Notice of Deviation from Insp on 860414-18 & 0519-23
ML20205G055
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/13/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20205G027 List:
References
50-313-86-14, 50-368-86-14, NUDOCS 8608190393
Download: ML20205G055 (2)


Text

__- -

APPENDIX B NOTICE OF DEVIATION Arkansas Power & Light Company Dockets: 50-313 Arkansas Nuclear One, Units 1 and 2 50-368 Licenses: DPR-51 .

NPF-6 Based on the results of an NRC inspection conducted on April 14-18 and .

May 19-23, 1986, a deviation from written commitments was identified. The deviation consisted of several examples of failure to provide supplemental information to the NRC as denoted in written correspondence. In accordance and Procedure for NRC Enforcement with the "10 Actions," General Statement CFR Part of Policy 2, Appendix C (1985), the deviation with several examples is listed below:

A. Arkansas Power & Light Company (AP&L) letter (1-010-4) dated January 7, 1980, committed to send the results of additional analyses of nonconformances of inaccessible systems found to be out of established tolerances no later than April 10, 1980.

$ In deviation from the above, this letter was never received by Region IV.

j (Unit 1 only) l B. AP&Lletter(1-020-11) dated February 12, 1980, committed to send the results of analyses of support loads for accessible piping by April 10, 1980.

In deviation from the above, this letter was never received by Region IV.

(Unit 1 only)

C. AP&L letters (1-129-6 and 2-129-6, item 5(d)) dated December 12, 1979, committed to send the results of field verification of anchor bolts installed prior to mid-1977 by March 24, 1980.

In deviation from the above, this letter was never received by Region IV. )

(Units 1 and 2)  !

1 D. AP&Lletters(1-129-79and2-129-79, item 5(a))datedDecember 12, 1979, l committed to provide the results of a field survey to identify concrete  !

block walls utilizing concrete expansion anchors to support Seismic Category 1 systems by February 10, 1980.

In deviation from the above, this letter was never received by Region IV. 1 (Units 1 and 2)

Arkansas Power & Light Company is hereby requested to submit to this office, within 30 days of the date of this letter transmitting this Notice, a written statement or explanation in reply, including for each deviation: (1) the 8608190393 860813 PDR ADOCK 05000313 G PDR

~~

reason for the deviation if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps'which will be taken to avoid further deviations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will 6e given to extending the response time. #

+

Dated at Arlington, Texas this 13th day of August 1986 t