Corrected Pages to Insp Repts 50-313/98-07 & 50-368/98-07 on 980925.Typo Was Identified in Numbering of Insp Followup Sys Closed Items
ML20154L414
Person / Time
Site: Arkansas Nuclear  
Issue date: 10/15/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20154L404 List:
References
50-313-98-07, 50-313-98-7, 50-368-98-07, 50-368-98-7, NUDOCS 9810190283
Download: ML20154L414 (2)


Text

..

.. ~

,

.

..

-

.-

..

...

.

.-

- c.

-

.-:

,

ATTACHMENT PARTlAL LIST OF PERSONS CONTACTED i

Licensee

- B. Allen, Unit 2 Maintenance Manager

. C. Anderson, General Manager Plant Operations G. Ashley, Licensing Supervisor

'

- B. Bemant, Unit 2 Plant Manager B. Beard, Unit 2 Electrical Maintenance Superintendent R. Carter, Unit 1 Mechanical Maintenance Superintendent M. Chisum, Unit 2 System Engineering Manager M. Cooper, Licensing Specialist

'

P. Harris, Unit 1 Operations B. Haylock, Unit 1 Electrical Maintenance D. James, Licensing Manager J. Kowalewski, Unit 1 System Engineering Manager

. R. Lane, Design Engineering Director

- J. Vandergrift, Nuclear Safety Director R. Walters, Unit 1 Assistant Operations Manager i

' H. Williams, Plant Security Superintendent

'

- C. Zimmerman, Unit 1 Plant Manager

INSPECTION PROCEDURES USED l

' IP 61726:

Surveillance Observations

' IP 62707:

Maintenance Observations IP 71707:

. Plant Operations IP 71750:

- Plant Support Activities IP 92700:

Onsite Followup of Written Reports IP 92901:

Followup - Operations IP 92903:

- Followup - Engineering IP 93702:

Prompt Onsite Response to Events at Operating Power Reactors

.,

ITEMS CLOSED 50-368/9509-01 VIO Lack of Temporary Modification for Connecting Shutdown Cooling Heat Exchanger Service Water Drains j

(Section 08.2)

50-368/96-005-01 LER Surveillance Testing of Plant Protection System and

.

Postaccident Monitoring Instrumentation (Section M8.2)

!

~~

9810190283 981015 F

PDR ADOCK 05000313

'

!

G PDR j.;

..

.

.

._

.

-

.

_ _. _.

.. _..

~ _ _ _. -. _

__

..

__

,

.

.

.

-

,

-2.

50-313/96-010 LER Inadequate Procedure Revision Resulted in Not Having j

Tested the Reactor Protection System High Temperature l

Trip Function as Required by Technical Specifications

<

(Section M8.1)

i

.

-50-313/9701-01-IFl Administrative Control of Containment Penetration Vent j

and Drain Line Valves (Section 08.1)

i LIST OF ACRONYMS USED ALARA as low as is reasonably achievable EDG emergency diesel generator i

IFl inspection followup item JO.

~ job order LER licensee event report i

P&lD piping and instrumentation diagram RVLMS reactor vessel level monitoring system

!