Category:INSPECTION REPORT
MONTHYEARIR 05000155/19990051999-09-30030 September 1999 Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted.Major Areas Inspected: Routine Decommissioning Insp Covered Aspects of Facility Mgt & Control & Decommissioning Support Activities IR 05000155/19990041999-08-12012 August 1999 Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted. Major Areas Inspected:Aspects of Facility Mgt & Control, Decommissioning Support Activities Including Security, Spent Fuel Safety & Radiological Safety IR 05000155/19990031999-06-21021 June 1999 Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19990021999-04-26026 April 1999 Insp Rept 50-155/99-02 on 990226-0415.No Violations Noted. Major Areas Inspected:Aspects of Facility Mgt & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19990011999-03-19019 March 1999 Insp Rept 50-155/99-01 on 990113-0225.One non-cited Violation Noted.Major Areas Inspected:Aspects of Facility Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980091999-01-15015 January 1999 Insp Rept 50-155/98-09 on 981201-990112.No Violations Noted. Major Areas Inspected:Licensee Management & Control, Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000155/19980081998-12-0303 December 1998 Insp Rept 50-155/98-08 on 980827-1130.No Violations Noted. Major Areas Inspected:Radiological Safety IR 05000155/19980071998-10-14014 October 1998 Insp Rept 50-155/98-07 on 980827-1007.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Physical Security,Spent Fuel Safety & Radiological Safety IR 05000155/19980061998-09-0303 September 1998 Insp Rept 50-155/98-06 on 980716-0826.No Violations Noted. Major Areas Inspected:Aspects of Licensee Mgt & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980051998-07-24024 July 1998 Insp Rept 50-155/98-05 on 980528-0715.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980021998-04-21021 April 1998 Insp Rept 50-155/98-02 on 980203-0406.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19970151998-02-14014 February 1998 Insp Rept 50-155/97-15 on 971205-980202.Violations Noted. Major Areas Inspected:Facility Management & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety ML20197E5901997-12-17017 December 1997 Insp Rept 50-155/97-13 on 971008-1204.Violations Noted. Major Areas Inspected:Major Aspects of Licensee Decommissioning Activities,Including Facility Mgt & Control, Decommissioning Support & Spent Fuel Safety Controls IR 05000155/19970101997-11-26026 November 1997 Insp Rept 50-155/97-10 on 970802-1007.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000155/19970121997-10-17017 October 1997 Insp Rept 50-155/97-12 on 970812-1007.Violations Noted.Major Areas Inspected:Miscellaneous Security & Safeguards Issues IR 05000155/19970091997-10-0909 October 1997 Insp Rept 50-155/97-09 on 970617-0804.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering IR 05000155/19970081997-07-22022 July 1997 Insp Rept 50-155/97-08 on 970430-0616.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20140G8931997-06-10010 June 1997 Insp Rept 50-155/97-04 on 970313-0429.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000155/19970071997-06-0606 June 1997 Insp Rept 50-155/97-07 on 970426-0501.No Violations Noted. Major Areas Inspected:Licensee Fire Protection Program IR 05000155/19970061997-05-23023 May 1997 Insp Rept 50-155/97-06 on 970428-0502.No Violations Noted. Major Areas Inspected:Review of Vehicles Barrier Sys,Audits & Self Assessment,Testing,Maint,Security Contingency Capability & Protected Area Detection ML20141J9951997-05-19019 May 1997 Insp Rept 50-155/97-05 on 970303-0428.Violations Noted. Major Areas Inspected:Event in Which Workers Entered Power Block While Reactor at 9% Power Level Prior to Performance of Adequate Evaluation of Area Radiological Conditions IR 05000155/19970031997-05-13013 May 1997 Insp Rept 50-155/97-03 on 970331-0404.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program IR 05000155/19960121997-02-24024 February 1997 Insp Rept 50-155/96-12 on 961130-970117.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000155/19960011997-01-29029 January 1997 Insp Rept 50-155/96-01 on 961019-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20133C5231997-01-0202 January 1997 Insp Rept 50-155/96-11 on 961202-06.Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry Controls,Status of Rp&C Facilities & Equipment IR 05000155/19960071996-12-0606 December 1996 Insp Rept 50-155/96-07 on 960909-12.No Violations Noted. Major Areas Inspected:Emergency Plan & Procedures IR 05000155/19960061996-10-28028 October 1996 Insp Rept 50-155/96-06 on 960727-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000155/19960051996-09-20020 September 1996 Insp Rept 50-155/96-05 on 960608-0726.No Violations Noted. Continued Attention Needed on Maint Work on Plant TS Required Equipment.Major Areas Inspected:Engineering,Maint, & Plant Support IR 05000155/19940071994-05-12012 May 1994 Insp Rept 50-155/94-07 on Stated Date.Violations Noted.Major Areas Inspected:Operational Safety Verification,Engineered Safety Feature Sys Walkdown,Maint & Surveillance,Engineering & Plant Support Activities IR 05000155/19940061994-05-12012 May 1994 Insp Rept 50-155/94-06 on 940321-25.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program IR 05000155/19930191993-12-21021 December 1993 Insp Rept 50-155/93-19 on 931020-1214.Violations Noted.Major Areas Inspected:Operational Safety Verification,Engineered Safety Feature Sys Walkdowns & Maint & Surveillance Activities IR 05000155/19930201993-11-10010 November 1993 Insp Rept 50-155/93-20 on 931025-29.No Violations Noted. Major Areas Inspected:Followup Insp of Previously Identified Edsfi Findings IR 05000155/19930171993-11-0404 November 1993 Insp Rept 50-155/93-17 on 931018-22.No Violations Noted. Major Areas Inspected:Fire Protection Insp of Surveillances, Equipment,Fire Brigade Training,Zebra Mussel Problems & Fire Protection Audits IR 05000155/19930131993-10-22022 October 1993 Insp Rept 50-155/93-13 on 930828-1019.No Violations Noted. Major Areas Inspected:Esf Sys Walkdowns,Radiological Controls,Security,Maint & Surveillance Activities & Mgt Meetings IR 05000155/19930141993-10-14014 October 1993 Enforcement Conference Rept 50-155/93-14 on 931012.Major Areas Discussed:Reviewed Apparent Violations & Areas of Concern Identified During Insp & Corrective Actions Taken or Planned by Licensee IR 05000155/19930151993-10-0404 October 1993 Insp Rept 50-155/93-15 on 930824-0914.Violations Noted Are Being Considered for Escalated Ea.Major Areas Inspected: Conditions Surrounding Hydrostatic Primary Sys Test & Breach of Containment Integrity W/Concurrent Mode Change at Plant IR 05000155/19930161993-10-0404 October 1993 Insp Rept 50-155/93-16 on 930913-17.No Violations Noted. Major Areas Inspected:Inservice Testing Program,Program on Check Valves & License self-assessment IR 05000155/19930111993-09-0909 September 1993 Insp Rept 50-155/93-11 on 930716-0827.No Violation Noted. Major Areas Inspected:Operational