept 50-293/93-20 on Stated Date.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Surveillance, Engineering & Plant Support IR 05000293/19930801993-12-21021 December 1993 Insp Rept 50-293/93-80 on 931018-23.No Violations Noted. Major Areas Inspected:Station Blackout Coping Sys,Onsite Ac Supplies & Reliability Program,Plant Mods & QA & Maint Practices for Station Blackout Equipment IR 05000293/19930191993-11-23023 November 1993 Insp Rept 50-293/93-19 on 930928-1101.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering,Plant Support,W/Regard to Security & NRC Info Notice 93-079 ML20058D4771993-11-19019 November 1993 Insp Rept 50-293/93-16 on 930830-1015.Violations Noted.Major Areas Inspected:Audits & Surveillances,Training & Qualifications,Radiological Problem Repts & Associated C/A IR 05000293/19930151993-10-15015 October 1993 Insp Rept 50-293/93-15 on 930817-0927.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls Maint & Surveillance,Emergency Preparedness,Security,Safety Assessment & Quality Verification IR 05000293/19930171993-09-24024 September 1993 Insp Rept 50-293/93-17 on 930830-0903.No Violations Noted. Major Areas Inspected:Mgt Controls,Qa Audits & ODCM IR 05000293/19930141993-09-0808 September 1993 Insp Rept 50-293/93-14 on 930713-0816.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support IR 05000293/19930111993-08-0404 August 1993 Insp Rept 50-293/93-11 on 930606-11.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions of Previously Identified Electrical Distribution Sys Functional Insp Findings & Observations IR 05000293/19930011993-02-0303 February 1993 Insp Rept 50-293/93-01 on 930111-14.Weaknesses Noted.Major Areas Inspected:Eop Review,Rev,Approval Process,Qa Involvement in EOP Program & Operator Training in EOPs IR 05000293/19920811993-02-0202 February 1993 Probabilistic Risk Assessment Based Insp Rept 50-293/92-81 on 921130-1218.Violation Noted.Major Areas Inspected:Review of Emergency Diesel Generators & Hpcis.App a Encl IR 05000293/19920281993-01-28028 January 1993 Insp Rept 50-293/92-28 on 921124-1231.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security,Safety Assessment & Quality Verification IR 05000293/19920261993-01-21021 January 1993 Insp Rept 50-293/92-26 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Ep Program Changes, Emergency Response Facilities,Equipment,Instrumentation, Supplies & Organization & Mgt Control IR 05000293/19920231992-12-29029 December 1992 Safety Insp Rept 50-293/92-23 on 921020-1123.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security & Safety Assessment & Quality Verification IR 05000293/19920241992-11-23023 November 1992 Insp Rept 50-293/92-24 on Stated Date.No Safety Concerns or Violations Noted.Major Areas Inspected:Audits & Surveillances,Collective Personnel Exposure Status,Outage Radiological Controls & Implementation of Exposure Programs IR 05000293/19900201990-11-0707 November 1990 Safety Insp Rept 50-293/90-20 on 900816-1008.Violation Noted.Major Areas Inspected:Plant Operations,Security, Maint & Surveillance,Engineering & Technical Support, Radiological Controls,Emergency Preparedness & Safety IR 05000293/19900211990-10-11011 October 1990 Insp Rept 50-293/90-21 on 900905-07.Major Areas Inspected: 900902-03 Event Involving Number of Component Malfunctions & Operational Complications Following Shutdown.Operating Procedures Lacked Adequate Guidance for Operators IR 05000293/19900091990-08-20020 August 1990 Insp Rept 50-293/90-09 on 900806-10.No Violations or Deviations Noted.Major Areas Inspected:Control of Design, Design Changes,Mods,Engineering & Technical Support Organization,Staffing,Communications,Qa & Training IR 05000293/19900161990-07-30030 July 1990 Partially Withheld Physical Security Insp Rept 50-293/90-16 on 900625-29 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support & Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids 1999-08-27
[Table view] Category:UTILITY
MONTHYEARIR 05000293/19900201990-11-0707 November 1990 Safety Insp Rept 50-293/90-20 on 900816-1008.Violation Noted.Major Areas Inspected:Plant Operations,Security, Maint & Surveillance,Engineering & Technical Support, Radiological Controls,Emergency Preparedness & Safety IR 05000293/19900211990-10-11011 October 1990 Insp Rept 50-293/90-21 on 900905-07.Major Areas Inspected: 900902-03 Event Involving Number of Component Malfunctions & Operational Complications Following Shutdown.Operating Procedures Lacked Adequate Guidance for Operators IR 05000293/19900091990-08-20020 August 1990 Insp Rept 50-293/90-09 on 900806-10.No Violations or Deviations Noted.Major Areas Inspected:Control of Design, Design Changes,Mods,Engineering & Technical Support Organization,Staffing,Communications,Qa & Training IR 05000293/19900161990-07-30030 July 1990 Partially Withheld Physical Security Insp Rept 50-293/90-16 on 900625-29 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support & Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids IR 05000293/19900181990-07-26026 July 1990 Insp Rept 50-293/90-18 on 900709-13.No Violations Noted. Major Areas Inspected:Inservice Insp Activities to Ascertain Whether Licensee Activities Conducted in Compliance W/Asme Code & Regulatory Requirements IR 05000293/19900171990-07-25025 July 1990 Insp Rept 50-293/90-17 on 900624-29.No Violations Noted. Major Areas Inspected:Radiological & Nonradiological Chemistry Programs IR 05000293/19900131990-06-29029 June 1990 Safety Insp Rept 50-293/90-13 on 900501-0611.No Violations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Plant Operations,Security,Maint & Surveillance, Engineering Support & Radiological Controls IR 05000293/19900141990-06-26026 June 1990 Insp Rept 50-293/90-14 on 900620-22.No Violations Noted. Major Areas Inspected:Observation of Licensee Partial Participation Annual Emergency Preparedness Exercise IR 05000293/19890061989-07-20020 July 1989 Insp Rept 50-293/89-06 on 890411-0524.No Violations Noted. Major Areas Inspected:Assessment of Licensee Mgt Controls, Conduct of Operation & Licensee Approach to Investigation & Resolution of Events During 5 - 25% Power Plateau IR 05000293/19890091989-07-0606 July 1989 Insp Rept 50-293/89-09 on 890619-22.No Violations Noted. Major Areas Inspected:Changes to Emergency Preparedness Program,Emergency Facilities,Equipment,Instrumentation & Supplies,Organization & Mgt Control IR 05000293/19890051989-06-0909 June 1989 Insp Rept 50-293/89-05 on 890311-0410.Unresolved Item Noted Re Util Method for Disabling Annunciators in Control Room. Major Areas Inspected:Assessment of Licensee Mgt Controls, Conduct of Operations & Startup Testing ML20247D5561989-05-0808 May 1989 Augmented Insp Team Rept 50-293/89-80 on 890413-15 & 17-26. No Violations Noted.Major Areas Inspected:Causes,Safety Implications & Util Response to 890412 RCIC Sys Suction Piping Overpressurization IR 05000293/19890041989-04-28028 April 1989 Mgt Meeting Rept 50-293/89-04 on 890328-30.Major Areas Discussed:Emergency Plan & Implementing Procedures, Emergency Operations Ctr Staffing & Equipment,Reception Ctrs & Public Info Brochure IR 05000293/19890011989-04-24024 April 1989 Insp Rept 50-293/89-01 on 890206-0310.Violations Noted.Major Areas Inspected:Licensee Mgt Controls,Conduct of Operations & Startup Testing Activities During Licensee Power Ascension Program IR 05000293/19890431989-04-0606 April 1989 Mgt Meeting Rept 50-293/89-43 on 890309 Re Licensee Followup to 890304 Reactor Scram & Util Overview of Turbine Control Sys IR 05000293/19880371989-03-30030 March 1989 Insp Rept 50-293/88-37 on 881227-890205.Violation Noted Re Failure to Control Locked High Radiation Area Access.Major Areas Inspected:Licensee Mgt Controls,Conduct of Operations & Startup Testing During Power Ascension Program IR 05000293/19890031989-02-21021 February 1989 Meeting Rept 50-293/89-03 on 890131-0202.Major Areas Discussed:Emergency Operating Conditions,Training,Staffing, Emergency Plan & Implementing Procedures & Equipment IR 05000293/19880341989-02-14014 February 1989 Safety Insp Rept 50-293/88-34 on 881114-1226.No Violations Noted.Major Areas Inspected:Plant Operations,Radiation Protection,Physical Security,Plant Events,Maint, Surveillance,Part 21 Repts & Outage Activities IR 05000293/19870991989-01-0606 January 1989 Mgt Meeting Rept on 881003 to Review Licensee Actions to Address Radiation Protection Program Weaknesses Described in SALP Rept 50-293/87-99 ML20206L4581988-11-21021 November 1988 Insp Rept 50-293/88-30 on 881027-1118.No Violations Noted. Major Areas Inspected:Licensee Followup Activities Re Loose Anchor Bolts in Pipe Support Base Plate,Safety Significance of Subj Discrepancy & Response to Bulletins 79-002 & 79-014 IR 05000293/19880311988-10-24024 October 1988 Insp Rept 50-293/88-31 on 880829-0926.Violations Noted.Major Areas Inspected:Radiation Protection,Physical Security, Plant Events,Maint,Surveillance & Outage Activities IR 05000293/19880321988-10-13013 October 1988 Insp Rept 50-293/88-32 on 880912-16.Violations Noted.Major Areas Inspected:Corrective Actions That Resulted from IE Bulletin 85-003 That Addressed Improper Limit Switch & Torque Switch Settings in motor-operated Valves IR 05000293/19880271988-09-20020 September 1988 Insp Rept 50-293/88-27 on 880718-0828.