Mgt Meeting Rept 50-293/87-30 on 870930.Major Areas Discussed:Followup of 870909 Enforcement Conference,Licensee Responses to Apparent Violations Identified in Insp Rept 50-293/87-30 & Programmatic Security Improvements
ML20151C589
Person / Time
Site: Pilgrim
Issue date: 03/31/1988
From: Keimig R, Lancaster W, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20151C583 List:
References
50-293-87-30-MM, NUDOCS 8804130077
Download: ML20151C589 (2)


See also: IR 05000293/1987030

Text

mnIh!.23 BY ' !z: :, , ~

__ __

,

j&CkM/k-;L

"

- g.:,m

. x=. .

-

a

.

jVfC

@29 5

Y

-

]~b.n[n!.n:cy

PW

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No. 50-293/C7-30

Docket No. 50-293

License No. OPR-35

Licensee:

Boston Edison Company

25 Braintree Hill Office Park

Braintree, Massacnusetts 02184

Facility Name:

Pilgrim Nuclear Power Station

Meeting At: N_RC Region I, King of Prussia, Pennsylvania

Meeting Date:

Sektemer 30, 1987

Prepared by:

M

3 3/ i k

N. K. Lancaster, Physical Security

I date

In'pecfor

>

w

3 3/ fi

"G. C. Smith, Safeguards Specialist

/ date

Approved by:

Aj/- ff

f.

Keihmn-tfT1

Safeguards Section,

date

Meeting Summary: A Management Meeting was held at the request of the Boston

Edison Company at NRC Region I, King of Prussia, Pennsylvania, on September 30,

1937, to follow-up on matters discussed at the September 9, 1987, Enforcement

Conference, the licensee's responses to the apparent violations identified in

Inspection Report No. 50-293/87-30, and programmatic security improvements.

The meeting was attended by NRC and licensee management and lasted

approximately two hours.

)

.

8804130077 880331

PDR

ADOCK 05000293

-

Q

DCD

.

-

.

--

.

.

_ _ . . .

._

__

.

-

-

.

s

.

.

Details

1.

Participants

A.

Boston Edison Company (BECo)

R. Bird, Senior Vice President, Nuclear

R. Ledgett, Executive Assistant to the Vice President, Nuclear

R. Grazio, Field Engineering Section Manager

C. Higgins, Security Section Manager

G. Edgar, Licensing Counsel

B.

Nuclear Regulatory Commission

T. Martin, Director, Division of Radiation Safety and Safeguards

S. Collins, Deputy Director, Division of Reactor Projects

J. Wiggins, Chief, Projects Section'1B

- ~ ~ ' '

A. Blough, Chief, Reactor Projects Section 3B

R. Bellamy, Chief, Emergency Preparedness and Radiological

Protection Branch

R. Keimig, Chief, Safeguards Section

G. Smith, Safeguards Specialist

W. Lancaster, Physical Security Inspector

2.

Discussion

Mr. Bird advised the NRC participants at the meeting that he had

requested the meeting to discuss BECo s response to the findings

i

contained in NRC Region I Inspection Report No. 50-293/87-30 that are

documented in BECO's September 26, 1987 letter to the NRC. Additionally,

he advised that his staff would clarify some information provided during

the Enforcement Conference on September 9, 1987 and discuss actions

undertaken to correct the security program at Pilgrim.

An outline of the topics discussed is contained in BECo's September 26,

1987 letter, which is Attachment 1 to this report.

In conclusion, Mr. Bird stated thet the licensee's sensitivity to

security program issues and program improvements has been significantly

heightened and that extensive corrective action programs and equipment

'

upgrades are underway.

{

Mr. Martin thanked the BECo representatives for their presentations and

stated that the NRC's decision with respect to the apparent violations

would be forthcoming.

l

--

-

. -

-

.

.

_

- -

--.