Safety Verification,Esf Sys Walkdowns,Maint & Surveillance Activities,Engineering & Technical Support Activities & Safety Assessment ML20057A1311993-09-0808 September 1993 Insp Rept 50-155/93-10 on 930809-20.Violations Noted.Major Areas Inspected:Conditions Surrounding 930708 Event Re Both Containment High Pressure Sensors Outside Allowable TS Tolerances Due to Installation Error IR 05000155/19930121993-08-31031 August 1993 Insp Rept 50-155/93-12 on 930809-13.No Violations Noted. Major Areas Inspected:Radiation Protection Program During Outage IR 05000155/19930091993-07-19019 July 1993 Insp Rept 50-155/93-09 on 930712-14.No Violations or Deviations Noted.Major Areas Inspected:Review of Programs, Procedures,Observation of Work Activities,Data Review & Erosion/Corrosion Program IR 05000155/19930081993-07-12012 July 1993 Insp Rept 50-155/93-08 on 930621-25.One non-cited Violation Noted.Major Areas Inspected:Rp Program & Gaseous & Liquid Radwaste Program,Including Mgt Control & Organization & Internal & External Exposure IR 05000155/19930061993-05-28028 May 1993 Insp Rept 50-155/93-06 on 930407-0525.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Activities,Engineered Safety Feature Sys Walkdown & Outage & Planning Control IR 05000155/19930041993-04-0909 April 1993 Insp Rept 50-155/93-04 on 930322-26.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise,Including Review of Exercise Scenario & Followup on Licensee Actions on Previous Insp Findings IR 05000155/19930051993-03-31031 March 1993 Insp Rept 50-155/93-05 on 930322-26.No Violations Noted. Major Areas Inspected:Physical Security Insp Involving Mgt Support,Protected & Vital Area Barriers,Detection & Assessment Aids,Access control-personnel & Packages IR 05000155/19930021993-02-19019 February 1993 Insp Rept 50-155/93-02 on 930105-0216.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Activities,Safety Assessment & Quality Verification & Followup of LERs IR 05000155/19920251992-12-0101 December 1992 Insp Rept 50-155/92-25 on 921116-20.No Violations Noted. Major Areas Inspected:Organization,Reactor Sys Water QC Programs Qa/Qc Program in Lab & Nonradiological Confirmatory Measurements IR 05000155/19920241992-11-25025 November 1992 Insp Rept 50-155/92-24 on 921020-1123.No Violations Noted. Major Areas Inspected:Maint & Surveillance Activities, Evaluation of Licensee self-assessment Capability & Cold Weather Preparations IR 05000155/19910021991-02-22022 February 1991 Safety Insp Rept 50-155/91-02 on 910101-0211.No Violations Noted.Major Areas Inspected:Functional Areas,Surveillance Activities on Various Sys,Maint Activities on Various Components,Core Spray Sys & Liquid Poison Sys IR 05000155/19900211990-12-19019 December 1990 Safety Insp Rept 50-155/90-21 on 901009-17 & 1210.No Violations or Deviations Identified.Major Areas Inspected: Inservice Insp Activities Including Review of Programs, Procedures,Data & Observation of Work Activities 1999-09-30
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000155/19990051999-09-30030 September 1999 Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted.Major Areas Inspected: Routine Decommissioning Insp Covered Aspects of Facility Mgt & Control & Decommissioning Support Activities IR 05000155/19990041999-08-12012 August 1999 Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted. Major Areas Inspected:Aspects of Facility Mgt & Control, Decommissioning Support Activities Including Security, Spent Fuel Safety & Radiological Safety IR 05000155/19990031999-06-21021 June 1999 Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19990021999-04-26026 April 1999 Insp Rept 50-155/99-02 on 990226-0415.No Violations Noted. Major Areas Inspected:Aspects of Facility Mgt & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19990011999-03-19019 March 1999 Insp Rept 50-155/99-01 on 990113-0225.One non-cited Violation Noted.Major Areas Inspected:Aspects of Facility Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980091999-01-15015 January 1999 Insp Rept 50-155/98-09 on 981201-990112.No Violations Noted. Major Areas Inspected:Licensee Management & Control, Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000155/19980081998-12-0303 December 1998 Insp Rept 50-155/98-08 on 980827-1130.No Violations Noted. Major Areas Inspected:Radiological Safety IR 05000155/19980071998-10-14014 October 1998 Insp Rept 50-155/98-07 on 980827-1007.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Physical Security,Spent Fuel Safety & Radiological Safety IR 05000155/19980061998-09-0303 September 1998 Insp Rept 50-155/98-06 on 980716-0826.No Violations Noted. Major Areas Inspected:Aspects of Licensee Mgt & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980051998-07-24024 July 1998 Insp Rept 50-155/98-05 on 980528-0715.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980021998-04-21021 April 1998 Insp Rept 50-155/98-02 on 980203-0406.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19970151998-02-14014 February 1998 Insp Rept 50-155/97-15 on 971205-980202.Violations Noted. Major Areas Inspected:Facility Management & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety ML20197E5901997-12-17017 December 1997 Insp Rept 50-155/97-13 on 971008-1204.Violations Noted. Major Areas Inspected:Major Aspects of Licensee Decommissioning Activities,Including Facility Mgt & Control, Decommissioning Support & Spent Fuel Safety Controls IR 05000155/19970101997-11-26026 November 1997 Insp Rept 50-155/97-10 on 970802-1007.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000155/19970121997-10-17017 October 1997 Insp Rept 50-155/97-12 on 970812-1007.Violations Noted.Major Areas Inspected:Miscellaneous Security & Safeguards Issues IR 05000155/19970091997-10-0909 October 1997 Insp Rept 50-155/97-09 on 970617-0804.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering IR 05000155/19970081997-07-22022 July 1997 Insp Rept 50-155/97-08 on 970430-0616.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20140G8931997-06-10010 June 1997 Insp Rept 50-155/97-04 on 970313-0429.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000155/19970071997-06-0606 June 1997 Insp Rept 50-155/97-07 on 970426-0501.No Violations Noted. Major Areas Inspected:Licensee Fire Protection Program IR 05000155/19970061997-05-23023 May 1997 Insp Rept 50-155/97-06 on 970428-0502.No Violations Noted. Major Areas Inspected:Review of Vehicles Barrier Sys,Audits & Self Assessment,Testing,Maint,Security Contingency Capability & Protected Area Detection ML20141J9951997-05-19019 May 1997 Insp Rept 50-155/97-05 on 970303-0428.Violations Noted. Major Areas Inspected:Event in Which Workers Entered Power Block While Reactor at 9% Power Level Prior to Performance of Adequate Evaluation of Area Radiological Conditions IR 05000155/19970031997-05-13013 May 1997 Insp Rept 50-155/97-03 on 970331-0404.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program IR 05000155/19960121997-02-24024 February 1997 Insp Rept 50-155/96-12 on 961130-970117.