i DLOP 228. Rev. 1 INITIAL NOSIGNIFICANTHhZARDSCONSIDERATIONDETERMINATION 7
ANDNOTICINGACTION Docket No.
50-275/323 Facility:
Diablo Canyon 1 & 2 Licensee:
Pacific Gas & Electric Co Date of application:
9/6/85 Request for: Tech Spec changes to implement relaxed axial offbet control for Unit 1 af ter 8000 MWD /MTU burnup in Cycle 1 (existing TS to be applicable to Unit 2 only)
LAR 85-09 (See attached notice or press release for more details.)
Initial Determination:
( X ) Proposed. determination _ - amendment request involves no significant hazards considerations (NSHC).
(
) Final determination - amendment request invo'lves significant hazards considerations (SHC).
Basis for Determination
(
) Licensee's NSHC discussion has,been reviewed and is accepted.
See attached amendment request.
( X) Basis for this determination is presented in the attached notice.
(
) Other (state):
l 859899 (Attach additional sheets as needed.)
Initial floticing Action:
(Attach appropriate notice or input for monthly FRN) 1.
( X) Monthly FRN. Notice of opportunity for hearing (30 days) and request for comments on proposed NSHC determination - monthly FRN input is attached (Attachment 8).
2.
(
) Individual FRN (30 days).
Same notice matter as above.
Time does not allow waiting for next monthly FRN (Attachments 9a and 9b).
(THIS FORM _SHOULD BE TYPED EXCEPT FOR UNUSUAL, URGENT CIRCUMSTANCES.)
05/4lr& XA (cyf3 u
i
. - page 2 1:
DLOP 228, Rev. I 3.
(
) local media notice. Valid exigent circumstances exist (evaluated below).
g Local media notice requesting pub.lic comments on proposed NSHC determination is attached (Atta'chment 10),
4.
(
) No notice. A valid emergency situation exists (evaluated below) and there is no time for public notice on proposed NSHC determination.
(No attachment.)
5.
(
) Individual FRN (30-days). Licensee's claim of exigent, or emergency I
circumstances is invalid (evaluated below). Notice of opportunity for hearing (30 days) and request for comments on proposed NSHC determina-tion is attached (Attachments 9a and 9b). Letter of explanation to licensee is also attached.
6.
(
) Individual FRN (30-days). The amendment request involves SHC. Notice l
of opportunity for prior hearing is attached (Attachment 5). Letter to licensee also attached.
- 7. -(
) Individual Short FRN. Valid emergency circumstances exist (evaluated below).
There is no time for the usual 3_0-day FRN.
(Attachment 16).
Evaluation of exigent or emergency. circumstances (if applicable):
(attach additional sheets as needed)
Approvals:
Date 1.
LS 2.
- ///
3.
d
[
(OELD)
[/
Additional approval (for noticing actions types 3, 4, 5, 6 and 7):
4.
(Assistant Ofrector)
Additional approval (for noticing action types 4 and 5):
5.
(Director, Division of Licensing)
Attachment:
as indicated Original - Docket File (with note " Docket File only")
cc:
Project Manager Licensing Assistant Branch Files
.L.-.
_ _ _