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Radiation Protection & Physical Security.One Unresolved Item Identified Re Valve Yoke Clamp ML20154C2791988-09-0707 September 1988 Integrated Assessment Team Insp Rept 50-293/88-21 on 880808- -24.No Violations Noted.Major Areas Inspected:Degree of Readiness of Licensee Mgt Controls,Programs & Personnel to Support Safe Restart & Plant Operation IR 05000283/19880291988-09-0707 September 1988 Insp Rept 50-283/88-29 on 880818-20.No Violations or Deviations Noted.Major Areas Inspected:Use of NRC Mobile Radioanalytical Lab to Perform Independent Measurements of Soil to Determine Existence & Level of Contamination ML20154L5851988-09-0606 September 1988 Meeting Rept 50-293/M88-312 on 880831.Discusses NRC Concerns Re Rosemount 1153 Transmitter Ringing Problem & Util Approach to Resolving Issue ML20153D3051988-08-23023 August 1988 Insp Rept 50-293/88-23 on 880620-30.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions in Response to NRC Info Notices 86-003 & 053 Re Limitorque Valves & Raychem Heat Shrink Tubing,Respectively IR 05000293/19880251988-08-15015 August 1988 Insp Rept 50-293/88-25 on 880601-0717.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Physical Security,Plant Events,Maint,Surveillance,Outage Activities & Repts to NRC IR 05000293/19880281988-07-26026 July 1988 Insp Rept 50-293/88-28 on 880718-21.No Violations Noted. Major Areas Inspected:Changes to Emergency Preparedness Program,Shift Staffing & Augmentation,Knowledge & Performance of Duties & Emergency Detection IR 05000293/19880241988-07-22022 July 1988 Insp Rept 50-293/88-24 on 880531-0609.No Violations Noted. Major Areas Inspected:Licensee Followup & Corrective Actions Re Several Previously Identified Open Items IR 05000293/19880201988-07-18018 July 1988 Insp Rept 50-293/88-20 on 880502-0610.No Violations Noted. Major Areas Inspected:Qa Aspects of Mod Covering Matls, Welding & NDE IR 05000293/19880181988-07-11011 July 1988 Physical Security Insp Rept 50-293/88-18 on 880425-29 & 0503-04.No Violations Noted.Major Areas Inspected:Mgt Effectiveness of Licensee Proprietary Security Organization ML20150E8141988-06-30030 June 1988 Mgt Meeting Rept 50-293/88-26 on 880627.Major Issues Discussed:Licensee Response to NRC Maint Team Insp 50-293/88-17,status of Licensee Evaluation of RHR Valve Yoke Cracking & Followup of Assessment of Readiness for Restart IR 05000293/19880191988-06-28028 June 1988 Insp Rept 50-293/88-19 on 880418-0531.Concerns Noted.Major Areas Inspected:Plant Operations,Radiation Protection, Physical Security,Plant Events,Maint,Surveillance,Outage Activities & Repts to NRC IR 05000293/19880121988-05-31031 May 1988 Insp Rept 50-293/88-12 on 880306-0417.Violations Noted. Major Areas Inspected:Radiation Protection,Physical Security,Plant Events,Maint,Surveillance,Outage Activites & Repts to NRC IR 05000293/19880171988-05-25025 May 1988 Insp Rept 50-293/88-17 on 880425-0505.No Violations Noted. Major Areas Inspected:Exam of Identified Maint Problems, Correction of Problems & Maint Section Interfaces W/ Engineering,Operations,Qa & Health Physics Personnel ML20154F9341988-05-17017 May 1988 Insp Rept 50-293/88-11 on 880314-18.No Violations or Deviations Noted.Major Areas Inspected:Emergency Operating Procedures,Including Comparison of Plant Specific Guidelines & BWR Owners Group Guidelines with Emergency Procedures IR 05000293/19880141988-05-16016 May 1988 Insp Rept 50-293/88-14 on 880418-22.No Violations Noted. Major Areas Inspected:Previous Insp Findings & Power Ascension Test Program IR 05000293/19880161988-05-13013 May 1988 Partially Withheld Physical Security Insp Rept 50-293/88-16 on 880411-14 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Program Upgrades,Program Audits,Physical barriers-protected & Vital Areas & Lighting IR 05000293/19880131988-05-10010 May 1988 Insp Rept 50-293/88-13 on 880411-15.No Violations Noted. Major Areas Inspected:Review of Licensee Followup & Corrective Actions Re Previously Identified Open Items in Area of Matls Component Integrity & Plant Mods IR 05000293/19880431988-05-0909 May 1988 Mgt Meeting Rept 50-293/88-43 on 880408.Major Topic Discussed:Licensee Power Ascension Program.Viewgraphs Encl IR 05000293/19880071988-05-0606 May 1988 Insp Rept 50-293/88-07 on 880120-0305.Violations Noted.Major Areas Inspected:Insp of Plant Operations,Radiation Protection,Physical Security,Plant Events,Maint, Surveillance,Outage Activities & Repts to NRC IR 05000293/19880151988-04-27027 April 1988 Insp Rept 50-293/88-15 on 880404-08.No Violations Noted. Major Areas Inspected:Liquid Radwaste Sys,Solid Radwaste Sys & Gaseous Radwaste Sys IR 05000293/19880081988-04-19019 April 1988 Insp Rept 50-293/88-08 on 880201-05.Violations Noted.Major Areas Inspected:Electrical Power Sys,Including Verification of as-built Drawings,Adequacy of Breaker & Fuse Coordination & Emergency Loading of Diesel Generator IR 05000293/19880021988-04-14014 April 1988 Insp Rept 50-293/88-02 on 880125-0204.No Violations Noted. Major Areas Inspected:Matl Condition Improvement Action Program ML20151C5891988-03-31031 March 1988 Mgt Meeting Rept 50-293/87-30 on 870930.Major Areas Discussed:Followup of 870909 Enforcement Conference,Licensee Responses to Apparent Violations Identified in Insp Rept 50-293/87-30 & Programmatic Security Improvements IR 05000293/19880101988-03-14014 March 1988 Mgt Meeting Insp Rept 50-293/88-10 on 880224.Major Areas Discussed:Util Self Assessment Process Designed to Determine Readiness for Requesting Restart ML20153A8581988-03-11011 March 1988 Insp Rept 50-293/87-57 on 871207-880119.Violation Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Physical Security,Plant Events,Maint & Surveillance.One Unresolved Item Identified IR 05000293/19880091988-03-10010 March 1988 Insp Rept 50-293/88-09 on 880124-25.No Violations Noted. Major Areas Inspected:Conditions Surrounding Classification & Reporting of Notification of Unusual Event Identified on 880211 IR 05000293/19880011988-03-0303 March 1988 Insp Rept 50-293/88-01 on 880125-29.No Violations Noted. Major Areas Inspected:Status of Previously Identified Items, Organization & Staffing,Control of Locked High Radiation Areas & Control of Hot Particles 1990-08-20