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000155/19960011997-01-29029 January 1997 Insp Rept 50-155/96-01 on 961019-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20133C5231997-01-0202 January 1997 Insp Rept 50-155/96-11 on 961202-06.Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry Controls,Status of Rp&C Facilities & Equipment IR 05000155/19960071996-12-0606 December 1996 Insp Rept 50-155/96-07 on 960909-12.No Violations Noted. Major Areas Inspected:Emergency Plan & Procedures IR 05000155/19960061996-10-28028 October 1996 Insp Rept 50-155/96-06 on 960727-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000155/19960051996-09-20020 September 1996 Insp Rept 50-155/96-05 on 960608-0726.No Violations Noted. Continued Attention Needed on Maint Work on Plant TS Required Equipment.Major Areas Inspected:Engineering,Maint, & Plant Support IR 05000155/19940071994-05-12012 May 1994 Insp Rept 50-155/94-07 on Stated Date.Violations Noted.Major Areas Inspected:Operational Safety Verification,Engineered Safety Feature Sys Walkdown,Maint & Surveillance,Engineering & Plant Support Activities IR 05000155/19940061994-05-12012 May 1994 Insp Rept 50-155/94-06 on 940321-25.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program IR 05000155/19930191993-12-21021 December 1993 Insp Rept 50-155/93-19 on 931020-1214.Violations Noted.Major Areas Inspected:Operational Safety Verification,Engineered Safety Feature Sys Walkdowns & Maint & Surveillance Activities IR 05000155/19930201993-11-10010 November 1993 Insp Rept 50-155/93-20 on 931025-29.No Violations Noted. Major Areas Inspected:Followup Insp of Previously Identified Edsfi Findings IR 05000155/19930171993-11-0404 November 1993 Insp Rept 50-155/93-17 on 931018-22.No Violations Noted. Major Areas Inspected:Fire Protection Insp of Surveillances, Equipment,Fire Brigade Training,Zebra Mussel Problems & Fire Protection Audits IR 05000155/19930131993-10-22022 October 1993 Insp Rept 50-155/93-13 on 930828-1019.No Violations Noted. Major Areas Inspected:Esf Sys Walkdowns,Radiological Controls,Security,Maint & Surveillance Activities & Mgt Meetings IR 05000155/19930141993-10-14014 October 1993 Enforcement Conference Rept 50-155/93-14 on 931012.Major Areas Discussed:Reviewed Apparent Violations & Areas of Concern Identified During Insp & Corrective Actions Taken or Planned by Licensee IR 05000155/19930151993-10-0404 October 1993 Insp Rept 50-155/93-15 on 930824-0914.Violations Noted Are Being Considered for Escalated Ea.Major Areas Inspected: Conditions Surrounding Hydrostatic Primary Sys Test & Breach of Containment Integrity W/Concurrent Mode Change at Plant IR 05000155/19930161993-10-0404 October 1993 Insp Rept 50-155/93-16 on 930913-17.No Violations Noted. Major Areas Inspected:Inservice Testing Program,Program on Check Valves & License self-assessment IR 05000155/19930111993-09-0909 September 1993 Insp Rept 50-155/93-11 on 930716-0827.No Violation Noted. Major Areas Inspected:Operational Safety Verification,Esf Sys Walkdowns,Maint & Surveillance Activities,Engineering & Technical Support Activities & Safety Assessment ML20057A1311993-09-0808 September 1993 Insp Rept 50-155/93-10 on 930809-20.Violations Noted.Major Areas Inspected:Conditions Surrounding 930708 Event Re Both Containment High Pressure Sensors Outside Allowable TS Tolerances Due to Installation Error IR 05000155/19930121993-08-31031 August 1993 Insp Rept 50-155/93-12 on 930809-13.No Violations Noted. Major Areas Inspected:Radiation Protection Program During Outage IR 05000155/19930091993-07-19019 July 1993 Insp Rept 50-155/93-09 on 930712-14.No Violations or Deviations Noted.Major Areas Inspected:Review of Programs, Procedures,Observation of Work Activities,Data Review & Erosion/Corrosion Program IR 05000155/19930081993-07-12012 July 1993 Insp Rept 50-155/93-08 on 930621-25.One non-cited Violation Noted.Major Areas Inspected:Rp Program & Gaseous & Liquid Radwaste Program,Including Mgt Control & Organization & Internal & External Exposure IR 05000155/19930061993-05-28028 May 1993 Insp Rept 50-155/93-06 on 930407-0525.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Activities,Engineered Safety Feature Sys Walkdown & Outage & Planning Control IR 05000155/19930041993-04-0909 April 1993 Insp Rept 50-155/93-04 on 930322-26.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise,Including Review of Exercise Scenario & Followup on Licensee Actions on Previous Insp Findings IR 05000155/19930051993-03-31031 March 1993 Insp Rept 50-155/93-05 on 930322-26.No Violations Noted. Major Areas Inspected:Physical Security Insp Involving Mgt Support,Protected & Vital Area Barriers,Detection & Assessment Aids,Access control-personnel & Packages IR 05000155/19930021993-02-19019 February 1993 Insp Rept 50-155/93-02 on 930105-0216.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Activities,Safety Assessment & Quality Verification & Followup of LERs IR 05000155/19920251992-12-0101 December 1992 Insp Rept 50-155/92-25 on 921116-20.No Violations Noted. Major Areas Inspected:Organization,Reactor Sys Water QC Programs Qa/Qc Program in Lab & Nonradiological Confirmatory Measurements IR 05000155/19920241992-11-25025 November 1992 Insp Rept 50-155/92-24 on 921020-1123.No Violations Noted. Major Areas Inspected:Maint & Surveillance Activities, Evaluation of Licensee self-assessment Capability & Cold Weather Preparations IR 05000155/19910021991-02-22022 February 1991 Safety Insp Rept 50-155/91-02 on 910101-0211.No Violations Noted.Major Areas Inspected:Functional Areas,Surveillance Activities on Various Sys,Maint Activities on Various Components,Core Spray Sys & Liquid Poison Sys IR 05000155/19900211990-12-19019 December 1990 Safety Insp Rept 50-155/90-21 on 901009-17 & 1210.No Violations or Deviations Identified.Major Areas Inspected: Inservice Insp Activities Including Review of Programs, Procedures,Data & Observation of Work Activities 1999-09-30
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000155/19990051999-09-30030 September 1999 Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted.Major Areas Inspected: Routine Decommissioning Insp Covered Aspects of Facility Mgt & Control & Decommissioning Support Activities IR 05000155/19990041999-08-12012 August 1999 Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted. Major Areas Inspected:Aspects of Facility Mgt & Control, Decommissioning Support Activities Including Security, Spent Fuel Safety & Radiological Safety IR 05000155/19990031999-06-21021 June 1999 Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19990021999-04-26026 April 1999 Insp Rept 50-155/99-02 on 990226-0415.No Violations Noted. Major Areas Inspected:Aspects of Facility Mgt & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19990011999-03-19019 March 1999 Insp Rept 50-155/99-01 on 990113-0225.One non-cited Violation Noted.Major Areas Inspected:Aspects of Facility Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980091999-01-15015 January 1999 Insp Rept 50-155/98-09 on 981201-990112.No Violations Noted. Major Areas Inspected:Licensee Management & Control, Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000155/19980081998-12-0303 December 1998 Insp Rept 50-155/98-08 on 980827-1130.No Violations Noted. Major Areas Inspected:Radiological Safety IR 05000155/19980071998-10-14014 October 1998 Insp Rept 50-155/98-07 on 980827-1007.