ML20197K243

From kanterella
Jump to navigation Jump to search
Forwards Sser 32 & Full Power License.Sser 32 Includes Encl List of License Conditions for Matters Provided or Reviewed by Recipients.W/O Sser 32 & License
ML20197K243
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 09/03/1985
From: Schierling H
Office of Nuclear Reactor Regulation
To: Kuo P, Ley M, Polk H
NRC
Shared Package
ML082840462 List: ... further results
References
FOIA-86-197 NUDOCS 8509060330
Download: ML20197K243 (3)


Text

- _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

r-fuer ug'o, UNITED STATES y

g NUCLEAR REGULATORY COMMISSION g

r E WASHINGTON, D. C. 20555

%,....../

Sgp 3 ISb Docket No.: 50-323 MEMORANDUM FOR: Those on Attached List FROM:

Hans Schierling, Project Manager Licensing Branch No. 3 Division of Licensing

SUBJECT:

DIABLO CANYON - SSER 32 AND UNIT 2 FULL-POWER LICENSE Enclosed for your information are the two subject documents. SSER 32 includes sections provided or reviewed by you, and the license includes license conditions for some of these matters (enclosed list).

kSal~

Hans Schierling, Pro ect Manager Licensing Branch No. 3 Division of Licensing Enclosu es:

As sta d cc W/0 closures:

T. Novak G. Knit ht i

L. Cha die Contac h. Schierling, NRR 27100 v

i l

Attached List P. T. Kuo H. Polk M. Ley J. Gibson D. Matthews C. Moon M. Dunnenfeld T. Dunning F. A11enspach D. Wigginton F. Coffman J. Joyce N. Chokshi R. Karsch A. Lee H. Walker D. Kubicki D. Kirsch C. Nichols T. Huang N. Thompson 1

l I

I Diablo Canyon List SSER 32 License Condition P. T. Kuo 3, 4 2.C.(10)

H. Polk 3, 4 2.C.(10)

M. Ley 5

J. Gibson 6

2.E

0. Matthews 7

2.C.(6)

C. Moon 8

2.C.(2)

M. Dunnenfeld 8.4 T. Dunning 8.5 F. A11enspach 8.6 D. Wigginton 9

F. Coffman 10.1 J. Joyce 10.2 N. Chokshi 10.3 2.C.(7)

R. Karsch 10.4 2.C.(8)

A. Lee 10.5 H. Walker 10.5 D. Kubicki 10.6 2.C.(4)

D. Kirsch 10.7 C. Nichols 10.8 T. Huang 10.9 N. Thompson 2.C(5)

.