MONTHYEARML20206N0911988-11-18018 November 1988 Notice of Deviation from Insp on 880926-30.Deviations Noted: Two Penetration Seals Found in Auxiliary Boiler Room Were Not 3-h Rated & Documentation Not Developed to Substantiate Portable Fans ML20155F4681988-10-0505 October 1988 Notice of Deviation from Insp on 880912-16.Deviations Noted: Lack of Documented Evidence to Show That Fluorescent Penetrant Insp Performed on Helium Circulator ML20154E4261988-09-0808 September 1988 Notice of Deviation from Insp on 880711-0805.Deviation Noted:Failure to Obtain Chemical & Mechanical Certified Mill Test Repts & Heat Treat Furnace Charts for Helium Circulator Part C2101-300-95 Spring Plungers ML20154C3261988-09-0202 September 1988 Notice of Deviation from Insp on 880725-0805.Deviation Noted:Licensee,In Oct 1986,indefinitely Postponed Const of New Records Storage Facility & Failed to Inform NRC of Change in Commitment ML20150C2421988-07-0606 July 1988 Notice of Deviation from Insp on 880501-31.Deviation Noted: on 880518 & 19,reactor Pressure Greater than 100 Psig,Helium Purge Flow Indicated to Subheaders on Flow Instruments Reading 0 or Below & Flow to CRD Penetration 0 or Below ML20236N6541987-11-12012 November 1987 Notice of Deviation from Insp on 871007-08.Deviation Noted: Failure to Staff Forward Command Post within Time Commitments ML20214E8761986-11-20020 November 1986 Notice of Deviation from Insp on 861027-31 ML20198D2021986-05-19019 May 1986 Notice of Deviation from Insp on 860303-07 IR 05000528/20060281985-08-13013 August 1985 Notice of Deviation from Insp on 850528-0628 ML20132D5561985-07-17017 July 1985 Notice of Deviation from Insp Completed on 850705. Deviation Noted:Automatic Closure of One Emergency Diesel Generator Breaker Dependent on Operation of Components Associated W/Other Emergency Diesel Generator ML19309B4261980-02-15015 February 1980 Notice of Deviation from Insp on 791231-800131 1988-09-08
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000267/19970011997-04-0707 April 1997 Insp Rept 50-267/97-01 on 970310-11.No Violations Noted. Major Areas Inspected:Reviews of Status of Radiation Protection,Environ Monitoring & Radwaste Mgt Programs IR 05000267/19960051996-12-23023 December 1996 Insp Rept 50-267/96-05 on 961203-05.No Violations Noted. Major Areas Inspected:Access Licensees Implementation of Radiation Protection Program & Decommissioning Plan & Included Reviews of Status of Radiation Protection IR 05000267/19940031996-04-0202 April 1996 Revised NOV from Insp Rept 50-267/94-03.Violation Noted: Contractor to Licensee Submitted Inaccurate Radiation Surveys ML20136B3051996-04-0202 April 1996 Revised NOV from Insp Rept 50-267/94-03.Violation Noted: Numerous Required Records of Radiation Surveys Were Created Which Were Not Complete & Accurate ML20137H1731995-08-17017 August 1995 Investigation Rept 4-95-015.Noncompliance Noted.Major Areas Investigated:Alleged Deliberate Failure of Contract Employee to Perform Daily Response Checks on Portable Contamination Monitor ML20137K0551995-05-26026 May 1995 Investigation Rept 4-94-010 on 950526.No Noncompliance Noted.Major Areas Investigated:Allegations Re Falsification of Radiation Survey Records ML0823207651995-01-0505 January 1995 Suppl 3 to NRC Info Notice 86-108, Degradation of RCS Pressure Boundary Resulting from Boric Acid Corrosion ML20058P5931993-10-12012 October 1993 EN-93-101:on 931012,notice of Proposed Imposition of Civil Penalty in Amount of $80,000 Issued to Licensee.Action Discussed in SECY-93-263 & Approved by Commission on 931007 PNO-IV-93-008A, on 930304,truck Shipment Enroute from Plant to Richland,Wa Involved in Accident in Or.No Personnel Injuries Resulted.Shipping Cask Dislodged or Damaged.Repairs Made Enabling Truck to Complete Transport to Wa1993-03-0505 March 1993 PNO-IV-93-008A:on 930304,truck Shipment Enroute from Plant to Richland,Wa Involved in Accident in Or.No Personnel Injuries Resulted.Shipping Cask Dislodged or Damaged.Repairs Made Enabling Truck to Complete Transport to Wa PNO-IV-93-008, on 930304,truck Shipment of Low Level Waste Enroute to Richland,Wa from Plant Left Highway & Impacted Guard Rail.Caused by Ice on Highway.Second