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000293/19990051999-10-0808 October 1999 Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20209G2331999-07-0909 July 1999 Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good PNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation1999-06-0101 June 1999 PNO-I-99-026A:on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release1999-05-19019 May 1999 PNO-I-99-026:on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release IR 05000293/19990021999-05-17017 May 1999 Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000293/19990011999-04-20020 April 1999 Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 IR 05000293/19980101998-12-22022 December 1998 Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program IR 05000293/19980081998-12-0101 December 1998 Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19982031998-11-24024 November 1998 Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of Configuration IR 05000293/19983011998-11-24024 November 1998 NRC Operator Licensing Exam Rept 50-293/98-301OL (Including Completed & Graded Tests) for Tests Administered on 981016- 23.Exam Results:All Applicants Passed All Portions of Exam ML20154J8991998-10-0707 October 1998 Notice of Violation from Insp on 980726-0906.Violation Noted:Licensee Did Not Establish Measures to Assure Regulatory Requirements & Design Basis of Control Room High Efficiency Air Filtration Sys IR 05000293/19980071998-10-0707 October 1998 Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20239A1231998-08-28028 August 1998 Notice of Violation from Insp on 980609-0725.Violation Noted:From 1980 to 980609,licensee Failed to Maintain Provisions to Ensure That One Train of Cables Were Free from Fire Damage IR 05000293/19980061998-08-28028 August 1998 Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19980091998-08-20020 August 1998 Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous Insps ML20237A3031998-08-0606 August 1998 Notice of Violation from Insp on 980427-0515.Violation Noted:From 960710-970427,licensee Elected Not to Monitor Performance or Condition of Control Rod Drive Sys Against Established Goals IR 05000293/19980051998-07-0909 July 1998 Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified ML20247N8441998-05-19019 May 1998 Partially Deleted Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000 (Ref 10CFR2.790(b) for Violations Noted During Insp on 980302-05 & 11-12 ML20247P0221998-05-19019 May 1998 Notice of Violation from Insp on 980225-0418.Violations Noted:Work Plan to Replace External Cooling Water Flexible Hoses to a Core Spray Pump Motor Not Commensurate with Complexity of Task.As Result,Physical Damage Occurred ML20248J3981998-05-14014 May 1998 EN-98-038:on 980519,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on One Violation Involving Apparent Failures Associated W/Assessment Aids at Facility ML20217N5971998-04-27027 April 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $165,000.Violations Noted:Between Jan 1995 & 970120 Licensee Failed to Take Prompt & Effective Corrective Action for Significant Condition Adverse to Quality ML20247M3891998-04-22022 April 1998 EN-98-032:on 980427,notice of Proposed Imposition of Civil Penalty in Amount of $165,000 Issued to Licensee.Action Based on Two Severity Level III Violations & One Severity Level III Problem Re Failure to Identify & Take C/As ML20217P7801998-04-0303 April 1998 Insp Rept 50-293/98-03 on 980302-05 & 11-12.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Security Force Capability ML20217F0101998-03-24024 March 1998 Notice of Violation from Insp on 980107-0224.Violation Noted:Nrc Identified That Condition Outside Design Basis of Plant Involving EDG Fuel Oil Storage Sys Was Not Reported to NRC within 1 Hour IR 05000293/19980011998-03-24024 March 1998 Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20202D2441998-02-0606 February 1998 Notice of Violation from Insp on 971111-980106.Violations Noted:Util Did Not Properly Evaluate Cause & Implement Corrective Actions to Preclude Repetition of Temporary Temp Detectors Deficiencies from Reactor Vessel Flange IR 05000293/19970131998-02-0606 February 1998 Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19970121997-12-17017 December 1997 Insp Rept 50-293/97-12 on 971006-10 & 1119.Violations Noted. Major Areas Inspected:Eq Documents for EQ Equipment That Required Requalification Due to Containment Environ Changes Resulting from CS Flow Rate Reduction in 1988 ML20197K1101997-12-17017 December 1997 Notice of Violation from Insp on 971006-10 & 1119.Violation Noted:Nine Penetrations Were Not Qualified in That Qualification Methodology Used by Boston Edison Had Not Been Validated by Test Results to Be Equivalent to Type Testing ML20197H2411997-12-11011 December 1997 Notice of Violation from Insp on 970914-1110.Violation Noted:On 971001,licensee Identified That,Tagout T97-61-162 Was Incorrectly Prepared & Applied;Breaker 1021 Was Placed in Closed Vice Open Position as Required by Tagout IR 05000293/19970111997-12-11011 December 1997 Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970991997-11-26026 November 1997 Correction to SALP Rept 50-293/97-99.Page 2 of Subj Rept Corrected IR 05000293/19970101997-11-26026 November 1997 Insp Rept 50-293/97-10 on 971104-07.No Violations Noted. Major Areas Inspected:Emergency Response Organization, Simulated Events,Mitigation Actions Emergency Declarations & off-site Agencies PNO-I-97-072, on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test1997-11-24024 November 1997 PNO-I-97-072:on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test ML20198P8241997-11-0404 November 1997 SALP Rept 50-293/97-99 for Period 960407-970913 IR 05000293/19970081997-10-24024 October 1997 Insp Rept 50-293/97-08 on 970805-0913.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20198L9231997-10-21021 October 1997 Insp Rept 50-293/97-05 on 970514-0828.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Engineering PNO-I-97-061, on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued1997-09-23023 September 1997 PNO-I-97-061:on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued ML20211A2741997-09-17017 September 1997 Notice of Violation from Insp on 970721-0801.Violation Noted:For Problem Rept PR97.9220,trip of B Residual Heat Removal Pump,Individual Performing Root Cause Analysis Was Not Formally Trained in HPI Methodology IR 05000293/19970071997-09-15015 September 1997 Insp Rept 50-293/97-07 on 970625-0816.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970801997-09-12012 September 1997 Insp Rept 50-293/97-80 on 970721-0801.Violations Noted.Major Areas Inspected:Effectiveness of Processes for Identifying Resolving & Preventing Issues That Degrade Quality of Plant Operations & Safety ML20216G8181997-09-0404 September 1997 Insp Rept 50-293/97-09 on 970827-28.No Violations Noted. Major Areas Inspected:Licensee Access Authorization Program PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR1997-08-22022 August 1997 PNO-I-97-053:on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR IR 05000293/19970041997-08-0707 August 1997 Insp Rept 50-293/97-04 on 970505-23.No Violations Noted. Major Areas Inspected:Effectiveness of Licensees Efforts in Maintaining Design Basis of safety-related Sys ML20149K0431997-07-22022 July 1997 Insp Rept 50-293/97-03 on 970429-0624.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20149K0401997-07-22022 July 1997 Notice of Violation from Insp on 970429-0624.Violation Noted:On 970602,station Services Dept Worker Tied Open Boiler Room Door Which Forms Part of Radiologically Controlled Area & Action Not Directed by RP Personnel ML20149K1311997-07-18018 July 1997 NRC Operator Licensing Exam Rept 50-293/97-06 (Including Completed & Graded Tests) for Tests Administered on 970505-09 ML20149K1291997-07-18018 July 1997 Notice of Violation from Exam on 970505-09.Violation Noted: Two SRO Applications Dtd 970418,documented Five Manipulations Based on Credit Taken for Multiple Manipulations Due to Power Change & One Should Be Credited ML20141K7861997-05-22022 May 1997 Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-08-27
[Table view] |
Inspection Report - Pilgrim - 1986032 |
---|
|
|
Text
{{#Wiki_filter:e
'
e Y
U. S. NUCLEAR REGULATORY COMMISSION
REGION I
Meeting N /86-32 Docket N License N DPR-35 Licensee: Boston Edison Company M/C Nuclear 800 Boylston Street Boston, Massachusetts Facility Name: Pilgrim Nuclear Power Station Meeting At: Boston Edison's Chiltonville Training Facility Meeting Conducted- -S te er 9, 1986 Prepared by: '24 . c J<M 7 5 f . Lyash, Resident Inspector Date Approved by: # 9 J!#
. Strosnider, Chief, Projects Section Date IB, DRP Meeting Summary: A management meeting was held at Boston Edison Company's Chiltonville Training Facility on September 9,1986 to discuss plant status, the status of licensee management systems improvements, SALP improvement status, Mark I Containment enhancement and a number of other issue The meeting lasted about four hours. Members of the state legislature and the State Department of Public Utilities attended the meeting.
