ML20151C589
| ML20151C589 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 03/31/1988 |
| From: | Keimig R, Lancaster W, Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20151C583 | List: |
| References | |
| 50-293-87-30-MM, NUDOCS 8804130077 | |
| Download: ML20151C589 (2) | |
See also: IR 05000293/1987030
Text
mnIh!.23 BY ' !z: :, , ~
__ __
,
j&CkM/k-;L
"
- g.:,m
. x=. .
-
a
.
jVfC
@29 5
Y
-
]~b.n[n!.n:cy
PW
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report No. 50-293/C7-30
Docket No. 50-293
License No. OPR-35
Licensee:
Boston Edison Company
25 Braintree Hill Office Park
Braintree, Massacnusetts 02184
Facility Name:
Pilgrim Nuclear Power Station
Meeting At: N_RC Region I, King of Prussia, Pennsylvania
Meeting Date:
Sektemer 30, 1987
Prepared by:
M
3 3/ i k
N. K. Lancaster, Physical Security
I date
In'pecfor
>
w
3 3/ fi
"G. C. Smith, Safeguards Specialist
/ date
Approved by:
Aj/- ff
f.
Keihmn-tfT1
Safeguards Section,
date
Meeting Summary: A Management Meeting was held at the request of the Boston
Edison Company at NRC Region I, King of Prussia, Pennsylvania, on September 30,
1937, to follow-up on matters discussed at the September 9, 1987, Enforcement
Conference, the licensee's responses to the apparent violations identified in
Inspection Report No. 50-293/87-30, and programmatic security improvements.
The meeting was attended by NRC and licensee management and lasted
approximately two hours.
)
.
8804130077 880331
ADOCK 05000293
-
Q
.
-
.
--
.
.
_ _ . . .
._
__
.
-
-
.
s
.
.
Details
1.
Participants
A.
Boston Edison Company (BECo)
R. Bird, Senior Vice President, Nuclear
R. Ledgett, Executive Assistant to the Vice President, Nuclear
R. Grazio, Field Engineering Section Manager
C. Higgins, Security Section Manager
G. Edgar, Licensing Counsel
B.
Nuclear Regulatory Commission
T. Martin, Director, Division of Radiation Safety and Safeguards
S. Collins, Deputy Director, Division of Reactor Projects
J. Wiggins, Chief, Projects Section'1B
- ~ ~ ' '
A. Blough, Chief, Reactor Projects Section 3B
R. Bellamy, Chief, Emergency Preparedness and Radiological
Protection Branch
R. Keimig, Chief, Safeguards Section
G. Smith, Safeguards Specialist
W. Lancaster, Physical Security Inspector
2.
Discussion
Mr. Bird advised the NRC participants at the meeting that he had
requested the meeting to discuss BECo s response to the findings
i
contained in NRC Region I Inspection Report No. 50-293/87-30 that are
documented in BECO's September 26, 1987 letter to the NRC. Additionally,
he advised that his staff would clarify some information provided during
the Enforcement Conference on September 9, 1987 and discuss actions
undertaken to correct the security program at Pilgrim.
An outline of the topics discussed is contained in BECo's September 26,
1987 letter, which is Attachment 1 to this report.
In conclusion, Mr. Bird stated thet the licensee's sensitivity to
security program issues and program improvements has been significantly
heightened and that extensive corrective action programs and equipment
'
upgrades are underway.
{
Mr. Martin thanked the BECo representatives for their presentations and
stated that the NRC's decision with respect to the apparent violations
would be forthcoming.