gr f'
I APPENDIX A i
e l
4 Public Service Company of Colorado Docket:
50-267 Fort St. Vrain Nuclear Generating Station License:
DPR-34 During an NRC inspection conducted on September 6,1989, a violation of NRC requirements was identified. The violations involved a failure to follow procedure.
In accordance with the " General Statement of Polic and Procedure i
for NRC Enforcement Actions," 10 CFR Part 2 Appendix C (1989)y(Enforcement Policy),theviolationislistedbelow:
Failure to Follow Procedure l
l The Fort St. Vrain Technical Specifications, Section 7.4.a. states, in part, that ' written procedures shall be established, implemented...."
Procedure 50P-84-02, Issue 7. "Outside Auxiliary Boiler," states in Step 4.2.1.40.e) to " Slowly close V-84881."
Contrary to the above, on September 6,1989, Yalve V-84881 was not closed.
l which allowed steam to enter the service air system which then entered the "A" Instrument Air System.
l This is a Severity Level !Y violation.
(SupplementI)(267/8920-01) l Pursuant to the provisions of 10 CFR 2.201, Public Service Company of Colorado is hereby required to submit to this office within 30 days of the date of the ietter transmitting this Notice; a written statement or explanation in reply.
including for each violation:
(1) the reason for the violation if admitted, the corrective steps which have been taken and the results achieved, the corrective steps which will be taken to avoid further violations, and the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time, I
Dated at Arlington, Tex s s
this23JdayofO 989 0910310015 091023 DR ADOCK 0500 7
.