IR 05000267/1990002

From kanterella
Jump to navigation Jump to search
Insp Rept 50-267/90-02 on 900108-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/ Prevention Program Implementation & Followup of Previous Insp Findings
ML20006B720
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/24/1990
From: Singh A, Stetka T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20006B716 List:
References
50-267-90-02, 50-267-90-2, NUDOCS 9002050290
Download: ML20006B720 (4)


Text

.

.

..

...

..

.

...

~. -

  • 3-

_.

  • APPENDIX U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC: Inspection Report: 50-267/90-02 Operating License: DPR-34 Docket: 50-267 Licensee: Public Service Company of Colorado (PSC)

>

P.O. Box 840 Denver, Colorado-80201-0840-Fa ility Name: FortSt..Vrain(FSV)

Inspection At:

FSV Site, Weld County, Colorado Inspection Conducted: January 8-12, 1990-Inspector:

l[24[90-A. Singh, Rea'ctor Inspector, Plant Systems.

Date A

Section, Division of Reactor Safety

'

Approved:

a~-

/

(L T. F. Stetha, Chief, Plant Systems Section Date

'

Division df Reactor Safety Inspection Summary-i Inspection Conducted January 8-12, 1990 (Report 50-267/90-02)

Areas Inspected: Routine, announced inspection of fire protection / prevention

!

program implementation and ft,Ilowup of previous inspection findings.

!

Results: Within the areas inspected, no violations or deviations were Tden'ETTied. - The review of cctions taken..on previous inspection findings n

.resulted in the closing of ene deviation' one unresolved' item, and one open

,.

item.

In the area of fire protection / prevention program implementation, the overall program-is well maintained and implemented in accordance with the.

licensee's comitments.

,

l ggg20gggggggaggg,

,

/

.

-

.

.

,

,...

,

,

.
-

,

!

-2-i

-

d L

j DETAILS.

J 1.-

PERSONS CONTACTED PSC=

  • M.: Block, Systems-Engineer

..

' *F. Borst, Manager,- Nuclear Training

.

  • S.~Chesnutt, Supervisor,-Nuclear Licensing Operations

,

R. Craun, Manager Engineering

.

.*H. Deniston, Superintendent of Operations

  • D. Evans,' Manager, Operations / Maintenance-

.

",

'M. Ferris, Quality Assurance (QA).0perations Manager. _

J. Gramling,:Superybor, Nuclear Licensing Operations.

  • D. Gross, Manager, Nuclear. Regulatory Affairs

,

  • M.. Holmes, Nuclear. Licensing-Manager
  • M. Niehuff, Engineering Manager-
  • F. Novacheck, Program Manager-
  • G. Schmaltz, Fire Protection,-Program Manager L. Sutton, Supervisor. QA AuditingL

,

  • M. Thiel,' Professional Engineer.

-

  • F. Tilson,-Engineering Supervisor

' *P. Tomlinson, Manager, QA -

i

'

NRC t -

  • R.Farrell,SeniorResidentInspedtor

!

'*W. McNeill, Reactor Inspector, Region IV

  • Denotes those attending the exit interview.

j li 2.

FOLLOWUP OF PREVIOUS INSPECTION FINDINGS ;(92701, 92702).

s t

(Closed)UnresolvedItem(267/8712-04):5 This item waslunresolved!due'to the.

j

'3 absence of fire detectors in certain areas of the turbine 1 building and:due to:

concerns.about the potential installation deficiencies regardingLthe linear

,

L

' beam' type fire detectors. The licensee _has insta11ed' additional 1 detectors:in:

L the turbine building:under Change' Notice 2003D.

In-addition, by letter dated a '

'

l May 18, :1989, from Kenneth L. Heither te Mr._ R. '0'. Williams, Jr... the NRC

"

.

L accepted the' installation of the 11near. beam. detectors as meeting NFPA

'

-

Standards'72D and 72E.

~

>

s

ni a

>

j.

(Closed) Deviation ~ (267/8821-03):1. Failure to;prov'ide~a, documented analysis to'

.

. justify use of portable fans in the'three-room.complexE~The licensee has;-

A L

'

'

-

g installed a breaker.in the Alternate' Cooling Method:(ACM) 'switchgear:to bringi

?

'

>

the; power to! Building,10 via'a transfer. switch (N-3293).: The cable is

.

s

'

routed underground-in conduitioutside'the building'and separated from the.

'

o E.

normal-power feed. 'This is:an' acceptable. alt'ernate> power source for?

g U

< 4

'

L 1 Building 10.

.