Rig Also Impacted Truck.Trailer Damaged.State Authorities Notified1993-03-0404 March 1993 PNO-IV-93-008:on 930304,truck Shipment of Low Level Waste Enroute to Richland,Wa from Plant Left Highway & Impacted Guard Rail.Caused by Ice on Highway.Second Rig Also Impacted Truck.Trailer Damaged.State Authorities Notified IR 05000267/19910021991-03-0707 March 1991 Insp Rept 50-267/91-02 on 910204-08.No Violations or Deviations Noted.Major Areas Inspected:Activities Re Transportation of Radioactive Matl & Radiological Controls in Preparation for Drilling & Cutting of Control Rods IR 05000267/19900171990-11-29029 November 1990 Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety, Monthly Surveillance & Maint Observation ML20062H8191990-11-29029 November 1990 Notice of Violation from Insp on 901022-26.Violation Noted: Test of Protected Area Intrusion Detection Zones Defeated by Testing Personnel Jumping Over Zone IR 05000267/19900181990-11-20020 November 1990 Partially Withheld Insp Rept 50-267/90-18 on 901022-26. Violation Noted.Major Areas Inspected:Physical Security Program,Including Protected & Vital Area Barriers,Detection & Assessment Aidscommunications,Testing,Packages & Maint IR 05000267/19900191990-11-16016 November 1990 Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Stated Radiological Controls IR 05000267/19900201990-11-14014 November 1990 Insp Rept 50-267/90-20 on 901029-1102.Noncitable Violation Noted.Major Areas Inspected:Insp of Fire Protection/ Prevention Program ML20058E4951990-10-30030 October 1990 Notice of Violation from Insp on 900928.Violation Noted: Licensee Did Not Perform Radiation & Airborne Surveys Before Allowing Special Svcs Licensed Operator to Enter Hot Svc Facility to Remove Five Unshielded Radioactive Samples IR 05000267/19900141990-10-11011 October 1990 Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted IR 05000267/19900111990-08-15015 August 1990 Insp Rept 50-267/90-11 on 900601-0728.No Violations Noted. Major Areas Inspected:Onsite Followup of Ler,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000267/19900131990-08-0303 August 1990 Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program Including Emergency Detection & Classification,Knowledge & Performance of Duties IR 05000267/19900101990-07-25025 July 1990 Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program,Liquid & Gaseous Radwaste Mgt Programs,Including Radiological Effluent Releases ML20044A3211990-06-22022 June 1990 Notice of Violation from Insp on 900425.Violation Noted: Licensee Made Notifications Re Water Chemistry to Natl Response Ctr & Did Not Make Required Notification to NRC Until on 900420 IR 05000267/19900071990-06-21021 June 1990 Insp Rept 50-267/90-07 on 900330-0531.Violations Noted.Major Areas Inspected:Followup on Items of Noncompliance,Onsite Followup of Lers,Review of 10CFR21 Repts,Operational Safety Verification & Monthly Maint Observation IR 05000267/19900081990-06-12012 June 1990 Insp Rept 50-267/90-08 on 900508-10.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Organization & Mgt Controls,Training & Qualifications & External & Internal Exposure Controls IR 05000267/19900091990-06-0101 June 1990 Insp Rept 50-267/90-09 on 900514-18.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator Training & Review of Activities Re Items Identified During Previous Insps PNO-IV-90-022, on 900419,elevated Levels of Hydrazine Detected in Plant Discharge Canal to Platte River.Release to Canal Terminated & Effluent Directed to Licensee Evaporation Ponds.On 900507,one Pond Found Leaking1990-05-16016 May 1990 PNO-IV-90-022:on 900419,elevated Levels of Hydrazine Detected in Plant Discharge Canal to Platte River.Release to Canal Terminated & Effluent Directed to Licensee Evaporation Ponds.On 900507,one Pond Found Leaking ML20042F3061990-04-27027 April 1990 Notice of Violation from Insp on 900207 & 0301.Violation Noted:Failure to Perform Step 5.4.27c of Surveillance Procedure SR 5.2.21-SA,Issue 23, Semiannual Surveillance on ACM Diesel, by Equipment Operator ML20042F5341990-04-27027 April 1990 Notice of Violation from Insp on 900226-0302.Violations Noted:Certain Emergency Training