'o UNITED STATES g
4 8
NUCLEAR REGULATORY COMMISSION o
{
WASHINGTON, D. C. 20555 Ig....+/
JUL 3 01985 Docket No.: 50-323 MEMORANDUM FOR:
Harold R. Denton, Director Office of Nuclear Reactor Regulation Darrell G. Eisenhut Deputy Director Office of Nuclear Reactor Regulation Robert Bernero, Director Division of Systems Integration James P. Knight, Acting Director-Division of Engineering William T. Russell, Acting Director
_ Division of Human Factors Safety Themis Speis, Director Division of Safety Technology Hugh L. Thompson, Director Division of Licensing Edward S. Christenbury, Director and Chief Counsel Hearing Counsel Office of the Executive Legal Director FROM:
Thomas M. Novak, Assistant Director for Licensing l
Division of Licensing
SUBJECT:
DIABLO CANYON UNIT 2 FULL-POWER BRIEFING The Commission meeting to discuss full-power authorization for Diablo Canyon Unit 2 is scheduled to be held at 10:00 a.m. on August 1,1985.
Enclosed for your information is a copy of the briefing package that has been sent to the Comission. Background supplemental information is being provided in the enclosure for your information, also.
b r'~ - -._
Thomas M. Novak, Assistant Director for Licensing (pg ggyf g
Division of Licensing
Enclosure:
/j
/,
4/
b Briefing Book for Diablo Canyon 2
!('
A UNITED STATES g
NUCLEAR REGULATORY COMMISSION 4
'j WASHINGTON, D. C. 20555 1.,...../
JUL 231985 Docket No.: 50-323 MEMORANDUM FOR: Chaiman Palladino Comissioner Roberts Comissioner Asselstine Comissioner Bernthal Comissioner Zech FROM:
William J. Dircks Executive Director for Operations
SUBJECT:
DIABLO CANYON UNIT 2 FULL-POWER BRIEFING
_ Consideration of full-power licensing of Diablo Canyon Unit 2 is presently scheduled for July 30, 1985. The staff briefed the Comission on April 23, 1985 regarding the issuance of the Diablo Canyon Unit 2 low-power license.
Provided for your use is a copy of the Diablo Canyon Unit 2 briefing package, which includes:
1.
Briefing slides for full-power briefing k-2.
Low-Power License DPR-81 3.
Proposed Full-Power License 4.
Operating experience during the period of the Low-Power License The staff is preparing a safety evaluation in support of Unit 2 full-power operation which will be provided to you.
i William J. Dircks j
Executive Director for Operations
Enclosures:
As stated cc: SECY OPE OGC CONTACT:
H. Schierling, NRR X-27100 gg }
1 > > m m h
\\
goP! Y W' LTf)'
w
~
COMMISSION BRIEFING FULL-POWER LICENSE DIABLUCANYONUNIT2 PACIFIC GAS 8 ELECTRIC COMPANY JULY 30, 1985 DIABLO CANYON 2
N BRIEFING OUTLINE DIABLO PLANT STATUS TECHNICAL SPECIFICATIONS OPERATIONAL READINESS O
~
ALLEGATIONS / INVESTIGATION CONCLUSIONS DIABLO CANYON 2 SLIDE 1 r
m -
m
---r-p, y
-y
.---p
---3
STATUS UNIT 2:
COMMISSION BRIEFING ON LOW POWER LICENSE: APRIL 23, 1985 LOW POWER LICENSE ISSUED:
APRIL 26, 1985 FUEL LOAD COMPLETE:
MAY 15, 1985 UNIT 1:
DECLARED COMMERCIAL AT 100% POWER: MAY 7, 1985 AVAILABILITY:
97%
{
CAPACITY:
91%
EMERGENCY PREPAREDNESS FEMA LETTER DATED JULY 11, 1984 LAST EXERCISE OCTOBER 30, 1984 l
NRC vs GUARD l
l l
DIABLO CANYON 2 SLIDE 2
TECHNICAL SPECIFICATIONS AND STAFFING COMBINED / COMMON TECH SPECS FOR UNIT 1 AND UNIT 2 TO BE ISSUED WITH UNIT 2 FULL-POWER LICENSE, PROPOSED CHANGES TO UNIT 1 TECH SPECS NOTICED IN FEDERAL REGISTER
-m y
DIFFERENT SPECIFICATIONS, DUE TO DESIGN AND OPERATIONAL
(~
DIFFERENCES BETWEEN UNITS, ARE IDENTIFIED, ALL SENIOR OPERATORS AND REACTOR OPERATORS, EXCEPT TWO, LICENSED ON BOTH UNITS DIABLO CANYON SLIDE 3 e
r,,,,,--,-,-,c,
,a
OPERATIONAL READINESS
~
INSPECTION PROGRAM NO SIGNIFICANT PROBLEMS WERE IDENTIFIED, HOWEVER A NEED FOR MORE ATTENTION TO DETAll WAS NOTED DURING FUEL LOAD OPERATIONS SYSTEM TURNOVER ALL SYSTEMS REQUIRED FOR PLANT OPERATION HAVE BEEN TURNE'D OVER AND ACCEPTED BY NUCLEAR POWER OPERATIONS DEPARTMENT
(-
PLANT OPERATING EXPERIENCE DIABLO CANYON 2 SLIDE 4
I o ALLEGATIONS / INVESTIGATIONS ALLEGATION STATUS PETITIONS PURSUANT TO 10 CFR 2.206 9
e l
DIABLO CANYON 2 SLIDE 5
-