.

%

l.

ji N

'

'

.

r

,

f

"

'{,

'.

f f!;

'

t

'

1L

-

,

L

m

_,

.

3:

.

.,

~

.

. _ - -. -.

-.-

_. -

- - _ _ _ - - - _ -

- -.

- - - - - - _

.

.

.

r

.-.i.

.

-

,

'

-3--

(0 pen)'UnresolvedItem(267/8821-06): This item was unre:,olved pending the

licensee's final resolution of the potential loss of required 125 V DC power-supplies. The licensee's consultant'has conducted an evaluation of the-vulnerability of these power supplies to multiple high impedance faults. The licensee's consultant's report was submitted to NRC for review. This item is~

open pending resolution by the NRC.

'l (Closed)OpenItem(267/8821-07): This item was open pending the installation..

and testing.of a new communication system to eliminate the communication dead

,

spots within the plant. The inspector verified the installation of:the communication system at FSV. The inspector also reviewed the. test results.of the newly installed communication-system and found it to be acceptable.

3.

FIRE PROTECTION / PREVENTION PROGRAM (64704)

This. inspection was conducted'to evaluate the overall adequacy of the licensee's fire protection program. This evaluation-included whether the licensee was. properly implementing the program and whether the program was in conformance with regulatory requiremer.ts. and. industry guides and standards.'

The inspector reviewed the-following procedures:

Procedure No.

Title Issue:

.Date P-8 Fire Fighting and. Prevention

10/26/88

-

None Fire Protection Operability

'2'

05/04/88 (Fire Protection O Requirements 1-16)perability SR-FP-1A-W Carbon Dioxide Fire Suppression l'

f>2/19/88 '

..

System Weekly Verification of Tank l:

Level and Pressure

!

SR-FP-1C-A-Verification of Flow Path and

06/17/88-

'

!

Cardox' System Valves and Dampers i

j Upon Actuation Signal MAP-17 Fort-St. Vrain (FSV) Fire Rated'

07/06/89;

'

Door Haintenance Program-TP-FF Training Procedures - Fire Fighting

04/18/89

'

D-1 FSV Plant. Systems Operating Manual.

.12/11/89'

for Defueling The inspector found the above procedures to be technically adequate to implement

.the fire protection / prevention program at'FSV station.

-

.

Procedural guidance was provided to control combustible material and reduce fire hazards. Administrative-procedures also provide for maintenance and

i'

,

,

-

.

,.,

-

{

....

. -.

surveillances.on fire sup)ression, detection,.and support equipment. The licensee has maintained t1e personnel training, qualifications, and responsibilities for the fire brigade members. Maintenance evolutions that significantly increase fire risk are-properly. controlled.

The inspector toured accessible areas of the plant to de.termine general area i

conditions and to visually observe the condition of fire protection systems and'

equipment. Combustible materials, flamable and combustible liquid, and gas usage were restricted for use or properly centro 11ed in areas containing

-

safety-related equipment and equipmant. During the walkdown of the plant, the inspector's checks included positions of selected valves, fire barrier-conditions, hose-station-location and conditions, and type, location, and-

-condition of fire extinguishers.

'

Welding, cutting, or use of open flame ignition sources were not found in the areas toured. There were no construction' activities in progress during the-(

walkdown. General housekeeping conditions were found to be excellent.

-

The inspector reviewed the completed packages for functional testing of fire detectors and emergency lighting installed in the safety-related areas. The packages reviewed indicated that the equipment was tested in accordance with therequirementsspecified.intheTechnicalSpecifications(TS). Fire brigade equipment, including emergency. breathing apparatus, was found to be properly stored and maintained.

'

The inspector also reviewed fire brigade training and drill records. The records were u)-to-date and confirmed that training and drills were being conducted at tie specified_ intervals.

The inspector reviewed the last two quality assurance fire protection audits.

These audits were conducted in-June 1988 and July:1989. The audit packages I

were well organized and appeared thorough and informative. The reviews of these packages indicated that the licensee had documented deficient conditions and had initiated the corrective action..These audit packages-satisfied the-requirements of the FSV TS relative to the fire'protaction program._

There were no violations or deviations-identified.in this area.of the inspection.

,

'4.

EXIT INTERVIEW The inspector sumarized the scope and findings of the _ inspection during;the '

exit interview conducted on January 12, 1990, with the personnel identified in paragraph'1 of this report.. The licensee did not identify as proprietary'any

,

-

s of the materials provided to, or reviewed by the inspector-during the-

!

inspection.

,

,

.

q

>

1