<
R10100240 860929 G ADOCK 05000293 PDR
L .- _ m
e i
DETAILS 1.0 Purpose The management conference was held at the request of NRC Region I. The licensee was asked to discuss program improvements and other topics of interest at the plan .0 Meeting Summary Dr. T. Murley, NRC Region I Administrator, opened the meeting with a brief discussion of recent regulatory actions, areas of ongoing concern, and NRC expectations regarding Boston Edison Company's improvement programs and conditions for plant restart. Mr. S. J. Sweeney, President and Chief Executive Officer, opened for Boston Edison by briefly describing the status of program improvements and outage plan Mr. A. L. Oxsen, Vice President of Nuclear Operations, then introduced Boston Edison's presentation. Copies of written material distributed by Boston Edison have been included as attachment 2 to this repor Refueling Outage Tasks Current and planned outage tasks were discussed. Those items constituting the preliminary outage critical path were summarize Ongoing inspection of the residual heat removal and core spray pumps, plans for completion of appendix R modifications and the licensee's plant decontamination program were reviewed in some detail. Primary containment enhancements to be implemented during this outage had not yet been factored into the outage schedul Startup Checklist Development Development of the licensee's startup checklist was reviewe General categories of information and issues to be addressed prior to startup were presented by Boston Edison. NRC management stressed
,
that the checklist should identify all pertinent issues, and should be sufficiently detailed to assure that issues are fully resolve Boston Edison stated that detailed startup and power escalation plans, including suitable NRC evaluation and approval hold points, will be develope Containment Enhancements Status The licensee discussed possible primary coatainment enhancements and their implementation schedule. Preliminary plans include improve-ments to drywell spray and containment venting capability. Additional improvements are under evaluation, including the installation of a third emergency diesel genetstor at the site. NRC management compli-mented the licensee's approach to the station blackout problem, l
'
t
.
e
focusing on prevention of a blackout rather than compensatory mea-sures. The licensee stated that those modifications addressing dry-well spray and containment venting capability will be completed prior to restart. Training of the operations staff in use of revised emergency operating procedures, and in the capability to control degraded conditions beyond the design basis event will also be completed. The need for careful and complete consideration of any changes made was stressed by NRC managemen d. Management Performance Indicators The licensee briefly described the program in place to track the status of selected performance indicators. This program wi consider INPO, NRC and industry standards in measuring overall performanc e. Operational Staffing Status The present licensed operator staffing situation, plans for increasing the number of licensed individuals, requalification training and simulator status were reviewed. The present shortage of operator licenses may continue until June 1988. The licensee stated that management SR0s may be used to supplement the R0 complement. Regional management pointed out that the removal of key management individuals to alleviate the R0 shortage could weaken the organization in other areas, and that this should be carefully considered. The need for forward looking plans to ensure that a strong operator pipeline is established was also stressed by the NR f. Six Week Management Improvement Process The results of the licensee's six week internal management assessment were discussed. The changes and improvements made to the work control system were outlined. The licensee stated that not all work items had been captured and factored into the improved work control system. This effort is expected to be complete by the end of October. Full-time planners have been assigned to each section to support this effort. Regional management stated that completion of this planning effort would be an important ste g. SALP Improvement Status Management improvements directed at SALP-identified weaknesses were discussed. The development of better communications and personnel accountability were cited by the licensee as important step Planned additions to the station personnel complement were outline Emergency Preparedness reorganization, staffing increases and drill / exercise plans were discussed.
i L _ ___
o
-#
4 Other Topics Other discussion topics included: 1) the recurring failure of the-recirculation MG set field breakers, 2) surveillance test scheduling problems, 3) involvement of the safety review committee in assessing readiness for restart, 4) Appendix R modification status, 5) diesel generator differential relays and 6) residual heat removal (RHR)
system leakag The recurring failure of the recirculation MG set field breaker to trip on demand, and its impact on the anticipated transient without scram function was discussed. The licensee stated that General Electric had been contracted to perform a root cause analysis, and that corrective measures including alternate designs were being evaluated. It was also stated that satisfactory resolution of this issue would be reached prior to restart. Regional management strongly stressed the need for thorough investigation and strong action to prevent future problems. The Regional Administrator indicated that the final resolution would be closely reviewe Recent surveillance test scheduling problems were discussed. A licensee evaluation will be performed to identify all once per cycle tests and determine the correct test requiremen Modifications and maintenance performed to address the RHR system in-leakage problem were briefly reviewed. The licensee stated that at least two of the system injection valves, i.e., the M0-1001-29A and B valves, will be replaced during this outag The licensee outlined plans for performance on an independent restart readiness review by the corporate safety review committe This review will cover the spectrum of issues impacting startu .0 Concluding Statements Dr. Murley closed the meeting by indicating that Boston Edison appears to be taking positive steps to improve performance. The effectiveness of these measures will be closely monitored by the NRC. Progress of the licensee's effort to identify all outstanding work items and issues will be reviewed during the next management meeting, w
o e
ATTACHMENT I TO MEETING REPORT 50-293/86-32 MEETING ATTENDEES U. S. Nuclear Regulatory Commission T. Murley Regional Administrator W. Kane Director Division of Reactor Projects H. Kister Chief, Reactor Projects Branch #1 J. Strosnider Chief, Reactor Projects Section IB M. McBride Senior Resident Inspector, Pilgrim J. Lyash Resident Inspector, Pilgrim P. Leech Project Manager, NRR Boston Edison Company (BECo)
S. Sweeney President and CEO J. Lydon Chief Operating Officer E. howard Vice President - Engineering & QA A. Oxsen Vice President - Nuclear Operations A. Pederson Plant Manager K. Roberts Director of Outage Management R. Swanson Nuclear Engineering Manager S. Hudson Operations Section Head C. Gustin Vice President - Corporate Relations J. Ashkar ' Assistant to the President W. Frigard Senior Counsel W. Stone- Assistant General Counsel H. Brannan Quality Assurance Manager R. Silva Emergency Preparedness Coordinato L. Mcdonald Planning and Scheduling R. Tis Public Information M. Monahan Public Information P. Hamilton Compliance Other Attendees Senator Edward P. Kirby Representative P. V. Forman C. Barnett Massachusetts Department of Public Utilities P. Garrity Massachusetts Department of Public Utilities S. Hanley Massachusetts Department of Public Utilities s__
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
r-
. e s .
.
'
9/1/86 10/1/86 12/1/86 2/15/87 3/25/87 4/25/87 VESSELREASSENELY START Ui)
APPENDIX TT CUTOVERS g
' B ' CORE SPRAY ; i :
FLOW EVALUATION i i i I : : :
i . . .
* A * D/G APP. R CUTOVER i i i i : : :
i
.
:
.
:
.
:
.
i ' B ' D/G APP. R CUTOVER j g33g j j
! : INSPECTIONS : VESSEL :S/U CHECKUST RECEIVE.CHANkEL & INSPECT NEW FUEL
. .
AND u lNN
:
SYSTEM LEAKAGE i
[SU EN
: . : .: : HYDROSTATIC - -
: EFUELFLOOR : : 5 CRD'S LPRM. 5 TEST : 3 i PREPARATIONS 5 i : DRYTUBES : : -
S/U PPESSUREE
.
-. VESSEL : . : : :
INSTALL & TEST i OISASSEMBLg i i i i . DINSNCT NEWREFUEL : - -
: : pip : : : liOWPRESSURE BRIDGE :
_
j p' l'"' CABLE! !ILRTj jSYSTEp i
. BLADES :
.
: :
..
:
.
:
. MJDE i i H2 ELP8M i i SWITCH i i iCAQLE i
: 5 TESTING
.
.
I ,....