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Physical Security,Spent Fuel Safety & Radiological Safety IR 05000155/19980061998-09-0303 September 1998 Insp Rept 50-155/98-06 on 980716-0826.No Violations Noted. Major Areas Inspected:Aspects of Licensee Mgt & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety ML20195C6211998-08-18018 August 1998 EN-98-059,informing Commission That Staff Intends to Exercise Broad Discretion Pursuant to Section VII.B.6 of Enforcement Policy & Not Issue NOV or Propose Civil Penalty for Severity Level II Violation Identified by Licensee IR 05000155/19980051998-07-24024 July 1998 Insp Rept 50-155/98-05 on 980528-0715.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980021998-04-21021 April 1998 Insp Rept 50-155/98-02 on 980203-0406.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19970151998-02-14014 February 1998 Insp Rept 50-155/97-15 on 971205-980202.Violations Noted. Major Areas Inspected:Facility Management & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety ML20202J8471998-02-14014 February 1998 Notice of Violation from Insp on 971205-980202.Violation Noted:Chemical Decontamination Worker Working Under RWP B982035 in High Radiation Area for Approx 55 Minutes & Did Not Monitor Dosimetry Time ML20199A2571997-12-30030 December 1997 EN-97-117:on 980105,informs Commission That Order Prohibiting Involvement in NRC-licensed Activities Issued to Dt Rich.Action Based on Investigation Conducted by Oi,Which Determined on 960721 & 0915,DT Rich Falsified Records ML20197E5901997-12-17017 December 1997 Insp Rept 50-155/97-13 on 971008-1204.Violations Noted. Major Areas Inspected:Major Aspects of Licensee Decommissioning Activities,Including Facility Mgt & Control, Decommissioning Support & Spent Fuel Safety Controls IR 07100008/20120041997-12-17017 December 1997 Notice of Violation from Insp on 971008-1204.Violation Noted:On 971029,items Hanging from Spent Fuel Pool Rail Span 19 Had Combined Weight of 497 Pounds.Length of Time That Weight on Rail Exceeded Weight Restriction Not Determined IR 05000155/19970101997-11-26026 November 1997 Insp Rept 50-155/97-10 on 970802-1007.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20199J4571997-11-19019 November 1997 Notice of Violation from Insp on 961216-971107.Violations Noted:Certain Radiation Surveys Required by Station Procedure RP-29,not Completed.Also Certain Radiation Survey Records Required to Be Maintained,Not Accurate IR 05000155/19970121997-10-17017 October 1997 Insp Rept 50-155/97-12 on 970812-1007.Violations Noted.Major Areas Inspected:Miscellaneous Security & Safeguards Issues IR 05000155/19970091997-10-0909 October 1997 Insp Rept 50-155/97-09 on 970617-0804.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering ML20211J7341997-10-0606 October 1997 Notice of Violation from Insp on 970902-05.Violation Noted: on 970902,maintenance Worker Preparing to Participate in Reactor Head Detensioning Operations Laid Down in Contaminated Area for Several Minutes ML20217K5521997-08-12012 August 1997 Notice of Violation from Insp on 970303-0428.Violations Noted:Licensee Failed to Properly Evaluate Potential Radiological Hazards Associated W/Transfer of Highly Contaminated Filters ML20217J3391997-08-12012 August 1997 Notice of Violation from Insp on 970303-0428.Violation Noted:On 970202 Rj Flowers,Employee of Consumers Power Co, Did Not Exit High Radiation Area After Receiving Alarm on Electronic Dosimeter as Required ML20151J7721997-07-22022 July 1997 Notice of Violation from Insp on 970430-0616.Violation Noted:Inspector Identified That on 960403 & 970502,seven & Five CRDs Respectively Were Left After Insertion Time Testing W/Insert Speeds Greater than 28 IR 05000155/19970081997-07-22022 July 1997 Insp Rept 50-155/97-08 on 970430-0616.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-III-97-055, on 970611,decision to Permanently Shut Down Plant Three Yrs Before Expiration of Operating License in Yr 2000.Capacity of 67 Megawatts & Future Needed Improvements Would Be Too Expensive.State of Mi Will Be Informed1997-06-11011 June 1997 PNO-III-97-055:on 970611,decision to Permanently Shut Down Plant Three Yrs Before Expiration of Operating License in Yr 2000.Capacity of 67 Megawatts & Future Needed Improvements Would Be Too Expensive.State of Mi Will Be Informed ML20140G8851997-06-10010 June 1997 Notice of Violation from Insp on 970313-0429.Violation Noted:Procedures Were Not Followed,In That Required Working Clearances & Protective Tagging Were Not Obtained by Workers Prior to Performing Work Activities ML20140G8931997-06-10010 June 1997 Insp Rept 50-155/97-04 on 970313-0429.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000155/19970071997-06-0606 June 1997 Insp Rept 50-155/97-07 on 970426-0501.No Violations Noted. Major Areas Inspected:Licensee Fire Protection Program IR 05000155/19970061997-05-23023 May 1997 Insp Rept 50-155/97-06 on 970428-0502.No Violations Noted. Major Areas Inspected:Review of Vehicles Barrier Sys,Audits & Self Assessment,Testing,Maint,Security Contingency Capability & Protected Area Detection ML20141J9951997-05-19019 May 1997 Insp Rept 50-155/97-05 on 970303-0428.Violations Noted. Major Areas Inspected:Event in Which Workers Entered Power Block While Reactor at 9% Power Level Prior to Performance of Adequate Evaluation of Area Radiological Conditions IR 05000155/19970031997-05-13013 May 1997 Insp Rept 50-155/97-03 on 970331-0404.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program PNO-III-97-012, on 970224,licensee Notified NRC Resident Inspector Ofc That Loose Radioactive Surface Contamination Spread Throughout Turbine Bldg,During Transfer of Radwaste Processing Filters from Temporary Storage Barrel1997-02-26026 February 1997 PNO-III-97-012:on 970224,licensee Notified NRC Resident Inspector Ofc That Loose Radioactive Surface Contamination Spread Throughout Turbine Bldg,During Transfer of Radwaste Processing Filters from Temporary Storage Barrel IR 05000155/19960121997-02-24024 February 1997 Insp Rept 50-155/96-12 on 961130-970117.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20135D4431997-02-24024 February 1997 Notice of Violation from Insp on 961130-970117.Violation Noted:Use of Inappropriate Surveillance Procedure Causing Uncontrolled Leak & Inline Relief Valve Lifting Due to Failure to Remove Installed Blank Flange IR 05000155/19960011997-01-29029 January 1997 Insp Rept 50-155/96-01 on 961019-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20134C9421997-01-29029 January 1997 Notice of Violation from Insp on 961019-1129.Violations noted:961108 Operators Closed EC Number 1 Loop Inlet Valve (MO-7062) Making Number 1 EC Loop Inoperable & Operability Test Number 2 EC Loop Outlet Valve Not Performed within 1 H ML20133C5111997-01-0202 January 1997 Notice of Violation from Insp on 961202-06.Violation Noted: High Radiation & Contaminated Areas Was Not Posted W/Signs Bearing Radiation Symbol ML20133C5231997-01-0202 January 1997 Insp Rept 50-155/96-11 on 961202-06.Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry Controls,Status of Rp&C Facilities & Equipment IR 05000155/19960071996-12-0606 December 1996 Insp Rept 50-155/96-07 on 960909-12.No Violations Noted. Major Areas Inspected:Emergency Plan & Procedures IR 05000155/19960061996-10-28028 October 1996 Insp Rept 50-155/96-06 on 960727-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support PNO-III-96-064, on 961023,shutdown for Evaluation of Environ Qualification Data Made.Licensee Performed Preliminary Assessment of Effect of Higher than Anticipated Temp Profile on safety-related Electrical Equipment Located1996-10-24024 October 1996 PNO-III-96-064:on 961023,shutdown for Evaluation of Environ Qualification Data Made.Licensee Performed Preliminary Assessment of Effect of Higher than Anticipated Temp Profile on safety-related Electrical Equipment Located IR 05000155/19960051996-09-20020 September 1996 Insp Rept 50-155/96-05 on 960608-0726.No Violations Noted. Continued Attention Needed on Maint Work on Plant TS Required Equipment.Major Areas Inspected:Engineering,Maint, & Plant Support PNO-III-94-039, on 940517,two Persons,Russian Visitor & Interpreter Were Killed in Traffic Accident Near Charlevoix,Mi.Cause of Accident Under Investigation1994-05-18018 May 1994 PNO-III-94-039:on 940517,two Persons,Russian Visitor & Interpreter Were Killed in Traffic Accident Near Charlevoix,Mi.Cause of Accident Under Investigation ML20029E8381994-05-12012 May 1994 Notice of Violation from Insp on Stated Date.Violation Noted:On 940322,licensee Failed to Ensure That VTG-1A Was Open Before Resetting Ipr IR 05000155/19940061994-05-12012 May 1994 Insp Rept 50-155/94-06 on 940321-25.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program IR 05000155/19940071994-05-12012 May 1994 Insp Rept 50-155/94-07 on Stated Date.Violations Noted.Major Areas Inspected:Operational Safety Verification,Engineered Safety Feature Sys Walkdown,Maint & Surveillance,Engineering & Plant Support Activities IR 05000155/19930191993-12-21021 December 1993 Insp Rept 50-155/93-19 on 931020-1214.Violations Noted.Major Areas Inspected:Operational Safety Verification,Engineered Safety Feature Sys Walkdowns & Maint & Surveillance Activities ML20059C1031993-12-21021 December 1993 Notice of Violation from Insp on 931020-1214.Violation Noted:Results of Static Votes Testing at Final Asleft Torque Switch Setting for MO-7053 Were Not Evaluated Prior to Return to Svc of Valve 1999-09-30
[Table view] |
Text
_ _
__
._.
.. _ _ _
._..
.. _ _ _
.
. _ _ _ _.
...,
____ ___-
.
.
U.S. NUCLEAR REGULATORY COMMISSION REGION lli
,
Docket No:
50-155 License No:
DPR 6 l
Report No:
50-155/97003(DRS)
l Licensee:
Consumers Energy Facility:
Big Rock Point Location:
10269 U.S. 31 North Charlevoix, MI 49720 Dates:
March 31 - April 4,1997 Inspectors:
Robert D. Jickling, Emergency Preparedness Analyst James E. Foster, Sr. Emergency Preparedness Analyst Approved by:
James R. Creed, Chief, Plant Support Branch 1 Division of Reactor Safety l
!
9705200154 970513 PDR ADOCK 0500
0
.
.
_
_
..
__ _
.
._
_. _. _.. _ _ _ _ _ _ _. _ _. _. _ _ _ _ _ _ _
. - _. ~.. - _.
-
!
!
'
.
EXECUTIVE SUMMARY l
Big Rock Point NRC Inspection Report 50-155/97003
,
This inspection included a review of the Emergency Preparedness (EP) program, an aspect of Plant Support. This was an announced inspection conducted by two regional emergency preparedness analysts.
The emergency preparedness program was effective in maintaining the operational readir.ess of your emergency response facilities, equipment, and personnel. Emergency response facilities, equipment, and supplies were in a very good state of operational readiness. Interviews with emergency response personnel demonstrated very good knowledge of emergency implementing procedures and responsibilities. Management i
support had been strong and no unfavorable changes were identified.
l The overall effectiveness of the licensee's emergency preparedness facilities,
equipment, training, and organization was very good. (Sections P2.1, P3, PS, and P6)
Licensee personnel performed conservatively during actual activations of the
Emergency Plan and provided timely notifications to offsite agencies. (Section P1.1)
The emergency response facilities were well maintained and in very good material
condition. (Section P2.1)
Interviews with key emergency response organization personnel demonstrated very
good knowledge of the emergency implementing procedures and their responsibilities. (Section P5)
Quality assurance oversight of the EP program was good and included a low
threshold for identifying issues. (Section P7)
The inspectors completed Temporary instruction 2515/134 "Onshift Dose
Assessment Capabilities" and verified that the licensee's capabilities met requirements. (Section P9)
,
!
!
1
-
__._
_ ___._.-.
.. _. _ _. _ _ _. - _ - _..... _ _ _ _. _ _. _ _ -. _ -
__
$
.
)
l Report Details
IV. Plant Suncort E
P1 Conduct of Emergency Preparedness (EP) Activities P1.1 Actual Emeroency Plan Activations
i a.
Insoection Scone (8270U -
i The inspectors reviewed records and documentation packages regarding plant
.
l response for three actual emergency events which occurred Ating 1996.
b.
Q)servations and Findinas
.
An Unusual Event was declared at 8:25 p.m. on February 29,1996, due to a small
!
fire on the turbine deck. The fire (possibly due to an oil soaked rag falling on a
piece of insulation) occurred in a narrow gap several feet below the front end
.
turbine stand. The fire was identified at '7:45 p.m., extinguished at approximately i
7:55 p.m., and the Shift Supervisor was advised the fire was extinguished at 8:05 p.m. Due to the fire lasting approximately ten minutes, an Unusual Event was
.i declared per emergency implementing procedure EPIP-1, " Activation of the Emergency Plan." The event was terminated at 10:36 p.m.
}
The licensee's review of the event identified that the sequence of emergency-I notifications made to offsite agencies was ir correct. After the State of Michigan was called, notifications were made to the NRC instead of the county. Although notifications were conducted out of sequence, the offsite agencies were notified within the required times.
An Unusual Event was declared at 11:00 a.m. on May 3,1996, due to a partial loss of commercial and dedicated communications lines. At approximately 8:15 a.m., control room personnel identified failures of the telephones and declared the telephone systems inoperable at 8:30 a.m. Non-emergency notifications were made to the NRC at 9:00 a.m. and the State of Michigan at 10:15 a.m. At 10:51 a.m., the site was informed by Ameritech that a fiber optics cable had been severed.
