0

(

Appendix A NOTICE OF VIOLATION Consumers Power Company Docket No. 50-155 Based on the inspection conducted on June 22-24, 1977, it appears that certain of your activities were in noncompliance with~NRC requirements, as noted below. Item 1 is an infraction, and item 2 is a deficiency.

1. Technical Specification 6.8.1 states " written procedures shall be established, implemented and maintained for all structures, systems, components, and safety actions defined in the Big Rock Point Quality List." Section 17.3.2 of the Big Rock Point Quality List states that procedures will be developed for operations involving reactor safety such as instrument setpoints.

Contrary to the above, a procedure has not been written t to address the calibration of incore detectors.

l

2. Technical Specification 6.8.2 states "Each procedure . . .

and changes thereto, shall be reviewed by the PRC . . . and approved by the Plant Superintendent prior to implementation."

Contrary to the above when a shutdown margin test was performed on May 3, 1976, a change was made to Procedure BRP-RE-8, step 83 without the change being reviewed or approved.

(

)