ML20197K136
| ML20197K136 | |
| Person / Time | |
|---|---|
| Site: | 05000000, Diablo Canyon |
| Issue date: | 07/24/1985 |
| From: | Thompson H Office of Nuclear Reactor Regulation |
| To: | Knight J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML082840462 | List:
|
| References | |
| FOIA-86-197 NUDOCS 8508080286 | |
| Download: ML20197K136 (3) | |
Text
I
~
v
~
i h 2 41985 Docket No.: 50-323 MEMORANDUM FOR:
J. P. Knight, Acting Director Division of Engineer R. M. Bernero, Director Division of Systems Integration W. T. Russell, Acting Director Division of Human Factors Safety T. P. Speis, Director Division of Safety Technology J. M. Taylor, Director Office of Inspection and Enforcement FROM:
H. L. Thompson, Jr., Director, Division of Licensing
SUBJECT:
SSER 32 FOR DIABLO CANYON 2 FULL POWER DECISION Enclosed is our SSER for your review /coments/ concurrence. The report is based on inputs from branches and on PG8E submittals as reviewed by the PM as indicated on the enclosed list. The Comission meeting is scheduled for Thursday Aua Hans Schieriing~ust land your coments should.be provided directly to by COB Wednesday Julys31st. Advance copies were provided to the reviewer on July 23rd.
(Udes t
!. i..
H. L. Thompson, Jr., Director l
Division of Licensing.
l Concurrence:
Date:
Sections:
l DISTRIBUTION l
SEE NEXT PAGE 1
n
/
LBf3/DL' L
I DL h
h HSchier'Hfg
(
hton[p L
Ampson 85
'l 074 /85 07/ gl5 j\\
07/pj/85
-07 j
i t
f 1
/
SECTION INPUT SOURCE i
1.
Introduction H. Schierling 2.
Summary and Conclusions H. Schierling 3.
Turbine Building P. T. Kuo/H. Polk 4.
Pipeway Structure P. T. Kuo/H. Polk 5.
Allegations M. Ley 6.
Industrial Security J. Gibson 7.
Emergency Preparedness D. Matthews 8.
Tech Specs H. Schierling C. Moon M. Dunenfeld T. Dunning F. A11enspach 9.
Small Break LOCA 10.1 System Interaction D. Wigginton F. Coffman*
10.2 R.G. 1.97 J. Joyce
- 10.3 Masonry Walls N. Chokshi 10.4 GL 83-28 P. Karsch*
10.5 Equipment Qualification A. Lee
- H. Walker
- 10.6 Fire Protection D. Kubickf*
10.7 Plant Readiness 10.8 PASS Reg. V*
C. Nichols*
10.9 ICCIS T. Huang *
- 11. References H. Schierling
- Section was prepared by H. Schierling, to be reviewed by individual listed.
e m
F
-I DISTRIBUTION w/o enclosure SSER 32 FOR DIABLO CANYON Docket File PRC System LBC/ Reading HSchierling' JLee DGEisenhut TNovak PTKuo HPolk Glear MLey JGibson t'
DCrutchfield CMoon DMatthews MDunenfeld DWigginton TDunning NChokshi LRubenstein THuang Alee HWalker DKubicki FAllenspach FCoffman JJoyce RKarsch LChandler DKirsch I
I I