ML20215B851

From kanterella
Jump to navigation Jump to search
Forwards Draft Rept Containing Results of Review of Allegation Mgt for Facility,For Comment.Comments Requested within 15 Days of Memo Date
ML20215B851
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 11/26/1985
From: Connelly S
NRC OFFICE OF INSPECTOR & AUDITOR (OIA)
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML082840462 List: ... further results
References
FOIA-86-197 NUDOCS 8610090197
Download: ML20215B851 (1)


Text

o',.-

UNITED STATES NUCLEAR REGULATORY COMMISSION l

wsHINGTON, C, C. 20085

\\...../

I November 26, 1985 i

i l

i MEMORANDUM FOR:

William J. Dircks l

Executive Director for Operations f-y FROM:

Sharon R. Connelly, Director #"

Office of Inspector and Auditor F

,f-

SUBJECT:

OIA REVIEW OF ALLEGATIONS MANAGEMENT FOR DIABLO CANYON t

Attached, for your use in preparing coments, are five copies of a draft DIA l

report containing the results of our review of Allegations Management for Diablo Canyon. Applicable sections of this report have previously been made l

available to both Region V and NRR. Because of this, we would appreciate receiving your coments within 15 days of the date of this memorandum.

If you have any substantive disagreements with the facts as presented, we are available to discuss them with you or your staff before you send us your t

formal response.

i Please note that this is a draft report which is subject to revision and is

)

being made available solely for the purpose of obtaining your review and coments. Please safeguard copies of the draft report to prevent its prema-ture publication or similar improper disclosunt of its contents.

Attachment:

As stated t

l 6

CONTACT: Harold Boulden, OIA I

49-24460 l-i

/

l J

01 G

kDR

{7860923 EDO --- 001221 HOLMES86-197 PDR l

7._..

h.

l I8 NOV 26198S r

L

)

Docket No. 50-275, 50-323 7 6 2

8G3f Pacific Gas and Electric Company 77 Beale Street, Room 1451 l

San Francisco, California M k h -53

)

Attention:

Mr. J. D. Shiffer, Vice President j

Nuclear Power Generation, Licensing Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units 1 and 2 This refers to the inspections conducted by Mr. J. F. Burdoin of this office i

during October 7-November 1, 1985, of activities authorized by NRC License Nos. DPR-80 and DPR-81, and to the discussion of our findings with Mr. R.

Thornberry, and other desbers of your staff on November 1,1985.

Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

No violations of NRC requirements were identified within the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to discuss them with you.

Sincerely, M/

D. F. Kirsch, Deputy Director Division of Reactor Safety and Projects

Enclosure:

Inspection Report Nos. 50-275/85-35, 50-323/85-33 cc w/ enclosure:

S. D. Skidmore, PGE R.C. Thornberry, PCE (Diablo Canyon)

P. A. Crane, Jr., PGE D. Taggart, PGE (Diablo Canyon)

N M 851126 R. Weinberg, PGE (Diablo Canyon)

$DR e.OCK 0500 5

State of Ca Sandra Silver bec:RSb/ Document Control Desk (RIDS)

Mr. Martin, Mr. Faulkenberry Resident Inspector

[

g Green, Pink, File, Document File f

I ff scf W

C s{

t

/

Qu/w p)r ig.jy njus/ts *

,\\

jg/

k