Informs That Level of Effort & Proposed Schedule Discussed in Re Contract NRC-03-81-130,Final Work Assignment 26, Evaluation of Spent Fuel Racks Structural Analysis, Acceptable
ML20215B801
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 10/31/1985
From: Carrington M
Office of Nuclear Reactor Regulation
To: Pandey S
CALSPAN CORP.
Shared Package
ML082840462 List: ... further results
References
CON-NRC-03-81-130, CON-NRC-3-81-130, FOIA-86-197 NUDOCS 8610090101
Download: ML20215B801 (1)


Text

.

't II FIN B-6891 Dr. S. Pandey Franklin Research Center Division W

.i ARVIN/CALSPAN k

20th and Race Stregts Philadelphia, Fennsylvania 19103

Dear Dr. Pandey:

SUBJECT:

CONTRACT NRC-03-81-130, FINAL WORK ASSIGtHENT NO. 26, EVALUATION OF SPENT FUEL RACKS STRUCTURAL ANALYSIS Your letter of October 16, 1985, pr5vided a proposed level of effort estimate for evaluation of the licensee submittal concerning spent fuel rack modifications for Diablo Canyon Units 1 and 2.

The level of effort and the schedule proposed in your letter has been reviewed and found acceptable. Since this evaluation was not authorized by October 18, the submission date for the RAI is changed to December 2, 1985.

You are authorized to begin work immediately on this evaluation. The NRC Approved Estimate for this assignment is increased to $292,914.

This estimate does not include award fee.

Sincerely, s/

Mayo Carrington Technical Assistance Program Management Group DISTRIBUTION f4RR Project File (PPAS)

HS ling TAPMG Reading Knighton MCarrington J

MWilliams PEdgworth SBKim DCrutchfield PTKuo Glear I

DE:SGEB DL:LB3 0

/

SBKimfgR HSchier' g

ton 10/23 /85 10/D/85 10/g3/

k DL:SGEB[F DC:TCB DC:TCB O

D

'. N U DL:TAPMG D

.G DE:SG MCarrington M i iams PTKuo Glear JField PEdgeworth DC cntield 10/ 2 s /85 10/1 /85 10/3P/8'5 10/37,/85 10/of /85 10/3g/85 10/ff /85 1

8610090101 860923 PDR FOIA HOLMES86-197 PDR i

s u-9 I

October 23, 1985 Docket No. 50-275 Pacific Gas and Electric Company 77 Beale Street Room 1451 San Francisca California 94106 Attention:

Mr. J. D. Shiffer, Vice President Nuclear Power Generation, Licensing Gentleten:

9 This letter will acknowledge receipt of your August 30, 1985 letter to Mr. John B. Martin that transmitted the scenario manual for the 1985 Diablo Canyon Power Plant Emergency Preparedness Exercise to be held October 30, 1985.

On September 11 Mr. K. Prendergast of my staf f contacted Mr. Brian Gif fin and discussed with him and other members of your staff some improvements to the scenario.

Mr. Giffin also clarified a number of issues from our review.-

A conference call was held on October 22, 1985, and at the conclusion of this call, it appeared that all of the NRC comments on the scenario had been adequately addressed by the licensee. It is our understanding that the minor changes suggested, along with any other changes made between now and the date of the exercise, will be provided to the NRC team members prior to the exercise. In addition, during a recent contact, FEMA Region IX indicated that they were satisfied with the scenario.

It is our conclusion that the scenario package with the minor agreed to changes is adequate to permit you to meet the exercise objectives contained in your July 26, 1985 submittal.

Sincerely, N 951023 PDR ADOCK 05000275 i

F pm R. F. Fish, Chief j

Emergency Preparedness Section cc:

R. Thornberry, PG&E, Diablo Canyon.

L'. Fujimoto, PG&E B. Giffin, PG&E S. Elkins', FEMA, RIX l

bcc: RSB/ Document Control Desk (RIDS) b S te pf CA; Resident inspector RVPIe

'E Fish N -

[h3 er 10/23/8 10/23/85