Text
..
.. ~
,
.
..
-
.-
..
...
.
.-
- c.
-
.-:
,
ATTACHMENT PARTlAL LIST OF PERSONS CONTACTED i
Licensee
- B. Allen, Unit 2 Maintenance Manager
. C. Anderson, General Manager Plant Operations G. Ashley, Licensing Supervisor
'
- B. Bemant, Unit 2 Plant Manager B. Beard, Unit 2 Electrical Maintenance Superintendent R. Carter, Unit 1 Mechanical Maintenance Superintendent M. Chisum, Unit 2 System Engineering Manager M. Cooper, Licensing Specialist
'
P. Harris, Unit 1 Operations B. Haylock, Unit 1 Electrical Maintenance D. James, Licensing Manager J. Kowalewski, Unit 1 System Engineering Manager
. R. Lane, Design Engineering Director
- J. Vandergrift, Nuclear Safety Director R. Walters, Unit 1 Assistant Operations Manager i
' H. Williams, Plant Security Superintendent
'
- C. Zimmerman, Unit 1 Plant Manager
INSPECTION PROCEDURES USED l
' IP 61726:
Surveillance Observations
' IP 62707:
Maintenance Observations IP 71707:
. Plant Operations IP 71750:
- Plant Support Activities IP 92700:
Onsite Followup of Written Reports IP 92901:
Followup - Operations IP 92903:
- Followup - Engineering IP 93702:
Prompt Onsite Response to Events at Operating Power Reactors
.,
ITEMS CLOSED 50-368/9509-01 VIO Lack of Temporary Modification for Connecting Shutdown Cooling Heat Exchanger Service Water Drains j
(Section 08.2)
50-368/96-005-01 LER Surveillance Testing of Plant Protection System and
.
Postaccident Monitoring Instrumentation (Section M8.2)
!
~~
9810190283 981015 F
PDR ADOCK 05000313
'
!
G PDR j.;
..
.
.
._
.
-
.
_ _. _.
.. _..
~ _ _ _. -. _
__
..
__
,
.
.
.
-
,
-2.
50-313/96-010 LER Inadequate Procedure Revision Resulted in Not Having j
Tested the Reactor Protection System High Temperature l
Trip Function as Required by Technical Specifications
<
(Section M8.1)
i
.
-50-313/9701-01-IFl Administrative Control of Containment Penetration Vent j
and Drain Line Valves (Section 08.1)
i LIST OF ACRONYMS USED ALARA as low as is reasonably achievable EDG emergency diesel generator i
IFl inspection followup item JO.
~ job order LER licensee event report i
P&lD piping and instrumentation diagram RVLMS reactor vessel level monitoring system
!