ML20198A225

From kanterella
Jump to navigation Jump to search

Requests Review of Util Rept Re Reracking of Spent Fuel Pools for Facilities.Input for Safety Evaluation Should Be Provided by 860331 in Accordance W/Encl Proposed SER Outline
ML20198A225
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 10/03/1985
From: Schierling H
Office of Nuclear Reactor Regulation
To: Berlinger C, Lear G, Parr O
Office of Nuclear Reactor Regulation
Shared Package
ML082840462 List: ... further results
References
FOIA-86-197 TAC-59756, TAC-59757, NUDOCS 8510150414
Download: ML20198A225 (3)


Text

kR Ef 4

\\o't UNITED STATES NUCLEAR REGULATORY COMMISSION h

<E WASHINGTON, D. C. 20555

  • s

%,,,,, **'g DCT 3 ggg5 Docket Nos.: 50-275/323 MEMORANDUM FOR: Attached List l

FROM:

Hans Schierling, Project Manager, Licensing Branch No. 3, DL

SUBJECT:

DIABLO CANYON - RERACKING 0F SPENT FUEL P0OLS Enclosed is a request for your review (Routing Slip) of the PG&E report on the reracking of the spent fuel pools for Diablo Canyon Units 1 and 2.

Also enclosed is a TAC fom for each unit (No. 59756 for Unit 1, No. 59757 for Unit 2). Two copies of the report were provided to you earlier through nomal distribution.

A license amendment request (LAR) will be submitted by PG8E in the near future.

Unit I went comercial in May 1985 and PG&E has stated that the first refueling could be as early as July 1986. PG&E would like to complete the rerack modifications in a dry, non-contaminated pool. We request that you review the report and provide your input for the safety evaluation by March 31, 1986, in accordance with the attached proposed SER outline.

Please infom me who in your branch will be the reviewer for this effort. We intend to have a meeting with PG&E in early November to provioe them with our initial comments and identify needs for further information. We expect that written requests for information and other interactions with PG&E will be required to complete our review by March 31, 1986.

I M

N Hans Schierling, Proj t Manager ~

Licensing Branch No. 3 Division of Licensing l

Enclosures:

i 1.

Routing Slip 2.

TAC Forms 3.

PG&E Letter DCL 85-306 cc w/o enclosures 1 & 2:

H. L. Thompson, Jr.

W. V. Johnston J. P. Knight R. W. Houston R. M. Bernero L. S. Rubenstein T. M. Novak D. R. Muller R. J. Bosnak G. W. Knighton L. Chandler

Contact:

H. Schierling, NRR 0l

\\']

'jC/$15l%"/

Xh (8f$

r s

o Attached List:

Carl Berlinger, Chief, CPB, DSI (107 3 1985 Olan Parr, Chief, ASB, DSI George E. Lear, Chief, SGEB, DE Victor Benaroya, Chief, CHEB, DE William Gammill, Chief, METB, DSI Frank Congel, Chief, RAB, DSI Ronald L. Ballard, Chief. EHEB, DE.

Lewis G. Hulman, Chief, AEB, DSI 0

f~

s o

DIABLO CANYON REVIEW 0F PG8E REPORT ON RERACKING PROPOSED SER OUTLINE 1.0 Introduction PM 2.0 Summary pM 3.0 Criticality Considerations CPB 4.0 Materials CHEB 5.0 ' Structural Design SGEB 6.0 Radiological Consequences of accidents AEB Involving Postulated Mechanical Damage to Fuel 7.0 Occupational Radiation Exposure RAB 8.0 Spent Fuel Pool Cooling and ASB Makeup System 9.0 Radioactive Waste METB, EHEB 10.0 Conclusions PM 11.0 References PM l

l l

9

,