.
5 i RFO#7 MODEi i
: *
CLOSEOUTS & i :
5 TURNOVERS -
% PHYSICS
, 3 . :TtSTiNG SLOW ESCALATION TOeOwER
.
P_RELIMINARY ORITI_ CAL PATH P_R_01E_0_TLON F_OR RF_07+
.
.
. .
, .
-
.
-
l
.
i
.l l .
i R@lVIIPIREIBIEKSILVE_IP_1LAFT :DECROFTAMIIEAE@F :ELAK i
.
OBJECTIVE -
i l
l l
CONTUSUED Personnel Entry In Street Clothes, Into All Critical Safeguards Areas And Operating Areas l
Not Designated As Contaminated Area .
l l
---- _ - _ --- -- - - - _ - - - - - ---- _ --- -_ _ _ ._
- -
, .
..
-
,
!
I!1NIIPHIEEIDEIID_ ACCESS _I[S_A_PHAd_@IR C_@NiMRIIIBFEUR
_
,
T_@ @VEIRALIIa_IEEIRF@IRMANCE_IIIVIIEIR@VEMENI?
_
.
.
* SAFER OPERATION
* MORE RELIABLE OPERATION
'
* IMPROVED MANAGEMENT CONTROL
* CREATES A FAVORABLE IMPRESSION AND ENVIRONMENT
.
I
- _ _ _
,
. -
. .
,.
.
.
.
PLAN BllE8 NSl@NS .
'
.
-
- * Team Approach With Clear Responsibilities And Authorities-
! Incorporates INPO Good Practices -
-
'
l * Continuous Identification And Correction Of Contamination Sources l
* Effectiveness Reports To Executive Management And All Station Personnel
l .
; * Training Program Philosophy And Requirements ,
Decon And Containment Techniques
<
.
i l
}
-.
- - - - - - - - - - - - - - - - - - - - - - - - -
__ --
_
_
. .
,
..
-
.
.
ERCGK JM[KMmW1M11@H
,
,
l-
* Select Contractor With Proven Technical-Expertise
* Authorized And Hiring 4 Management Persons To Learn Techniques From Contractor
* Authorized And Hiring 30 Persons That Will Permit
.
l Continued Implementation by BEC l
'
i
;
,
. .
.
, .,
.
e
.
!
C SSIIE_03PMHP CEDf8_CEILHST
-
WI3&_ ADDRESS _ AIL :: PACE 7E
- . _
@ E FHDLEAE_ELAFT @EERASP:::@F AMD RilAEAGEPflERU
_
!
i .
i ' '
) * Safety Issues - BECo, NRC And INPO
* Management Performance Indicator Program And
Management Readiness Assessment
- * Station Hardware And Software Operational Readiness ,
l
* NRC/INPO Compliance Status Review (Commitment Backlog)
l
.
.
- -
. :
,
.
'
l
!
I
'
_TIBIE_S_TAIRTKJIP CHDECM4ET WIILL_AIDID:RESS_ALL_IFACETS
_@:F NUCLEAIR_IP_LAN" @lERIRATIL@JC AhTD MANAGEMBE?
.
* Station Physical And Radiological Cleanliness l * Fitness For Duty
* Emergency Preparedness ,
! * Controlled Escalation To Power Operation With Special Tests
.
I
-
, .
.
..
l .
IYIASTEIR_IPIREsSTAIR5ISTIP CIEIECM40TGLOBERTS)
.
<
;
. REDEX i
i A. Plant Modifications (Swanson)
l B. NRC Commitments Backlog (Mcdonald)
i C. Plant Housekeeping (Pedersen)-
~.
D. Overtime Contro1 Effectiveness (Oxsen)
E. Management Readiness Assessment (Oxsen)
F. Operating Procedure Update As Required (Hudson)
fi
<
G. SALP Issues (Pedersen) ~
l H. Performance Indicator Program Approval (Oxsen, Howard)
'
I. Plan For Excellence (Ashkar)
l J. Technical Specification Changes (Keyes)
i K. Operator Re-Training Prior to (Hudson) -
,
L. Emergency Planning (Silva)
M. Plant Startup Program (Pedersen)
N. INPO Open Items (Mathis)
,
(
.
.
'
.
'
)
.
i .
JB@STON 3]KIS@N'S G@AIS.
,
OUTAGE Identify And Implement Containment Improvements Responsive GOAL: To Bernero's Draft Policy Prior To Startup. Revise Procedures And Train Operators To Improve Operational Readiness For Effective Severe Accident Managemen .
.
LONG Perform A Comprehensive Probabilistic Risk Assessment RANGE Supported By Deterministic Analyses of Severe Accidents GOAL: To Ensure That:
1. The Pilgrim Specific Response To Severe Accidents Is .
Well Understoo . These Insights Are Effectively Used For Severe Accident l
Risk Management Within Boston Ediso . These Insights Are Available In Support Of Emergency -
Preparedness Plannin . .
.
;<
.
-
EEIRNEIR@'S PIR@POSEID
,
SEVEIRE AC_CHIDEW C@WI%HNIVIEWi:%:LI:CY ':23 :BWIR's
! * Hydrogen Control e Reliable Containment Drywell Sprays ,, -
j * Reliable Containment Wetwell Venting
* Core Debris Barriers
* Emergency Procedures And Training -
l
.
I
. .
,
;}
.
..
.
$ _@ 3 5_l_O E 3 U E 124 MEE R L O $_ U E ! J r 3 5 K
.
. HYDROGEN CONTROL
'
* No Need For Major Design Change .
* Administrative Control To Limit The Amount Of Time Containment Is Deinerted Is Under Study
* Decision Will Be Made After Reliability Evaluation '
Of Nitrogen Inerting Function Is Completed
,
*
!
'
- - -
.
.
..
'
.
AC":::@NE ::P::aANICE:D AU ::P::::A:XMI
!
I CORE DEBRIS BARRIERS I
* Core Debris Behavior Will Be Evaluated Using The IDCOR MAAP Code
l * Based Upon Industry Studies To Date,
No Modifications Are Anticipated --
.
_
'
- -
. .,
**
.
i
,
AC115NE3 l5[4AEE33 Af 2[7851 E
!
- ,
,
CONTAINMENT DRYWELL SPRAYS I
* Fire Water System Will Be Interconnected to RHit System To Provide Additional Source Of Water For Drywell Spray
* Options To Provide For Control Of Essential Valves Under Station Blackout Conditions Are Being Evaluated
'
* Modifications To The Existing Spray Spargers Are Planned Based On Evaluation Of Severe Accident Events
.
- -
. .
;
*
,
/
,
.
d_CI532125hMWU3 Ol? Kod32K
I .
l l CONTAINMENT WETWELL VENTING
)
i * Capability For Venting Wetwell at Containment Design Pressure Using Supression Pool As Filtering Medium
- Will Be Provided l * Criteria And Guidance For Operational Use Of This Vent l
'
Will Be Prepared To Ensure That The Intended Risk Reduction Benefits Are Achieved
.
* Options For Routing The Vent Discharge Are Under
! Evaluation. A Selection Will Be Made After Reliability
!
,
And Risk Evaluations Are Available I
l l
t
. _ _ - .
. . . . . - _ _
_ _ . . -
-
-
. .
.
,
. /
.
kCI_[_l_OES d_AM EE E 3 d$~2lEU_8t3 1 l
,
EMERGENCY PROCEDURES AND TRAINING I * Revise Procedures To Incorporate Plant Changes Made
- This Outage -
!
'
* Revise Procedures For Station Blackout Event i
j * Review Procedures Against Current ATWS Event
! Analysis For Possible Improvements
!
,
'
i
. Revise Procedures For Combustible Gas Control
. Operators Will Be Trained In All Emergency
.
l
-,
e
. -- _ --- - - - - - - - - _
.
-
. .
'
, .. ./
.
l $$ ?$ NS ? 8 NEh $N E $rX X
! OTHER IMPROVEMENTS
!
,
- * Modifications Will Permit Fire Water To Be Supplied To l The Reactor Thru The RHR Low Pressure Cooliint l Injection Valves Under Station Blackout Conditions
. * Capabilities To Backup The On-Site Fire Water Pumps
- Using Fire Trucks Will Be Available. Pilgrim Now Has
! A Fire Truck At The Site.