At the time of this event, the Big Rock Point Emergency Plan and Emergency Plan Implementing Procedures (EPIPs) did not include an Emergency Action Level (EAL)
for loss of communications capability. Discussions with personnel at the Palisades plant indicated that Palisades and other facilities had EALs for loss of communications. Concerns were identified regarding the inability to notify local agencies for emergency conditions and the inability to callout emergency response organization (ERO) personnel to augment shift staffing during an emergency. The decision was made by management to classify the event as an Unusual Event and notify accordingly, in response to this incident, two cellular telephones were used from the Shift Supervisor's office and additional cellular phones were delivered to the site. Plant
.
._
.._,._
-.
.
_ _..._._
_ ___-.._ _ _
_
_. _ _ _
.. _ _ _ _._._.
- _ _ -._ _
-
personnel were also sent to the Emergency Operations Facility (EOF) to establish communications links with offsite agencies. The event was terminated at 1:42 l
p.m. when service was restored. Additional actions taken included revision of EPIP-1, " Activation of Emergency Plan," dated November 19,1996, to include a loss of offsite communicdons EAL.-
An Unusual Event was declared at 11:00 p.m. on October 27,1996, due to a threatening telephone call. - Three consecutive telephone calls were made to the
j control room with the last call containing a vague threat. The Unusual Event was i
terminated at 1:05 a.m. on October 28,1996, when no further calls were received.
The thres events had been reviewed and detailed packages were compiled by the
}
Emergency Preparedness (EP) Supervisor to docums:nt the reviews. The review
packages contained descriptions of the events, ar,sessments of the adequacy of the response, observations, and recommendations.,ilthough the licenes did not have
,
l a procedure for assessing and documenting resocnse to actual emergency plan i
l activations, the event review packages were detailed, comprehensive, and i
appropriately distributed to licensee management.
c.
Conclusions i
!
'
The inspectors concluoed that the licensee had conservatively implemented the
,
emergency plan in declaring three Unusual Events. The EP Supervisor's reviews of i
the events were detailed, comprehensive, and well doc. mnted.
i P2 Status of EP Facilities, Equipment, and Resources I
i j
P2.1 Material Condition of Emeroency Resoonse Facilities a.
insoection Scone (82701)
The inspectors evaluated the material condition of the Control Room, Technical
.
Support Center (TSC), Operations Support Center (OSC), and EOF. The offsite
!
- team kits were also inspected. The licensee demonstrated the operability of
numerous pieces of equipment, including survey equipment, communications
}
equipment, and computers.
-
/
b.
Observations and Findinas
Current copies of the EPIPS were available in the Control Room and Shift Supervisor's office. The TSC and associated kits were in excellent material condition. Status boards and equipment were in a state of readiness. The OSC was in good material condition and status boards were readily located under the stairs. The specific location for storage of OSC status boards had been incorporated into the EPIPs and reenforced during training drills to correct an issue identified during the 1996 EP exercise. The EOF was in very good material condition. The dose assessment computers and printers were verified operable and communications systems were functional. Offsite team kit instruments and equipment were calibrated, functional, and in very good order. Several minor
___ _,
~_ _ _ _. _ _ _. _ _ _ _. _ _._. _ _. - _. _ _. _ _ _
i
-
procedural inconsistencies identified by the inspectors were immediately corrected by the EP Supervisor.
Records for the early warning sirens for 1996 were reviewed by the inspectors.
Reported annual operability for 1996 was 99.3 percent, with 92 percent for the lowest month's average. Siren operability exceeded the acceptability limit of greater than or equal to 90 percent.
c.
Conclusic it l
Overall, the emergency response facilities were in very good material condition.
l Several minor procedural inconsistencies were immediately corrected by the EP supervisor. Numerous instruments and equipment were demonstrated and found to i
be functional. The emergency warning sirens had been appropriately maintained.
l
. P3 EP Procedures and Documentation i
a.
Inspection Scone (82701)
The inspectors reviewed a selection of licensee emcrgency procedures and EPIPs.
i Condition Reports (CRs) assigned to the EP Supervisor were also reviewed. EPIPs and emergency plan sections reviewed including Emergency Plan Chapter 8,
!
Revision 123, " Maintaining Emergency Preparedness," EPIP-61, Revision 163,
" Training and Drills," EPIP EOF-7, Revision 9, " Health Physics," EPIP-3C, Revision 163, " Activation of the EOF," EPIP-38, Revision 175, " Activation of the OSC," and EPIP-4A, Revision 167, " Site Emergency Director."
b.
Observations and Findinas EPIP-3B had been revised to include the s't: race locctinr fer OSC status boards, and designate an alternate location (access control) for the OSC if the primary OSC (machine shop) and secondary location (compressor room) were unusable. The procedure appropriately included arrangement diagrams for the various facilities when utilized as an OSC.
Discussion with the EP Supervisor indicated that the State of Michigan was working with the nuclear power plants in the state to develop and implement a new Protective Action Recommendations format. The new format woulel utilize I
subareas rather than affected sectors and would facilitate local govsrnment determination of areas to be evacuated or sheltered, using geopolitical boundaries.
The inspectors reviewed several EP related CRs in various stages of completion.
Two of the CRs reviewed included inspection followup items from the 1996 EP exercise and differences between Palisades and Big Rock Point's EALs to determine i
any changes that were necessary. The tracking system effectively identified responsible individuals, due dates, and current status.
!
l
- -
... - -
-
-.....,..,. -
-
.. - - - - -,, - -
.
....
..
.-
.e
- r
-.,.
_
. _. _..
_ _ _ _. _ _ _ _ _ _ _
.
_ _ _ _.
. _.. _. _ _ _ - _ _ _
.
.
>
.
l c.
Conclusions
The EPIPs were clear and easy to use. The CR system was effective fc assigning responsibility, tracking, and closing EP related issues. No problems were identified
'
in the procedures or documents reviewed.
'
'
Pfi Staff Trainlag and Qualification in EP l
a.
Insnection Scone (82701)
The inspectors reviewed the licensee's EP training program. This included
intervi6ws with selected key individuals, training attendance records, and the
,
!
!
" Telephone List For TSC/OSC/ EOF Activatica For March 1997." Additionally, selected training instructor's guides were reviewed, including N00108, Revision 5,
" Emergency Dose Assessment."
!
b.
Observations md Findinas
}
j interviews with key emergency response organization personnel indicated very good
knowledge of emergency procedures and responsibilities. Good knowledge related
'
<
to the NRC's and Department of Energy's incident response was demonstrated by
'
i the Site Emergency Director (SED). Federal incident response information had been
incorporated into the licensee's Emergency Plan, training lesson plans, and a i
memorandum that issued to the EOF directors, and SEDs at the site.
l Training records compared to the activation telephone list indicated all ERO
'
personnel reviewed were currently qualified.
.
Discussion with the EP Supervisor indicated that new quarterly drills and tabletop
training had been conducted. Additionally, the SEDs had participated in licensed operator requalification simulator training. Operations personnel provided positive
.
'
feedback to the EP Supervisor on this trainhg.
c.
