Forwards Insp Rept 50-267/86-30 on 861027-31 & Notice of Deviation
ML20214E856
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/20/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20214E859 List:
References
NUDOCS 8611250117
Download: ML20214E856 (2)


See also: IR 05000267/1986030

Text

'

NOV 2 01986

In Reply Refer To:

Docket:

50-267/86-30

Public Service Company of Colorado

ATTN:

Robert O. Williams, Jr.

Vice President, Nuclear Operations

P. 0. Box 840

Denver, Colorado

80201-0840

Gentlemen:

This refers to the ins)ection conducted by Mr. J. B. Baird of this office

during the period Octo)er 27-31, 1986, of activities authorized by NRC

Operating License DPR-34 for the Fort St. Vrain Nuclear Generating Station, and

'

to the discussion of our findings with you and other members of your staff at

the conclusion of the inspection.

.

Areas examined during the inspection included changes to the emergency

preparedness program and audits.

Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel,in the enclosed inspection report.

and observations by the NRC inspector.

The inspection findings

are documented

During this inspection,tment made to the NRC.it was found that certain of your activities a

to deviate from a commi

This item and reference to the

commitment is identified in the enclosed Notice of Deviation.

Your corrective

action in response to the deviation was reviewed by the NRC inspector prior to

the conclusion of the inspection and, therefore, no additional response is

required for this item.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

%I Signed by:

R. E. Hall'* g,v

J. E. Gagliardo, Chief

ReactorProjectsBranch

Enclosures:

(seenextpage)

.,/

RINP&SPS

C:EP&SPS

C:R&SPB

-IRPB

[JEGag/86

RB

JBBaird:cjg

LAYandell

WLFisher

/JPJaudon

liardo

//7

A

//f/86

/

///6/86

11 /19 /86

6 /l'l/86

////f

g

3

8611250117 861120

h

ADOCK0500g7

PDR

.__

__

. . ,

Public Service Company of Colorado

-2-

-

Enclosures:

1.

Appendix A - Notice of Deviation

2.

Appendix B - NRC Inspection Report

50-267/86-30

cc w/ enclosures:

J. W. Gahm, Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Station

16805 WCR 19

Platteville, Colorado

80651

L. Singleton, Manager, Quality

Assurance Division

(same address)

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

bec to DMB (IE35)

bec distrib. by RIV:

  • RPB

DRSP

  • RRI

R. D. Martin, RA

  • Section Chief (RPB/A)
  • RSB
  • Section Chief (RSB/ES)
  • J. B. Baird
  • R&SPB
  • L. A. Yandell
  • MIS System
  • W. L. Fisher
  • RSTS Operator

R. L. Bangart

  • RIV File

D. B. Matthews, IE

  • w/766

.