! -
j ,
* Operators Will Be More Knowledgeable Of The
- Plant Behavior And Capability To Control Degraded l Conditions Beyond Design-Basis Events As A Result
, Of Severe Accident Studies Being Done i * We Are Evaluating The Cost And Benefits OfInstalling l A Third Diesel Generator During This Outage
.
- -
. .
.
.
.
.
.
MAKARt:EEEEI? EEXF_EM::ARGE :::E:MCAt ?@::RE
.
* INPO /NRC PROGRAMS INCORPORATED -
*
INDUSTRY GOALS-STANDARDS INDICATED
* BECo GOALS INDICATED ..
t
* EXTENSIVE VERTICAL DISTRIBUTION
.
m
a
.
WASTE VOLUMES SHIPPED
- BY TYPE
**** LEGEND
* 1 ._._._._._._._._.-.-._._._. l ] DE ,
.____ ._._. I IBEAD RESIN
. .. :._ . _ _ _ . - ..
'
- 1 I powounno namin
-
_ _ _ _ . _ _ _ . ._.____.- __.-_.._ __ _ _
,
.
I Ic-maw
. . . ___.".. . _.i-._.-._._. I I NC-oAinr
__ _.-._._._._._.
_ . . .
- . - - - _ - _ _ - - - - . - - - .
n _ - - - - ..
. _ _ _ _ . _ . . _ . _ _ _ . _ _ . _ _ _ _ . _ .
.. _ _ _ . . _ _ ._
.. _ .__ . .. -. _ _ _ __ ___ _______ _ . ___ _ .
-_
.. __ . _ . _ _ , . . _. ._._. ..
\
'
p . . . . . . .
rue van aan uAY..JUN JUL. AU. SEP 907 MOV 950
. .
Jaw aan. sees runu onc. sees WASTE VOLUME 1986 CUBIC FEET / PERCENT
BEAD RESIN 4845 27.1N POWDERED RESIN 119 .7N [
C-DAW R484 14.5N DE 1847 7.8K
\ l l
uc_ DAW sero.s 4e.oM VOLUME YTD = 16,982.8 CU. F avouer as, sese
.
* * " - --
---w- - - . . - . . - . _ . . _ . _ _ _ , , , . _ _ _ _ . ,_
.. . - - _ _ _ _______
&
.
.
WASTE STATUS 198@
*""
LEGEND MONT,HLY ALLOCATION asooo--- .--------------------- ---
Q agy, yog,
---__________---___ *
*
-
.. ...... LE98it
'
'
soooo-------------- 1---
..
-
.-
7' - - - - - - ._ TOTAL vOL vro
'
- .-
.~ __ s ees MAXIMURS
'
. _ _ _ . _ . _ . _ . _r" ~ ps ' _ _ _ . _ . _ . _ .
,
lI,ooo ,/
*
*
.-
.
,-
'
..
,oooo.- . _ . _ . _ * .-:_.___._.___. .
-
. ....-
oooo. -. 2 ,'.'.. _ . _ . _ . _ . _ . _ . _ . _ . _ . ..
*
.
f
p , - .
s my p p p p
"
o JAN MAR MAY JUL SEP NOV FEB APR JUN AUG OCT DEC JAN. 1988 THRU DEC.1988 WAS74~ PROXC7/ON
* " *
,
LEGEND l
l MONTHLY ALLOCATION asooo------------------------------
_______________________
Q ACT. VO / ...... LIMIT soooo- - - - - - - - - - - - - - - - - - - - - - , fj 2 - - - - ,, . _ TOTAL VOL YTD T .'*
'
_ 1905 MAXIMUM
*
i$
'
/ .
*
- . _ . _ . _ . _ . _ . _/: *
'
'
N ,o00 . / .
-
*
B
- -
- -
*
f .
*
*
,. ._._. . _ . ,
_ . _ . _ _ _ _ _ _ _ . _ . _ .._
I *
. ,
*
. / . .**
.
acoa- --
B.~
3-ls*~------------------------
mn E g o d P 1 Fil P. m 2_ F. In 7. I. ff ,
JAN MAR MAY JUL SEP NOV FEB APR JUN AUG OCT DEC l JAN. 1986 THRU DEC. 1986 Volumes shown f or Sept.-Dec. are FORECAST volumes o n ly.
1 .
- _ _ _ _ _ _ _ _ . _ _ _ _ _ _ - _ _ _ _ _ . _ _ _ _ _ - - . _ - _ _ _ . -- . _ _ _ _ _ . . - --
.____________ _ ____ __ _ _ _ - _ _ _ _ ______ __ __
.
. .
* e
~
LAST Cm7 Y Eb O n -- m g '-
s
,
.v o.= s
_
FROM: , l28 AUGUST'86l
,
TO: l3 SEPTEMBER *8el PNPS HAS HAD [9 ROR's TOTA!j
# OF ROR's PER CATEGORY O 2 4 6 8 10 CATEGORY
-
rrE-1. CLOTHING CONTAMINATION g 2. SKIN CONTAMINATION u - -
3. CLEAN AREA CONTAMINATION g-, _ _
.
*
4. " SPILLS" g ,'
'
5. PORTAL MONITOR ALARMS g 6. IMPROPER FRISKING 7. FAILURE TO USE ENG. CONTROLS E 8. ALARA CONCERNS "
! #-
9. PROCEDURE VIOLATION / INADEQUACY
-
,
10.RWP VIOLATION / INADEQUACY L-l 11.NOT OBTAIN/ ADHERE TO H.P. BRIEFING E
'
12.H.P. EQUIPMENT U
- 13 VANDALISM E 14. POOR HOUSEKEEPING 0 15. MISUSE OF RESP./ ISSUE SYTEM E ,(1) -
16. EATING DRINKING,ETC IN CONTROLLED AREA 17.DOCR CONTROL -
18. KEY CONTROL 19.lMPROPER POSTING (2)
20. POSTING /S.O.P. VIOLATION 21.lMPROPER STORAGE 22. DOSIMETRY LOST /NOT WORN 23. DOSIMETER OFFSCALE 24.OTHER ,
MAJOR - MINOR - iEl::===E
.i
'. SIGNIFICANT OCCURRENCES 1. A Watch Engineer and R.P. Tech found candy in an R.P. Control Point desk on 23' Reactor Buildin . During the weekly audit on High Radiation Area doors, the door to the Fuel Pool Heat Exchanger Room was found open. The locle. had been defeated with tape.
I
_ _ _ . _
i
-
i , i i ; s ,.1
--n..-...,-....>.-~~.~--
g . _ . _ . . - _ s.:... v . -- - .
-
,,
'
'l
% .,Nw * " "dg ,, h l dl>
.
' '
-
.
-
haai .; og .
'
'
I g
. _ac Ercv a
o .. -
. '
.
6 '
~
-
,
-
-
.
- '
*
'
i * "---"f" ,' m
'
,
s
.aa ~>U ""
- l. . . _h x . . ir-m '<
m
,
- -- '
'
.
. ,,, ,,,y mem ueb, f r % x,n a . .-.
g-h e u / :
h i
.p.. y(.. .
,
/ '
, .., .;.,1 ,u L & mr - . . . . ..-
.
, . . \., ,
n,_,_, ' -
s ,,,
,.. qi -
..* *e * . .
g ggg 36 P
,
-
-
, - *
.
y l E- ELt2 : E!f v
:$
-
\-- gi
-
- .- -
. _ _ __ _ . . , ,,, i. t y'.;;,
.
;
i 40'E'
Q. a. .
. ,' , -
Ne pu. .ys,,
: h n i
.. -
-
3;;;;;y7 .
-
,.
-
_
,a .4 Ses ..nsg .t .- ]m ... e ram ,_' .**'.O. . g ,h_
.
.
.,
.. ..
. ,
.
. - - -,
. S. . eg . e--
-
. . a ,- . . . . -i
. *-
.
. ,
.a , - - -,
.,
was we -. - .
q
%,
. ,
r, .
_a . ., s- ,
.
-
.
1 4.y ,,n;;y: --
g-3
-
3 e ,u ,nggpg . , , ;. j ,
e ,
*
e -
E1 -
, ,~
. .,,_
k :,-- 9s p, ., ..
