ML20197J706

From kanterella
Jump to navigation Jump to search
Requests Issuance of Encl Sser 31 Presenting Evaluation on Variety of Issues in Support of Encl Board Notification. Required Publications Release Form Also Encl for Signature. Rept Based on Input Provided by Review Branches.W/O Encls
ML20197J706
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 05/02/1985
From: Novak T
Office of Nuclear Reactor Regulation
To: Thompson H
Office of Nuclear Reactor Regulation
Shared Package
ML082840462 List: ... further results
References
FOIA-86-197 NUDOCS 8505160517
Download: ML20197J706 (4)


Text

.

DISTRIBUTION w/o enclosures Docket File 50-275 y

MAY Z 1985 PRC System LB#3 Reading MEM0 RANDOM FOR: Hugh L. Thompson, Jr., Director JLee Division of Licensing HSchierling Office of Nuclear Reactor Regulation FROM:

Thomas M. Novak, Assistant Director for Licensing Division of Licensing

SUBJECT:

DIABLO CANYON UNIT 2 - ISSilANCE OF SSER 31 Enclosed is Diablo Canyon SSER 31 presenting the staff evaluation nn a variety of issues in support of the Unit 2 low power license.

We request that the report be issued in accordance with the attached Board Notification. The required' publications release form is also enclosed for your signature.

The report is based on inputs provided by various review branches, sections prepared by the Project Manager and subsequently reviewed 'and commented on by reviewers, and extensive discussions between the Project Manager, reviewers and Branch Chiefs. Attached are Tables 1-1. and 1-2 of SSER 31 identifying the reviewers involved in the preparation of the report.

The report does not include any issue that requires further resolution prior to fuel load or low power operation. Tables 2-1 and 2-2 of the report identify the status of resolution of all items, including actions / modifications that must be completed prior to fuel load. The PG&E letter of April 25, 1985 on readiness for operations states that these are now completed or reaffirms the commitment that they will be completed as required.

t

/5 Thomas M. Novak, Assistant Director for Licensing Division of Licensing

Enclosures:

Proposed Board Notification for SSER 31 Publication Release Form Tables Identifying Reviewers for SSER 31 1

Contact:

H. Schierling, ONRR x27100 DL:LB#3

)B#3 DL:L d3 HSchierl nd/yt GWKnAghton TMNovak i

i 4$/85 4

85 4g/ /85 4/p 85 g-s Wb57W6I Aff

e, cf 4n UNITED STATES 64/

j NUCLEAR REGULATORY COMMISSION

.g WASHINGTON, D. C. 20555

\\...../

MAY 2lb MEMORANDUM FOR: Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation FROM:

Thomas M. Novak, Assistant Director

~

for Licensing Division of Licensing

SUBJECT:

DIABLO CANYON UNIT 2 - ISSUANCE OF SSER 31 Enclosed is Diablo Canyon SSER 31 presenting the staff evaluation on a variety of issues in support of the Unit 2 low power license. We request that the report be issued in accordance with the attached Board Notification. The required publications release form is also enclosed for your signature.

The report is based on inputs provided by various review branches, sections prepared by the Project Manager and subsequently reviewed and commented on by reviewers, and extensive discussions between the Project Manager, reviewers and Branch Chiefs. Attached are Tables 1-1 and 1-2 of SSER 31 identifying the reviewers involved in the preparation of the report.

The report does not include any issue that reouires further resolution prior to fuel load or low power operation. Tables 2-1 and 2-2 of the report identify the status of resolution of all items, including actions / modifications that must be completed prior to fuel load. Tha PG&E letter of April 25, 1985 on readiness for operations states that these are now completed or reaffirms

~

the commitment that they will be completed as required.

S Thomas M. Novak, Assistant Director for Licensing Division of Licensing

Enclosures:

Proposed Board Notification for SSER 31 Publication Release Form Tables identifying Reviewers for SSER 31

Contact:

H. Schierling, ONRR x27100 b

e o

,-y

,, - _ - _, ~ _ __,-

t 4

Table 1-1

~

Specific Items Addressed in SSER 31 1.

Overhead Heavy Load Handling System A. fiaSAb 2.

Seismically Induced Systems Interaction Program F. (o((wcr(R R A 6) 3.

Seismic Design Bases Reevaluation Program

$ Bro c cu m (GS6 )

4.

Testing and Training *

k. 8ecker (PSR 8) 5.

Regulatory Guide 1.97 J. }oyce (IC 58) 6.

Steam Generator Tube Plugging M. (04 rad [ NI6 d)

[_

7.

Masonry Walls

//. 6 4 o h J Ei ( ffr E 8) 8.

Salem ATWS Event (GL 83-28)

T. A (4yton ( 0 R A 8) 9.

Equipment Qualification

6. kc Ilter, A. Le e ( E G G 10.

Fire Protection - Appendix R d.kubicki(CHE6) 11.

Plant Staffing *

[, Crocicer (E G 8) 12.

Emergency Preparedness b kch[or ( E P 6) 13.

MSLB Outside Containment P. NeGru (d58) 14.

Steam Generator Tube Rupture Analysis

$. hb (R$8) 15.

Inservice Testing of Pumps and Valves R. fGrItvuod (ME 6) 16.

Inservice Inspection Program R. Num (NTE.8) 17.

NUREG-0737 Items

  • T~cdle l-2 18.

Industrial Security J.(r;b5an(55P8) 19.

Containment Leakage Test Program - Exemption

d. h vorl[. (,E H E B) 20.

Preoperational/ Acceptance Tests

k. kdd5 (21) 21.

PG&E Startup Open Items List R 90dd5 (.05)

"See also Table 1-2.

Diablo Canyon SSER 31 1-3 r-

e 4

Table 1-2 NUREG-0737 Items Addressed in SSER 31 C, racker [lQ&)

I. A. l.1 Shift Technical Advisor

1. A.1. 3 Shift Manning

~

I.B.1 Shift Advisor - Management of Operations I.C.6 Verification of Operating Activities F. AIIcaspr.d (L et3)

I. D.1 Control Room Design Review N. T4cmgrow (#FES)

I.D.2 Safety Parameter Display System

]. ]o yce (TOS), L.8,//rucLi ( H FE B )

I.G.1 Training During Low Power Testing

& Occker (PSR 8)

II.B.2 Plant Shielding R.$nk(k40)

II.B.3 Post Accident Sampling System C. Nichols (NTES) 11.D.1 Performance Testing of Relief and Safety Valves k.Dda'e(ES8),b. M it(

II.E.4.2 Containment Isolation Dependability R W;gk/- (EGB) f, [j va ng (C E E>)

II.F.2 Inadequate Core Cooling Instrumentation System II.K.2.13 Thermal Mechanical Aspects of Reactor Vessel S..Dic.b (R$(3)

II.K.3.30 Small-Break LOCA (Westinghouse Generic)

N. ladjn (250)

II.K.3.31 Small-Break LOCA (Diablo Canyon)

III.A.1.2 Upgrade of Emergency Support Facilities F. kculor (E PG)

III.A.2 Improving Licensee Emergency Preparedness - Long Term W

Diablo Canyon SSER 31 11