Determined to Be Ineffective in That Three Control Room Teams Exhibited Listed Weaknesses IR 05000267/19900051990-04-17017 April 1990 Insp Rept 50-267/90-05 on 900207-0329.Violations Noted. Major Areas Inspected:Onsite Followup of LERs & Items of Noncompliance,Operational Safety & Monthly Surveillance Observation ML20012F2411990-03-30030 March 1990 Notice of Violation from Insp on 900205-09.Violation Noted: Tests of 12 Zones Indicated That Perimeter Detection Sys Did Not Detect Individual Crawling,Walking,Running or Rolling Between Transmitters & Receivers IR 05000267/19900061990-03-27027 March 1990 Insp Rept 50-267/90-06 on 900226-0302.Violations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Changes to EPIPs & Review of Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000267/19900041990-03-27027 March 1990 Partially Withheld Insp Rept 50-267/90-04 on 900205-09 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support,Program Plan, Protected Area,Physical Barriers & Detection Aids ML20033E3851990-02-27027 February 1990 Exam Rept 50-267/OL-90-01 on 900201.Exam Results:Senior Reactor Operator Passed IR 05000267/19900031990-02-20020 February 1990 Insp Rept 50-267/90-03 on 900101-0206.No Violations or Deviations Noted.Major Areas Inspected:Previously Identified Insp Findings,Followup on Items of Noncompliance,Monthly Surveillance Observation & Operational Safety Verification IR 05000267/19900011990-01-25025 January 1990 Insp Rept 50-267/90-01 on 900108-12.No Violations or Deviations Noted.Major Areas Inspected:Qa Program in View of Decision to Defuel & Decommission Facility IR 05000267/19900021990-01-24024 January 1990 Insp Rept 50-267/90-02 on 900108-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/ Prevention Program Implementation & Followup of Previous Insp Findings ML20005G7421990-01-16016 January 1990 Notice of Violation from Insp on 891129.Violation Noted:On 891129,Fire Doors 13 & 9,between 480-volt Ac Switchgear Room & Bldg 10,propped Open for Several Hours W/O Establishing Continuous Fire Watch IR 05000267/19890231990-01-12012 January 1990 Insp Rept 50-267/89-23 on 891116-1231.Violation Noted.Major Areas Inspected:Onsite Followup of Lers,Licensee Action on Previously Identified Items,Operational Safety Verification, Monthly Maint & Surveillance Observation & Defueling ML20011D3301989-12-13013 December 1989 Insp Rept 50-267/89-22 on 891114-16.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000267/19890211989-12-0505 December 1989 Corrected Insp Rept 50-267/89-21 on 891001-1115.No Violations or Deviations Noted.Major Areas Inspected:Onsite Followup of Lers,Operational Safety Verification,Monthly Surveillance & Maint Observation ML19353B1011989-12-0505 December 1989 Insp Rept 50-267/89-21 on 891001-1115.No Violations or Deviations Noted.Major Areas Inspected:Onsite Followup of Lers,Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation ML19327B3601989-10-23023 October 1989 Notice of Violation from Insp on 890906.Violation Noted: Failure to Close Valve,Which Allowed Steam to Enter Into Svc Air Sys & Instrument Air Sys IR 05000267/19890201989-10-20020 October 1989 Insp Rept 50-267/89-20 on 890901-30.Violations Noted.Major Areas Inspected:Onsite Followup of Lers,Licensee Action on Previously Identified Insp Findings,Followup on Violations, Deviations & Operational Safety Verification IR 05000267/19890181989-10-13013 October 1989 Insp Rept 50-267/89-18 on 890911-15.No Violations Noted. Major Areas Inspected:Radiological Environ Monitoring Program,Including Organization & Mgt Controls,Qualifications & Training,Qa & Contractor Audits,Facilities & Equipment IR 05000267/19890191989-10-0202 October 1989 Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted.Major Areas Inspected:Region 19 CRD Assembly Recovery Activities,Followup on Region 19 CRD Clevis Bolt Failures & Steam Generator Ring Header Problems ML20248B3051989-09-26026 September 1989 Notice of Violation from Insp on 890716-0831.Violation Noted:Four Reactor Engineers Worked on safety-related Test of Reactor Core Beyond Tech Specs Limit W/O Documented Authorization PNO-IV-89-055, on 890829,Board of Directors Directed Termination of