Forwards Rev 0 to FNP-1-M-042, Second 10-Yr Pump & Valve Inservice Testing Program, Per 10CFR50.55(g)(4) & (5). Updated Program Meets Requirements of ASME Code,Section XI, 1983 Edition Through Summer 1983 Addenda.Fee Paid
ML20214P429
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/27/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20214P432 List:
References
NUDOCS 8706030377
Download: ML20214P429 (2)


Text

. .

At tnm2 Fower Company 600 North 18th Street Post Office Box 1641 flirmingham, Alacama 352914400 Telephone 205 2501035 L

Le"ffle"O,.een, M*****

Docket No. 50-348 ""'*"*"'SS*'"

10CFR50.55a(g)

May 27, 1987 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

Joseph M. Farley Nuclear Plant - Unit 1 Second Ten Year Interval Inservice Testing Program for ASME Code Class 1, 2 and 3 Pumps and Valves Pursuant to the requirements of 10CFR50.55a(g)(4) and (5), enclosed is the Joseph M. Farley Nuclear Plant Unit 1 Inservice Testing Program for the Second Ten Year Interval of plant operation. To the extent practical within the limitations of design, geometry and materials of construction of the components, this updated program meets the requirements of the ASME Code,Section XI,1983 Edition through the Summer 1983 Addenda, which is the latest NRC approved Code edition and addenda as of December 1, 1986.

The enclosed program includes tables which if st the pumps and valves considered to be within the scope of the Inservice Testing Program. These tables are subdivided into two categories: ASME scope and augmented scope.

The ASME scope section contains those pumps or valves which are required to be designed and tested in accordance with the ASME Code and they will be tested in accordance with Section XI as described in the updated program.

The augmented scope section contains those pumps and valves which either were not required to be designed and/or tested in accordance with the ASME Code or w ere optionally designed to meet the ASME Code requirements. In either case, these pumps and valves were determined to perform a function which is important to either the safety or reliability of the plant and have been included in the updated program. In addition, Inservice Inspection Boundary Diagrams, which have been developed to show the required pump and valve tests, are included and reflect these requirements.

. s 8706030377 070027 PDR ADOCK 05000348 p PDR k Q <&cife M /50.oo

s ,

e.  !

1 I

U. S. Nuclear. Regulatory Coinnission May 27, 1987 Page 2 m ,

', Where certain ASME Code requirements have been determined to be impractical, relief requests and/or cold shutdown justifications have been prepared which susanarize the system, component number, valve category (where applicable),

, ASME Code Class, function, test requirement, basis for relief and proposed alternative testing (where appropriate).~ General reliefs are included in

', paragraphs I.3 and 1.4 of the Introduction. When required, specific relief requests and/or. cold shutdown justifications for individual pumps and valves t
'are included behind each of the tables. The specific reliefs are reference.d in the tables and diagrams where appropriate.

{

The current Inservice Testing Program for Unit 1 contains reliefs which have. '

i previously been granted by the NRC. These reliefs will expire on December 1, 1987, concurrent with placement of the Second Ten Year Interval Inservice

. Testing Program into effect. Therefore, pursuant to the requirements of i 10CFR50.55a(g)(6)(1), Alabama Power Company requests that the NRC grant relief from the ASME Code requirements as defined in the general and specific

j. relief requests submitted with the enclosed program. It is requested that -

j these reliefs be granted by December 1, 1987.

Pursuant to 10CFR170.21, the required application fee' of $150.00 is enclosed. If there are any questions, please advise.

j- . Respectfully submitted, t e

' ALABAMA POWER COMPAMY

()

t R. P. Mcdonald

  • i RPM / STB:cs1-1. .

Enclosures l cc: Mr. L. B. Long, w/o enclosure 3

Dr. J. N. Grace, w/1 enclosure

! Mr. E. A. Reeves, w/1 enclosure j J Mr. W. H. Bradford, w/o enclosure i