-
, -
"..Q
-
?w.,.
,
-
* .
-
'
.. ; .;-::' + ,,,,,,b; a 4G
.
.
.
. .: . . an ,
5.g&.,
:re--.._ > .
_ - -j .
l
.
.
.
N - ---- k
'
W T 4"P tN"
.
.' 4,pgjy jY
*
,Q i
,
9 '- (
:
-
.
, ,,p "" [_y g- ,,
et j
-
oggs a
.J
. .
. ,- .
. ; .
-
,, .
ca .
.29~.. $' 5
'
ne.AC .:- . _
. v.r@.'. ,
-
;
.
-.
._
.
- .
?
=
TF' - - - -
+
-ar.n f. b,y-gi
.
. :
,,,,.
3+.._.,
- .
. a r.a. ' , .
..
- nn w ,,L
",,g gg
.
'
' --
7 ew_ Ws1P6 -
..
fpuc% - + - -
,=* *- *- = * *"i t a y ! snge
. ,.
y
. _
. - .. -
~. . ._
MM'
~ '
l t
fa#. .
1'
_g i.I ec"M
--g --
-o . s
._qg .
-
m _ ._ .
= * -. .= . . ..y w .
.F%.
;
&, **
~
. 51_ . ~' :_^ .g f, . L _.. s _'? b
-
y .
-
g.rpQ r - . .
. .
. r, _ e
-.
>-c _.-
.
- - . -. . . .
.:. .
. _ .. __ ___,___ __ .. g .. ,. - - - - _ - -
.1 .n !y !w5
'
g - ,-- ,w. .a. .
, me .e v -
m-
.
..
t; . :
-
,, -
m uw f.we 7 _
:
y -
-
.
i -
: .
.
. ... t
.
6_
i ,- m- -
g_ ~,.am- 1 a6. eg
,
s :. J _3 m, _
=n. vne 's
--
w n u e<f n
-
r
, -
e
.
;.
y => n . m
.
-.
.. .
. ,1-
.
,
.
'
. ., e
. _ +. ..
_
v_--
%, 7
ws%% -
- ,%.h --.
i
.
'
.
U
.
'
.!_ _.:. '.,.I
.
_
-
e,
.
.
,
.
.. gM1 . . .
- pd n ye .S .,. b Tf *g g .
'
-
1%
!
s1 un'
SH W E i E
.
..
Ib
,
- 4,
& sa m< -
n., n ie , .
ryi -
,
.--v--+
-
.
C
;a m
"TE J' *
'r"I ; . . _ , -
- - _ u .
-- -
'
* 6
'
l . I j I6
-
. :ssa l ,
-
. --
.:.3 .
- l-@ , _
.
: .
, sancts e x<t. asn'-V
'
. .q RDOR PMfGTE,tc!T-6' & 6'<f
.
-,-,,-m, - - - - - , , - , , , , - . - - - - - --
, - - - - . . _ - . , , - , - - - , , - - - - - . . , _ - - - - - - - - - - -
I I
..
.
. l I
l
-
i
,
-
.
g
'
8
9 7 d!r G
G I4
@
m N
<
Q (SE b
, @
.
'
-
I
- - , . . , , . ~ , , , , - , - - - - . . . , , . - , , - - - - - - - ,, , , ,-- ,,
-- -
.
. .
s, .,
.
.
.
.
[1E_@NMalEl+WS_1@:Bi3_@lER_@ !
EKER T@ 85%BT UzP
'
.
'.
- Annual Simulator Training In October,1986 In Morris, I Participate In On-Going Requal Program
- Prior To S/U (February - March,1987) -
* 20 Hours Of Hands-On Training Per Shift
- On Our Plant Specific Simulator
'
* Emphasize Normal Plant S/U And Operating Transients ,
* Revised Emergency Operating Procedures
. -__ -_
; .
, ,
.
.
'
.
: _C_@ E 3 R @jL @:_7 :1@lEB_@ @VIKREK3
1 :;
j - GoalIs 6 Shift Rotation
,
* Allows For 40 Hour Work
'
! .
~
i . Including Training And Vacation Coverage
,
- Negotiating With Union To Return 3 R.O.'s
- To Operations
!
'
l
- Use Managenent SRO's As An Option
'
To Maintain 12 "RO's"
- Potential Shortage Of R.O.'s Until June 1988 '
Could Impact Goal Of 6 Shift Rotation
.
__ ___________ _ _ _ _ _ ___
_____ _ _ _ _ ._________ - ___ . __ ._ _
7 .
.
.
.
.
SIMULATOR STATUS .
* BECo SIMULATOR BUILT BY CAE ELECTRONICS , MONTREAL , CANADA
* ACCEPTANCE TESTING PROGRAM AT CAE 8/25/86 -11/24/86
* BREAKDOWN, SHIPPING AND SETUP AT PNPS 11/25/86 - 1/9/87 s
* TESTING AT PNPS 1/12/87-2/27/87
* SIMULATOROPERATIONAL -
3/2/87
.
e
-- . . . .
.
. ..
'
. .
.
~ _ _
_ _ _ _ _ ___
- --
31 -
30 -
l
'
25 =
,
'
20 , . , -
,
.
. c
;b: .
l 15 - k 'i 13 13 k9 12 12 &.
1 0 .-
y ___ __ g_1E m-s 9*$
-
p9ig 10 ;9 u) 7{4
.Ja .m 9 e e-m:
S 9
~
,
!
, g
,t:; s e; .y-Nj <!$1 ,'$
k D $ 1$
At b f)
5= Ph, $.. -<!
,
c54
. r, p' ,,.
o-)
h _ a g , .: r 3I I
g hh
:. n ,k...
.
,.q
-
.. ,.-
c ..
kip;r sl {h, FIj g 5" ,$j,-
hi ,; . fN v m
- u:. .au .a a -
JUN 86 AUG 86 NOV 86 APR 87 JUN 87 JUN 88
.
.____
,
.
g
'
-
g W
g
'A g ;
W
;
8 g 8Mg g -
9 l -
1Fl l Jl l
*
l ' "
Dl l ?
.
.
[ .
t y N[ l '
,
,
,
l '
,
,
Ol l
,
l
,
Sl ,
l
"
l
*
M
.
Al l l
" '
'
Y Jl l
"
8 l 9Jl l t
o .. P E 1 o s L M[[ h c x U U
[
s )m #7 w D Al l
o a x #
e hs 4 T E l n s ,' '3 E '
' i,I I '
t. e a s t ci1 I I I R
H M ll C R c cw-i A
C l n
e N
( o .n T S l u ee S F_ l l w mm G l *
s
- aa N
I Jl l
!
?[
( l N
I Dl l
'
I
'
.
A l R Nl l
T l f o Lh
'
6 o Oc O ll 8h t e Oa
-
l / c h s c
l 3 S t a Hw /
o Sl 2O
/ w Cn s l
9 R N So l a
E n Al l
T M o 'R l
R U l
A 9 O T
6 Jl l T S
_
8 l
-
w:IO3
_
..
9Jl }
y,m f+ Wz37 -
OWOZ # n, i 42 W naOP= I
_ 1 i
_ l Ml
;
l q
_
/ 'O Al l
5 RO l
)
m SR l o
_
l a 25 o
_
Mj x h
_ l E c t
.
l o S n e
_
l C n o
_ Fl R ol o J h rM u
l N o C pe c s
. l ( h O P r S n e o0 Jl l c " e i S * P r u M s N O o s l O " L T
l R * U (R l
, -
-
'
, l i!jll ; I ;!l : l l,>!!lii)i!!Iilj
- - - _ -. .
-
. .
.
.
.
.
I 6 WEEK ACCOMPLISHMENTS
'
i
= Familiarization Of New Team ~.
-
* Completed Initial Self-assessment
* Instituted Team Building Periodic Meetings
)
* Improved Work Control System
.
* Determined Measurable Performance
- Indications For Areas Requiring l;
Immediate Attention
= Selective Hardware Improvement j
'
l * Selective Programmatic Accomplishments
-.
l
, - - - - - - - -
- _ _
:
l_-
-
-
.
.. .
l
! .
