ML20215B758

From kanterella
Jump to navigation Jump to search
Informs That Immediate Effectiveness Rule No Longer Necessary,In Light of Appeal Board 850627 Decision Upholding Adequacy of Facility.No Further Action on Matter Planned Unless Otherwise Instructed by Commission
ML20215B758
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 07/23/1985
From: Zerbe J
NRC OFFICE OF POLICY EVALUATIONS (OPE)
To: Asselstine, Palladino, Roberts
NRC COMMISSION (OCM)
Shared Package
ML082840462 List: ... further results
References
FOIA-86-197 NUDOCS 8610090013
Download: ML20215B758 (1)


Text

r

1..L

/

/

UNITED STATES i- -

h NUCLEAR REGULATORY COMMISSION fl l,

[

aj s.\\ 7 O T /,

)

WASHINGTON, D. C. 20555 w.,.,,

g c

))".',L_

C-July 23, 1985

~ A.... lu..

MEMORANDUM FOR:

Chairman Palladino M"

Comissioner Roberts

/+/

,, r 0'

Comissioner Asselstine Comissioner Bernthal

(/

C si e Zech

.t f

f FROM:

Joh E.

e, rector

/]'.

l/

ice Policy Evaluation d

f

SUBJECT:

IMMEDIATE EFFECTIVENESS REVIEW FOR DIABLO CANYON UNIT 2 On June 27, 1985, the Appeal Board affirmed the Licensing Board's decision ff and upheld the adequacy of the design of Diablo Canyon, Unit 2.

Therefore, an Inunediate Effectiveness Review is no longer necessary. The only remaining

'(question is whether the Comission wishes to delay effectiveness pending its review of the Appeal Board's decision.

In the meantime, no further hearings are necessary and we see no technical reasons in the Appeal Board's decision which appears to warrant a stay in issuing a full power license for Diablo Canyon, Unit 2.

A final supplemental SER will be issued by the staff covering any remaining allegations. Any other issues which could have a bearing on the Comission's decision on issuing a license would be discussed with the staff and OI in their briefings before the Comission on July 30, l

1985. Unless otherwise instructed by the Comission, OPE plans no further action on this matter.

cc:

H. Plaine, GC S. Chilk, SECY W.Dircks,ED0/

l l

l l

CONTACTS:

Roxanne Goldsmith, OPE John Larkins, OPE x-43295 8610090013 860923 PDR FOIA

\\

HOLMES86-197 PDR

r JUL 2 31985 Docket No.: 50-323 MEMORANDUM FOR: Chairman Palladino Commissioner Roberts Commissioner Asselstine Comissioner Bernthal Commissioner Zech FROM:

William J. Dircks Executive Director for Operations

SUBJECT:

DIABLO CANYON UNIT 2 FULL-POWER BRIEFING Consideration of full-power licensing of Diablo Canyon Unit 2 is presently scheduled for July 30, 1985.

1985 regarding the issuance of the Diablo Canyon Unit 2 low-pow Provided for your use is a copy of the'Diablo Canyon Unit 2 briefing pac which includes:

1.

Briefing slides for full-power briefing 2.

Low-Power License DPR-81

3.. Proposed Full-Power License 4

Operating experience during the period of the Low-Power License The staff is preparing a safety evaluation in support of Unit 2 full-power operation which will be provided to you.

C;..::HT.:!:a:.J. D:r:ks.

William J. Dircks Executive Director for Operations

Enclosures:

As stated cc: SECY OPE OGC CONTACT:

H. Schierling, NRR X-27100 DISTRIBUTION Docket File TRehm NRC PDR HDenton

/

local PDR DEisenhut f

EDO Reading HThompson

  • Previously concurred:

ORB #3 Reading JHeltemes, AE00 e,,

c NRR 654;U p,>

g HSchierling JMartin, Reg. V i

{jr h'

JLee

  • HDenton WDircks /

\\\\

7/22/85 7/Q/85 LB#3:DL LB#3:DL)k LB#3:DL AD/L:DL D:DL NRR

  • JLee
  • HSchierling: h *GKnighton *TNovak

-HThompson DEisenhut 7/16 85 9 G(o-1 )b ;?f5]7/16/85rlfb 7/17/85 7/19/85 7/19/85 7/ /85

(

v v yV y

  • T