ML20197K136

From kanterella
Jump to navigation Jump to search
Forward Sser 32 Re Full Power Decision for Review.Comments & Concurrence Requested by 850731.Commission Meeting Scheduled on 850801.W/o Encl
ML20197K136
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 07/24/1985
From: Thompson H
Office of Nuclear Reactor Regulation
To: Knight J
Office of Nuclear Reactor Regulation
Shared Package
ML082840462 List: ... further results
References
FOIA-86-197 NUDOCS 8508080286
Download: ML20197K136 (3)


Text

I

~

v

~

i h 2 41985 Docket No.: 50-323 MEMORANDUM FOR:

J. P. Knight, Acting Director Division of Engineer R. M. Bernero, Director Division of Systems Integration W. T. Russell, Acting Director Division of Human Factors Safety T. P. Speis, Director Division of Safety Technology J. M. Taylor, Director Office of Inspection and Enforcement FROM:

H. L. Thompson, Jr., Director, Division of Licensing

SUBJECT:

SSER 32 FOR DIABLO CANYON 2 FULL POWER DECISION Enclosed is our SSER for your review /coments/ concurrence. The report is based on inputs from branches and on PG8E submittals as reviewed by the PM as indicated on the enclosed list. The Comission meeting is scheduled for Thursday Aua Hans Schieriing~ust land your coments should.be provided directly to by COB Wednesday Julys31st. Advance copies were provided to the reviewer on July 23rd.

(Udes t

!. i..

H. L. Thompson, Jr., Director l

Division of Licensing.

l Concurrence:

Date:

Sections:

l DISTRIBUTION l

SEE NEXT PAGE 1

n

/

LBf3/DL' L

I DL h

h HSchier'Hfg

(

hton[p L

Ampson 85

'l 074 /85 07/ gl5 j\\

07/pj/85

-07 j

i t

f 1

/

SECTION INPUT SOURCE i

1.

Introduction H. Schierling 2.

Summary and Conclusions H. Schierling 3.

Turbine Building P. T. Kuo/H. Polk 4.

Pipeway Structure P. T. Kuo/H. Polk 5.

Allegations M. Ley 6.

Industrial Security J. Gibson 7.

Emergency Preparedness D. Matthews 8.

Tech Specs H. Schierling C. Moon M. Dunenfeld T. Dunning F. A11enspach 9.

Small Break LOCA 10.1 System Interaction D. Wigginton F. Coffman*

10.2 R.G. 1.97 J. Joyce

  • 10.3 Masonry Walls N. Chokshi 10.4 GL 83-28 P. Karsch*

10.5 Equipment Qualification A. Lee

  • H. Walker
  • 10.6 Fire Protection D. Kubickf*

10.7 Plant Readiness 10.8 PASS Reg. V*

C. Nichols*

10.9 ICCIS T. Huang *

11. References H. Schierling
  • Section was prepared by H. Schierling, to be reviewed by individual listed.

e m

F

-I DISTRIBUTION w/o enclosure SSER 32 FOR DIABLO CANYON Docket File PRC System LBC/ Reading HSchierling' JLee DGEisenhut TNovak PTKuo HPolk Glear MLey JGibson t'

DCrutchfield CMoon DMatthews MDunenfeld DWigginton TDunning NChokshi LRubenstein THuang Alee HWalker DKubicki FAllenspach FCoffman JJoyce RKarsch LChandler DKirsch I

I I