!
i
-
6 WEEKS OBJECTIVES l
* Familiarity of New Team Members ,
~
j * Determine How To Recognize and Address j Current Weaknesses
~
* Determine How To Achieve And Maintain Excellence l * Review Previous Goals And Objectives And Set j Performance Indicators To Measure Future Progress '
* Accomplish Selective Programmatic And Hardware
.
Improvements I
e e
- . .__ ._ . . -. _ _ .
_ _
-
. .
.
.
.
.
EXAMPLES OF HARDWARE
,
IMPROVEMENTS ,
- ,
.
~ .
,
* Diesel Generator Relays
,
* Security .
'
* Fire Protection i
i i
I i
,
7 M - -
- -- - --
-
! . .
* *
!.
..
*
I I FUTURE ACTIONS
\-
i
!
Continue To Resolve SALP And INPO Concerns
'
*
* Develop And Measure Additional Performance Indicators Toward i " Strive For Excellence" I
'
* Visit SALP #1 Performers
* Participate In INPO Evaluations To Observe Other Top -
Performers
* Continue Periodic Self-Assessment And Team Building Meetings i
!
! * Strengthen Work Status Reporting System -
r
-
__ __-- - -
.____ - . .. _ -
1 -
. . ',
.
.
i SALP ISSUES CONTINUALLY
! BEING ADDRESSED
:
'
i
!
* Staffing & Overtime Control
]
* Security Upgrade I .
l * Fire Protection Upgrade .
i
* Maintenance Effectiveness
* Operator Effectiveness J
! * Commitment Control .
.
* Quality Involvement I
l
* Corrective Action Program l(
* Radiological /ALARA Control -
,
* Training Program a Surveillance
.
...
,
RECENT PROGRESS
.
! ACCOUNTABILITY
- * OWNERSHIP OF TASKS.
i e COMMITMENT SCHEDULING
! e DEFICIENCY REPORTS (DR'S)
l RESOLUTION
!
* WORK CONTROL SYSTEM
- -
.
COMMUNICATIONS e DAILY MEETINGS i e ITEMS OF IMPORTANCE e MONTHLY ALL HANDS MEETINGS
'
e TOP DOWN MEETINGS l
l ACTIONS e ELIMINATED OVERDUE DR'S l e SELF ASSESSMENT MEETINGS .
! e FULL TIME PLANNERS e PLANS AND SCHEDULES FOR ALL WORK
j,-
. ~.. __
,
...
-
i l
-
i.
i.
l EXAMPLES OF PROGRAMMATIC l'
i ISSUES ADDRESSED
!
'
.
.
* Staffing And Overtime Control ,
* Operator Effectiveness i
i * Commitment Control
'
* Radiological /ALARA ,
* Planning And Scheduling
* Vendor Manual Validation And Continual Update
* Maintenance Request System Upgrade .
*
i 4 -
. ..
,
.
i
-
.
,
- J
!
1 .
i SURVEILLANCE SCHEDULING
'
* Identify All Tests With Once/ Cycle Definition
.
~.
- * Determine Test Frequency
* Obtain NRR Concurrence On Appendix J.
(program vs. component)
,
I
* Submit Proposed Technical Specification Change l
_
. . ._ __
'
-
. . ,.
-
i
..
! .
j
,
!
!
!
_ -_ _
_ _ _ _ _ _ -- A -
( __
!
!
: .
.l .
! * Added 5 in Nuclear Management Services Section
!
* Added 30 In Maintenance Section
,
.
.
.
* Added 4 Supervisors in Maintenance Section
!
- .
* Adding 13 Engineers in Technical Section .
__
___ _ _______ _ _ . _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ . ________ - __ - -______-_ - -__ ____ _ _ _ _ ._ _
.
.
,
. ..
.
.
;
-
!
;
:
! ENDEEGENC1f_IP_PJEIPAREDNESS @RGANIEATIL@ NAIL @ HART
!
l A.L.OXSEN
,i VICE PRESIDENT j NUCLEAR OPERATIONS 1 .
l l
!
C. C. FULLER R. E. SILVA EMERGENCYPREPAREDNESS ASST. EMERGENCY l
PREPAREDNESS -
i COORDINATOR COORDINATOR
,
J.F. CROWDER EMERGENCYPREPAREDNESS DRILL & EXERCISE NUCLEAR TRAINING ADMINISfRATIVE l
l COORDINATE INSTRUCTOR ASSISTANT l
-
!
!,
l
___ - _ _ . .__ __ _ . _ _ . - . . .
,
'
.,.
-
!
-.
1 l -
: :IE@::RGANIEAi?:::@N @:F C?:E:E :EK:E::RG:ENCY
! :IES:P@NS:E I?:EAKS8
: Note: NRC recommended reorganization to
- insure the E.O.F. as an outward j looking facility.
)
0.S.C./T. E.
l Accident Mitigation Environment & State
'
Primary concern Interface Primary
- Concern
!
l * EmergencyDirector * EmergencyCoortlinator
! = RadiologicalEmergency * EnvironmentEmergency ,
I Team Coortlinator Team Coortlinator I
j = EmergencyPreparedness
Coortlimitor
* CommunicationsLiaison
! (MDCA-Framington)
* RelocationPosition
* NewPosition '
.
.
..
..
..
;EPEE 3EEERY ZKEl%EEJREER
-
!
- Jammaury H, H@@@ - Nemme
i j Primary Objective: Achieve a S.A.L.P. -1 Rating i
- Enabling Objectives
- Completed to Date: .
'
* VisitedotherS.A.LP.-1 Sites
!
l * IncmasedPermanentStaffComplement .
! fremito 5 i
I i
'
* Relocatedtostate-of-the-artE. '
= SuccessfullyconductedSemi-Annual DrillandRemedialRe-EntryDrill
_ _ _
! . . .
j .
4 e e
EMERGENCYPREPAREDNESS l Major Upcoming Emergency Preparedness Issues
.
- * Siren Test
.
.
,
* Full scale exercise
,
j
* Local plan revisions i
.
.
- * Pending legislation to increase E. . - . .- - . - . _. _. j .
-
. . .
) e i EMERGENCYPREPAREDNESS
!
!
l Future Goals:
l l
!
l
* State-of-the-art Emergency Facilities, j Organization, Equipment, Procedures i and Plans
!
'
l * Continue to maintain a S.A.L.P. - 1 j Rating .
i
! -
i l
-
* FEMA 350 approval
.i O
!
i t
_ . _ _. _ - _ . . .
-
' ..
l
..
*
EMERGENCYPREPAREDNESS i
! * Conduct dress rehearsal of annual l exercise
!
J
* Conduct additional practice drills as re-i quired to ensure successful Exercise on 10/23 i
l * Conduct annual excercise 10/23
* Evaluate relocation of AEOF
* Medical Drill - Fa111986
! -
!
* Reorganizing / updating E. * Increasing Emergency Organizational Depth
.
'
* Evaluate EPZ Town Requests and facilitate procurement of required items
i
- - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - -- _ - _ - _ . . _ -
. .- o
,
,
..
i
'
- Enabling Ojectives in Process
- .
i .
. Assessment of all PNPS Emergency l Facilities
! -
i e Commissioned new Evacuation Time Estimated (E.T.E.) and comprehensive traffic management plan -
l
! * Generated action items and assigned re-sponsibilities as a result of Emergency Facility walk thrus
.
* Installation of teleconferencing system -
at all emergency facilities f * Conduct call out of assigned emergency l personnel l -
* Conduct FEMA siren test
.
_ _ _ _ _ _ _ . _ _ _ _ _ _
-
. . . .
l_ ..
*
i EMERGENCYPREPAREDNESS l
l = Developed and submitted Annual Exercise Objectives j
j * Conducted training /get acquainted sessions
! for approximately 100 local and state officials -
]
i I
* Reviewed and revised PNPS Emergency Plan, Procedures and Emergency Notification List l
* Conducted E.O.F., T.S.C., O.S.C., Media l Center and Recovery Center walk-thru ,
l drills
-* Represented company at local town meet-
! ings and State Senate Meeting i '
Reorganized PNPS Emergency Response
~
*
l i Organization. Initiated and completed the necessary corrective actions
,
,y -
- --
}}