Submits Daily Highlight.On 860304,exemption Granted to Allow Util to Perform Necessary Peak Cladding Temp Calculations W/Approved Code & Based on Actual Plant Conditions. Calculations Will Be Completed by 860831
ML20210C161
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 03/04/1986
From: Schierling H
Office of Nuclear Reactor Regulation
To: Harold Denton, Eisenhut D, Lyons J
NRC
Shared Package
ML082840462 List: ... further results
References
FOIA-86-197 NUDOCS 8603120086
Download: ML20210C161 (1)


Text

__

y 4

mtj.

~ -

qgt t _p g

_ u; ;,

noe

' ;*J g-

~f

[

m-

+*

  1. e, UNITES) STATES' NUCLEAR REGULATORY COMMISSION

],

g 3

E WASHINGTON, D. C. 20555 E

March 4, 1980 Docket No. 50-323 MEMORANDUM FOR:

H. Denton R. Houston L. Rubenstein

' D. Eisenhut D. Crutchfield J. B. Youngblood J. Lyons E. Rossi V. Noonan H. Thompson G. Lainas G. Lear F. Miraglia T. Speis C. Berlinger R. Bernero W. Russell G. Holahan V. Benaroya T. Novak J. Milhoan F. Schroeder D. Vassallo THRU:

Steven A. Varga, Director PWR Project Directorate #

Division of PWR Licensing FROM:

Hans E. Schierling, Senior Project Manager PWR Project Directorate #3 Division of PWR Licensing-A

SUBJECT:

DAILY HIGHLIGHT Plant Name Diablo Canyon Unit 2 Exemption A n-Ex emp t ion -h a s-been-g ra n ted-tod ay-fo r-Di a bl o-C a nyon-Uni ttre ga rding1 tie requirement in 10 CFR 50.46(a)(1) that a plant specific ECCS cooling performance analysis must be performed with an approved code which demonstrates that the peak cladding temperature (PCT) limit of 2200*F in 10 CFR 50.46(b) is not exceeded. The heat transfer characteristics of the Unit 2 steam generators are better and the reactor operates with a lower Tavg than was assumed in the original analysis, resulting in a PCT that exceeds the 2200*F limit by about 7 F.

The Exemption was granted to allow the licensee to perform the necessary PCT calculations with an approved code and based on actual pTant operation conditions, which are expected to be completed in late August, 1986. The Exemption is based on the heat flux hot channel factor, Fq, being reduced through administrative control, from the value of 2.32 in the Technical Specifications to 2.30 to assure that the calculated PCT does not exceed 'the 2200*F limit.

~

The operational characteristics of Unit 1 are consistent with the analysis and do not require an exemption.

~

Hans E. Schierling yft h

) M PWR Project Directorate #3 Senior Project Manager s

Division of PWR Licensing-A f ifr\\

4 3

NOTE CHANGES