ML20207J303
| ML20207J303 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 07/18/1986 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Buckman F CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20207J306 | List: |
| References | |
| NUDOCS 8607290011 | |
| Download: ML20207J303 (2) | |
See also: IR 05000155/1986007
Text
.__
_ _ -
__
--
o wC
.
b
M
[f UL 181900
Docket No. 50-155
Consumers Power Company
ATTN: Dr. Frederick W. Buckman
Vice President
Nuclear Operations
212 West Michigan Avenue
Jackson, MI 49201
Gentlemen:
This refers to the routine safety inspection conducted by Mr. Stephen Guthrie
of this office on April 9 - July 10, 1986, of activities at Big Rock Point
Nuclear Plant authorized by NRC Operating License No. DPR-6 and to the
discussion of our findings with Mr. David Hoffman at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
is required.
In addition to the violation, this report discusses two instances where
administrative oversight resulted in failure to perform testing required by
Technical Specifications. Because these events meet the Enforcement Policy
criteria for licensee self identified and corrected events (10 CFR 2, Appendix
C, Part V.A), no violations are being issued. However, deficient
administrative control that contributes to both these instances and the
instance of mispositioned control rods that is the subject of the violation
noted above is of significant concern and should be addressed in your response
to this report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosures will be placed in the NRC's Public Document Room.
The responses directed by this letter and the accompanying Notice (order) are
not subject to the clearance procedures of the Office Of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL96-511.
8607290011 860718
ADOCK 05000155
G
\\
g,f0
If
._.
-
.
.,
.
-
_ _ .
-
i-
,
i
gl[ [819t}{}
'
Consumers Power Company
2
,
i
We will gladly discuss any questions you have concerning this inspection.
'
Sincerely,
i
q. , : :n;
. .
. ; c . E . .ic rc H us"
-
1
Charles E. Norelius, Director
Division of Reactor Projects
I
Enclosures:
1.
i
2.
Inspection Report
i
No. 50-155/86007(DRP)
i
i
cc w/ enclosures:
Mr. Kenneth W. Berry, Director
i
Nuclear Licensing
'[
D. P. Hoffman, Plant
Superintendent
DCS/RSB (RIDS)
i
Licensing Fee Management Branch
Resident Inspector, RIII
l
Ronald Callen, Michigan
i
Public Service Commission
!
Nuclear Facilities and
!
Environmental Monitoring
j
Section
i
i
)
I
r
t
i
i
!
!
,
i
r
f
RIII
J
RIII '
RIII
RIII
I
Landsman /jp
Boy
Guldemand
!
7 - 16 4
~7- l' 'Y
M'd
11 g
i
I
!