Notice of Deviation from Insp on 870322-27
ML20214S513
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/01/1987
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20214S386 List:
References
50-368-87-06, 50-368-87-6, NUDOCS 8706090298
Download: ML20214S513 (1)


Text

. .

APPENDIX B NOTICE OF DEVIATION Arkansas Power and Light Company Docket: 50-368 Arkansas Nuclear One, Unit 2 License: NPF-6 Based on the results of an NRC inspection conducted on March 22-27, 1987, a deviation from the licensee's commitment to the NRC was identified. The devia+ ion involved the operating of the Radioactive Waste Storage Building (RWSB) without having radiological monitoring equipment and systems either installed, calibrated, and operational as committed to in the Final Safety Analysis Report (FSAR) for Unit-2. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986),

the deviation is listed below:

Failure to Install, Calibrate, and Operate Radiological Monitoring Systems Section 11.5.6 of the ANO Unit-2 FSAR states that the RWSB will be equipped with a radiation monitoring system consisting of area gamma detectors and airborne radioactivity monitors for exhaust ventilation ducts.

In deviation from the above, the NRC inspector determined on March 27, 1987, that the licensee had started operating the RWSB on or about November 1986, for storage of processed radioactive waste and had commenced processing of compatible radioactive waste in the RWSB on or about January 26, 1987, without the radiological monitoring systems installed, calibrated, and optrational. (368/8706-03)

Arkansas Power and Light is hereby requested to submit to this office, within 30 days of the date of this letter transmitting this Notice, a written statement or explanation in reply, including for each deviation: (1) the reason for the deviation if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further deviations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas this 1st day of June 1987 8706090298 670601 PDR ADOCK 05000345 O PDR