Text
ro
'
,
.
17 JUN 1987 Docket No'.<50-293-
!
Boston Edison Company M/C Nuclear ATTN: Mr. Ralph G. Bird Senior:Vice President - Nuclear-800 Boylston Street
.
i
' Boston, Massachusetts 02199-
.i h
J Gentlemeni
,
Subject: : Systematic Assessment of Licensee Performance (SALP).
Report No.~50-293/86-99 This letter refers. to the Systematic Assessment of Lionsee Performance (SALP)
of the -Pilgrim Nuclear Power Station for the period. November 1,1985 through January 31,1987;. initially forwarded ' to you - by our Acril:8,11987 letter-(Enclosure 1).
This SALP evaluation was _ discussed with you 'and your staff at a meeting held:in Chiltonville, Massachusetts on May'7, 1f87.- We have reviewed your May 22,1987i: written comments (Enclosure 2) and herewith transmit' the final = report (Enclosure 3).
Our assessment.of your past ' performance noted.some improvement, such as in the area of' emergency preparednessi however, significant recurring program weak--
,
'nesses were identified' in several functional areas.
Specifically, ' Category 3
!
ratings were assigned in the radiological controls, surveillance, fire protec-tion., security' and safeguards, and assurance of quality functional areas.
Ue
'
acknowledge that the Boston Edison Company (BECo) has' made' significant ' staffing -
and hardware commitments.to-improve performance in these areas as discussed in
!
-your May 22, 1987 SALP response and the responses to management meeting 50-293/-
186-41. While we believe your program improvement efforts are beginning to have
'
'
a positive effect, we plan.to maintain our increased attention to these areas, through efforts such as our periodic management meetings and increased inspec-tion resource allocation, to ensure that continued improvement is demonstrated.
In accordance 'with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
No reply to this letter is i
required.
.
!
8706290002 B70617' Y
~
{DR 'ADOCK 050 3'
g 0FFICIAL RECORD COPY 57 DOERFLEIN 6/11/87 - 0001.0.0 06/12/87 i
!
l
Boston Ed: son Company M/C Nuclear
17 JUN 1987 j
Your cooperation with us is appreciated.
Sincerely,
.
Original Signed By"~
WILLIAM T. BUSSELL William T. Russell Regional Administrator Enclosures:
1.
NRC Region I Letter, T. Murley to R. Bird, April 8,1987 2.
BECo Letter, R. Bird to NRC, May 22, 1987 3.
NRC Region I Systematic Assessment of Licensee Performance, Pilgrim Nuclear Power Station, Inspection Report 50-293/86-99 cc w/encis:
K. P. Roberts, Station Manager l
Paul Levy, Chairman, Department of Public Utilities
!
Chairman, Board of Selectmen
<
Plymouth Civil Defense Director
J. D. Keyes
'
The Honorable E. J. Markey Senator Edward P. Kirby l
The Honorable Peter V. Forman Sharon Pollard, Secretary of Energy Resources a
Public Document Room (POR)
I Local Public Document Room (LPDR)
Nuclear-Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Massachusetts (2)
Chairman Zech
Commissioner Roberts
'
Commissioner Asselstine Commissioner Bernthal Commissioner Carr
1 p
i i
!
0FFICIAL RECORD COPY 57 DOERFLEIN 6/11/87 - 0002.0.0 06/16/87 j
j l
]
m
,
i
,
s
-
s
<
'
l
'
o'
d
'
Boston Edison Company M/C' Nuclear.
2-
't 7 LJU N1987
'
,
'
7.,
Your. cooperation with usiis appreciated, l
'
-
,
- /
Sincerely,
.
]
,
I
'
William T. Russell Regional Administrat'or l
-
Enclosures:(
_
l
-
.1.:
NRC. Region I Letter, T. Murley.to R. Bird, April 8, 1987
!
- 2.
BECo Letter,'R. Bird to NRC, May 22, 1987
'
.
'
x3.
.NRC-Region.I Systematic Assessment of Licensee Performance, Pilgrim-l
'
Nuclear.' Power' Station, Inspection Report' 50-293/86-99
cc w/encls:
K. P ; Roberts, Station Man ~ager
.
Paul Levy, Chairman, Department of Public Utilities Chairman, Board of Selectmen ~
-Plymouth Civil. Defense Director
>
>
e
'J..D.
Keyes 1The Honorable E. J. Markey-
.
a-Senator Edward'P._Kirby-
.The Honorable Peter V. Forman
'Sharon Pollard, Secretary of. Energy Resources
.Public Document Room (PDR)
Local-~Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)-
.
~
NRC Resident' Inspector.
..
Commonwealth of Massachusetts (2)-
-bec w/encis:
m
. Region I Docket Room (with concurrences)
Section' Chief, DRP r
W; Raymond, SRI, Vermont Yankee T. Shedlosky, SRI, Millstone 1&2 H. Eichenholz, SRI, Yankee R. Wessman, PM, NRR JPA0 (2) SALP Reports Only obert J._ Bores, DRSS i
-
- DRP:
RI:DRP.
P-P RA RI:RA
'
- Doerflein/mjd iggins Collins A an Russell g
h87 6/ll'/87 :
6/ll/87 6/lk87 6/d/87 6/
6/ /87 0FFICIAL RECORD COPY 57 00ERFLEIN 6/11/87 - 0002.0.0 06/11/87
,
,
...
r:
-
!
!
l Boston Edison Company M/C Nuclear
17 JUN 887
!
i bec w/encis:
J.. Taylor, OEDRO l
W. Russell, RA
J. Allan, DRA l
D. Holody, ES Management Meeting Attendees W. Johnston, DRS
.
i T. Martin, DRSS Section Chief,'DRP
,
W. Raymond, SRI, //ermont Yankee
!
T. Shedlosky, SRI, Millstone 1&2 H. Eichenholz, SRI, Yankee l
R. Wessman, PM, NRR PA0 (2) SALP Reports Only R. J. Bores, DRSS
W. Oliveira, DRS
Wish List Coordinators - Ltr Only (2)
i Region I Docket Room (with concurrences)
l t
a i
l l
l l
W
- RI:DRP
- RI:DRP
- RI:DRP
- RI:DRP #RI:DRA RI:RA
!
Doerflein/mjd Wiggins Collins Kane Allan Russell
)
6/ /87 6/ /87 6/ /87 6/ /87 6/ /87 6/t/87 j
y
- See Previous Concurrences OFFICIAL RECORD COPY 57 DOERFLEIN 6/11/87 - 0003.0.0 06/16/87 l