Notice of Violation from Insp on 860409-0710
ML20207J309
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 07/18/1986
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20207J306 List:
References
50-155-86-07, 50-155-86-7, NUDOCS 8607290013
Download: ML20207J309 (1)


Text

.

4 c

NOTICE OF VIOLATION Consumers Power Company Docket No. 50-155 As a result of the inspection conducted on April 9 through July 10, 1986, and in accordance with the " General Policy and Procedures for NRC Enforcement i Actions," 10 CFR Part 2, Appendix C (1985), the following violation was  !

identified:

Technical Specification 7.3.4, Normal Power Operation, states that the principal functions of operators during power operation includes "the adjustment of the control rod pattern to accommodate changes in reactivity and to maintain the desired power distribution" and "the evaluation of abnormal conditions and the initiation of corrective action as required".

Technical Specification 5.2.2.f, Abnormal Behavior of the Control Rod System, requires "an immediate and thorough investigation shall be made of the occurrence of any abnormal behavior. . . of the control system to determine the cause and safety significance of the occurrence".

Contrary to the above on February 3, 1986, operators failed to investigate the cause of abnormal control rod behavior during required rod drive surveillance.

  • As a result, desired rod position and power distribution was not maintained.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation: (1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

7 -

JUL 181986 g g y),4 Dated Charles E. Norelius, Director Division of Reactor Projects PDR