Conclusions I
Overall, EP training was considered very good. Critique documentation was available and critique forms were adequately detailed. Training records were complete and interviewed individuals were knowledgeable about their ERO responsibilities.
P6 EP Organization and Administration (82701)
a.
Insoection Scone (82701)
The inspectors and EP staff discussed the current station organization and reviewed then current organizational chart.
.
-
. --
_..
...
.
- _ __. _
_.
.
_
_ _. _. _ _
_
_
__
_ _ _ _
,
-
l
b.
Observations and Findinos
'
rha Emergency Preparedness Supervisor now reported to the Plant Manager, who reported to the General Manager, who reported to the Senior Vice President of Generations. Discussion with the EP Supervisor indicated that management support d
for the EP program was excellent under the past and current plant organizat'.on.
l
!
Due to recent organizational changes, Site Emergency Plan (SEP), Chapter 5, Revision 126, Figure 1, " Big Rock Point Plant Organization," was no longer current.
.
i The inspectors discussed the figure with EP personnel and determined that a
revision was in process.
Support for some aspects of the Big Rock Point Emergency Preparedness program
)
was supplied by EP personnel from the Palisades plant. A Big Rock Point / Palisades EP Support Agreement Specification provided details of which aspects of the
program will be performed by Palisades personnel. One example of provided
support was that annual reviews of the Site Emergency Plan were assigned to Palisades personnel.
!
c.
Conclusions s
. Management support to the EP program continued to be strong. A significant
support agreement had been finalized with Palisades plant EP personnel which-
provided needed assistance for specific EP responsibilities.
,
P7 Quality Assurance in EP Activities
!.
P7.1 Audits (82701)
i
a.
Insoection Scone (82701)
The inspectors reviewed Quality Assurance Department Audits which have been performed since the last routine inspection.
b.
Observations and Findinas 3-The inspectors reviewed Nuclear Performance Assessment Department (NPAD)
g report PA-96-04, Big Rock Point Emergency Preparedness Audit, dated May 10, i
j 1996. This audit was conducted by two auditors during March 25-29,1996.
i l
Also reviewed was NPAD report NPAD/P-96-018, State and Local Government
Emergency Preparedness Interfaces," issued January 13,1997. This audit was
performed during December 16-20,1996. The audit concluded that the emergency
-
preparedness program was effectively implemented.
i
!
J The inspectors also reviewed NPAD Field Monitoring Report FM-B-96-164, I
documenting evaluation of the Big Rock Point 1996 exercise controller's briefing.
.
At the time of this inspection, the 1997 BRP Emergency Planning Audit had been completed, but the report had not been finalized. An audit debriefing had been held
__
_
-
-.
-. - -
.
_ _
,
__ _ _ _
_
- _ _. _._ _ _ _ _.___._.__.. ____
_ _ _ _ _ _ _ _ _
l i
.
L o
j on March 21,1997. A summary of the audit debriefing meeting indicated that the
assessment was that the program continued to be effecuvely implemented.
Interfaces with offsite authorities were good. Two open items were opened
-
regarding a procedure update and emergency kit inventory deficiencies, and one cono'+ ion report was open regarding corrective actions on medical drill deficiencies.
,
c.
Conclusions
!
The licensee's 1996 audits of EP sctivities were effective and satisfied the requirements of 10 CFR 50.54(t).
'
P8 Miscellaneous EP issues
!
)
j.
(Closedl Insoection Follow-un item 50-155/95008-04: Federal incident response l
information needed in training. This item is closed.
'
(Closed) Insoection Follow-un item 50-155/96007-03: Unable to locate OSC status
'
l boards. All OSC boards were relocated to the stairs in the ma2ine shop.
Discussion indicated that this location was reviewed with exercise participants during a February 18,1997 OSC drill. OSC status boards were readily located
under the stairs as indicated in the OSC procedure. Thia item is closed i
,
j (Closed) Insoection Followun item 50-155/95008-05: Resolution of Meteorological i
tower inaccuracies. Condition Report C-BRP-95-309 was written to track identified
meteorological tower inaccuracies (plant stack effects). It was determined that the
!
current meteorological instrumentation, in conjunction with weather information
!
from Pollston, MI, provided the most accurate meteorological information for the j
site. As the wind direction could be inaccurate from certain directions, additional sectors were to be added if the wind was from the West, North Northwest, or %
-
j West Northwest.
- A meeting was conducted with personnel from the State of Michigan. It was
agreed that implementation of the proposed protective action recommendations was appropriate and would not cause undue problems in a real event.
Attachment 1 to EPIP-58, " Protective Action Recommendations for Offsite i
Populations," Revision 167, dated July 19,1995 had been appropriately modified.
!
Documentation reviewed indicated that reading packages containing the procedure
revisions had been provided to response personnel on July 17,1995. This item is i
i closed.
i
!
(Onen) Insoection Followuo item 50-155/96007-01: Slow TSC initial notification to
offsite. Condition Report C-BRP-97-825 identified turnover from the simulated
control room. A comprehensive assessment of communications issues was in
progress with several recommendations for 1,mprovement under review. This item j
will remain open.
!
(Onen) Insoection Followuo item 50-155/96007-02: Delayed dispatch of OSC
,
teams. Discussion indicated that this was covered in the February 18,1997 OSC i
i
,
.-
.
.
.
_
.
.,
.-.
.-
.. -
-
.
-... -. - -
-_.
._
- -. -.
.
-- -
_
!
.
i
.
drill and was scheduled to be reviewed in subsequent drills. This item will remain l
open.
'
P9 Temporary Instruction 2515/134 Onshift Dose Assessment l
a.
Insoection Scone
,
.
The inspectors discussed onshift dose assessment capability and provisions with licensee personnel, reviewed the Emergency Plan and Emergency Plan implementing Procedures (EPIPs), and inspected the equipment utilized for dose assessment.
l
b.
Observations and Findinas
!
The Big Rock Point Site Emergency Plan, Section 1.0, " Organizational Control of
!
Emergencies,' Section 1.1.2.a, "On-shift Organization," indicated that the Shift
]
Supervisor was capable of performing dose assessment.
.
EPIP-4A, " Site Emergency Director " indicated that the Shift Supervisor would become the Site Emergency Director (SED) until relieved of SED responsibilities by the Plant Manager. Attachment 4A-1, " Mandatory Actions by Emergency
,
'
Classification," listed performing dose assessment for actual or potential
,
radiological releases as a mandatory action for the Alert classification level or
.l higher.
EPIP 4F, " Health Physics Group Leader," provided for the Health Physics Group Leader to proceed to the TSC and assure calculations estimating offsite dose are
'
performed every fifteen minutes until the EOF HP Support Team is activated to assume this responsibility.
j
EPIP 4G, "On-Call Dose Assessor," provided guidence in developing an assessment of offsite dose and directing the offsite radiological monitoring team. The on-call dose assessor, if on shift, was to report to the TSC; if on-call, come to the plant and report to the TSC. The on-shift Dose Assessor's primary duties included performing dose calculations using EPIP 5A, request and provide direction for the off-site radiological monitoring teams.