Nuclear Operations at Facility for 100-day Cooldown Period in Preparation for 30-month Reactor Defueling.Nrc Currently Reviewing Defueling Safety Analysis1989-08-29029 August 1989 PNO-IV-89-055:on 890829,Board of Directors Directed Termination of Nuclear Operations at Facility for 100-day Cooldown Period in Preparation for 30-month Reactor Defueling.Nrc Currently Reviewing Defueling Safety Analysis PNO-IV-89-052C, updates 890818,21 & 23 Unplanned Reactor Shutdowns Due to Inoperable Control Rod.Control Rod Assembly Will Be Removed Using Bldg Crane.Aluminum Shutter Will Be Remotely Placed on Bottom of Canister1989-08-25025 August 1989 PNO-IV-89-052C:updates 890818,21 & 23 Unplanned Reactor Shutdowns Due to Inoperable Control Rod.Control Rod Assembly Will Be Removed Using Bldg Crane.Aluminum Shutter Will Be Remotely Placed on Bottom of Canister PNO-IV-89-052B, on 890823,unplanned Reactor Shutdown Due to Inoperable Control Rod.Licensee Plans to Remove Control Rod Pair W/Bldg Crane in Unshielded Configuration to Shielded, Contained Evolution1989-08-23023 August 1989 PNO-IV-89-052B:on 890823,unplanned Reactor Shutdown Due to Inoperable Control Rod.Licensee Plans to Remove Control Rod Pair W/Bldg Crane in Unshielded Configuration to Shielded, Contained Evolution PNO-IV-89-052A, on 890818,after Attempting to Withdraw & Insert Control Rod Pair from Region 19,control Rod Motor Stopped Drawing Current & Indicated Open Conductor or Thermal Overload.Pair Will Be Withdrawn Using Bldg Crane1989-08-21021 August 1989 PNO-IV-89-052A:on 890818,after Attempting to Withdraw & Insert Control Rod Pair from Region 19,control Rod Motor Stopped Drawing Current & Indicated Open Conductor or Thermal Overload.Pair Will Be Withdrawn Using Bldg Crane 1997-04-07
[Table view] |
Text
-
APPENDIX A NOTICE OF DEVIAi!9N Public Service of Colorado Docket:
50-267/86-30 Fort St. Vrain Nuclear Generating Station License:
DPR-34 Based on the results of an NRC inspection conducted on October 27-31, ion 1986, one deviation from your commitment to the NRC was identified.
The deviat consisted of the failure to implement corrective action to preclude recurrence of an emergency preparedness recuirement violation.
In accordance with the
" General Statement of Policy anc Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986), the deviation is listed below:
Failure to Implement Action to Preclude Violation Recurrence A Notice of Violation was issued to Public Service of Colorado (PSC) on October 18, 1984, for failure to submit copies of changes to the emergency plan to the NRC in accordance with the requirements of 10 CFR 50.54(q).
In reply to this violation, PSC committed to take action to correct the failure and stated that verification of compliance with the requirement to preclude further violations would be accomplished by incorporating the verification of distribution into the quarterly surveillance test pertaining to emergency planning items.
In deviation from the above, on October 29, 1986, an NRC inspector determined that the verification of distribution committed to by PSC had not been incorporated into surveillance arocedure SR-TE-8-Q, " Maintenance of Emergency Preparedness," and was not aeing accomplished under the requirements of any other procedure (267/8630-01).
In response to this deviation, on October 30, 1986, PSC completed a Procedure Deviation Report for procedure SR-TE-8-Q, adding a requirement to the existing procedure to verify submittal of plan and procedure changes to the NRC within 30 days of the effective date of the documents.
In addition, a 3recautionary statement was added identifying this change as a commitment to tie NRC which may not be deleted without issuance of comparable controls.
A Document Coordination and Concurrence form was also initiated on October 30, 1986, to incorporate this change into the surveillance procedure.
The NRC inspector reviewed the PSC corrective action prior to the end of 'he t
inspection and found it to be responsive to the NRC concern raised in this Notice of Deviation; therefore, no additional written response is required for this deviation.
Dated at Arlington, Texas, this 20th day of November 1986 l