EPIP 5A, " Estimation of Offsite Dose," Revision 98, provided guidance on performing calculations of offsite dose. The procedure provided for two methods of estimating offsite dose, an IBM PC automated dose assessment program,"Offsite",
and a manual calculation backup method.
Comprehensive manuals for the "Offsite" dose assessment system and segmented gaussian plume model (utilized at the EOF) were available. The Offsite dose model was Version 4.2, dated March 21,1995.
i
l c.
Conclusion l
The Emergency Plan and EPIPS contained provision = for enshift dose assessment.
'
Needed equipment and personnel training were provided. Personnel were j
knowledgeable of their res,T sibilities and how to perform dose assessment. The
.
_..
. - -..
_,_
_ _ _.
..
..
_
,.
s
.. _ _ - _. _. _..
_.. _ _ _. _.
.
_.. _ _ _ _. _ _. _ _ _. __
_. _ _ -
_ _.. _
.
.
.
I acceptance criteria for the Tl were met and this Tl is closed. Documentation as to
'
'
these findings is attached as Attachment A.
P10'
Review of UFSAR Commitments a.
Inspection Scope A discovery of a licensee operating their facility in a manner contrary to the Updated Final Safety Analysis Report (UFSAR) description highlighted the need for
a special focused review that compares plant practices, procedures, and parameters to the UFSAR descriptions. While performing the inspections discussed in this report, the inspectors reviewed the applicable portions of the Big Rock Point Updated Final Hazards Summary Report (UFHSR) that related to Emergency
!
Preparedness.
b.
Observations and Findir.as UFHSR Chapter 13, " Conduct of Operations," Revision 6, Section 13.3, pertained to Emergency Planning. Section 13.3.1, " Site Emergency Plan," incorporated the Site Emergency Plan by reference. UFHSR Section 13.3.2 pertained to the Site Emergency Plan implementing Procedures, noting that they had been developed and l
implemented, but were not considered a part of the UFHSR.
c.
Conclusions Overall maintenance of the Emergency Preparedness sections of the UFHSR was good. Licensee actions were consistent with UFHSR commitments.
i
'
X1 Exit Meeting Summary The inspectors presented the inspection results to members of licensee management at the conclusion of the inspection on April 4,1997. The licensee acknowledged the findings presented.
The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
l l
!
,_
_ -. _ _
_ _ _.-
_
..
,
_ -
.
.
._
.. -
-.
.._-. _ _ - - -
- -
..
_
.. _ -... -.. -. -. - _
-
.
-
-
.
PARTIAL LIST OF PERSONS CONTACTED Licensee R. Addy, Plant Manager
,
J. Boss, Operations Manager M. Bourassa, Acting Licensing Manager E. Karpe, Emergency Preparedness Section Supervisor K. Pallagi, Chemistry / Health Physics Manager K. Penrod, Emergency Preparedness K. Powers, General Manager K. Wooster, Senior Nuclear Emergency Planner INSPECTION PROCEDURES USED IP 82701 Operational Status of the Emergency Preparedness Program Tl 2515/134 Temporary Instruction, Onshift Dose Assessment ITEMS OPENED, CLOSED, AND DISCUSSED CLOSED 50-155/95008-04 IFl Federalincident response information needed in training.
50-155/96007-03 IFl Unable to locate OSC status boards.
50-155/95008-05 IFl Resolution of Meteorological tower inaccuracies.
DISCUSSED 50-155/96007-01 IFl Slow TSC initial notification to offsite.
50-155/96007-02 IFl Delayed dispatch of OSC teams.
i
- _,
-.
._
-
.
.
LIST OF ACRONYMS USED BRP Big Rock Point CFR Code of Federal Regulations EAL Emergency Action Level EP Emergency Preparedness ENS Emergency Notification System EOF Emergency Operations Facility EPIP Emergency Plan implementing Procedure ERO Emergency Response Organization IR inspection Report IFl Inspection Followup item NPAD Nuclear Performance Assessment Department NRC Nuclear Regulatory Commission NUREG Nuclear Regulatory Commission document OSC Operational Support Center SED Site Emergency Director TS Technical Specification TSC Technical Support Center UFHSR Final Hazards Summary Report
-
- -
- -
.
-
'
r FORM FOR DOCUMENTATION OF ON-SHIFT DOSE ASSESSMENT CAPABOUTY
. -
-
.
Bia Rock Point / Unit 1/ 50-155 Consumers Power Comoany 10/11196 S!TE/ UNIT / DOCKET #s UCENSEE DATE
__
'
s
, +. m
- a3
_
2 -
1 DOSE ASSESSMENT COMMITMENT IN EMERGENCY PLAN
-
- M 4.01
.
- .-
- ' * W
.
m'
rw @ > - #
Acceptance Criteria Person (s) Contacted Position Title (s)
Plan Section Revision No.
Meets acceptance (Refer to page 1 of this Appendix for containing and Dato criterlo?
further detail on the acceptance criteria)
commitment
.
Karen Wooster EP Coordinator Chap 6. Subsectens Rev.124 of Not yet Sgrtion 4.01 Item 1 2.2; 2.3; 2.4 - Plan Chapters 5
,
Emergency Plan contains commitment for on-revision inineted to and 6; 7/96 shift dose assessment capabelity.
specife onshift person Karen Wooster EP Coordinator Chapter 6, Subsection Rev.124 of Yes Fection 4.01 Item 2 4.5 Chapter 6; Emergency Plan contains commitment for 7/96 backup dose assessrnent capability.
,
.
-
ye e
>
-
' 104.02'ON-SHIFT DOSE ASSESSMENT EMERGENCY PLAN IMPLEMENTING PROCEDURE D > -
-
l>
~
ew-
'
'
m
$N.,
'
' '
Person (s) contacted Position Title (s)
ProcedureAndscation Revision No.
Meets acceptance and Dato criteria?
i Karen Wooster EP Coordinator EPIP-4A; EPlP-4G Rev.167, Yes Section 4.02 Item 1 7/95; Rev.
]
Procedure initiates dose assessment 155, 7/95 Karen Wooster EP Coordinator EPIP-SA, Attachments vanous rev Yes
'
Section 4.02 Item 2 SA-1 through SA-9 numbers &
Indications initiate dose assessment dates
.
Karen Wooster EP Coordinator EPIP-5A, Attachments various rev Yes
Section 4.02 Item 3 5A-1 through 5A-9 numbers &
Procedure for performing dose assessment dates available.
- 04.03 ? ON-SHIFT DOSE' ASSESSMENT; TRAINING
' W ~~
4:m&*#2Gy
-
st
~ P
-
jym ~
,
-
~ gy
~
+
' ^
,
Person (s) contacted Position Title (s)
Personnel Trained Meets acceptance (Title /#1 cnteria?
'
Karen Wooster EP Coordinator Shift Supervisors; 10 n/a Yes Section 4.03 Item 1 On-shift Personnel trained for dose assessment inspector: Thomas Ploskt Reason llL DRS. Plant Suncort Br.1.
,
-
&
....
-
..o..
m
--. m.i.m.m
-
-
.
. m.2.m.a.
. m....
..
m m
--- -
.
o...
-mmm.
--
- o.--
-a.-.-
--am mM
-