Notice of Violation from Insp on 860414-18 & 0519-23
ML20205G034
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/13/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20205G027 List:
References
50-313-86-14, NUDOCS 8608190389
Download: ML20205G034 (1)


Text

.

APPENDIX A NOTICE OF VIOLATION Arkansas Power & Light Company Docket: 50-313 Arkansas Nuclear One, Unit 1 License: DPR-51 During an NRC inspection conducted on April 14-18 and May 19-23, 1986, a violation of NRC requirements was identified. The violation involved improper drawing control.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:

Improper Drawing Control Criterion V of Appendix B to 10 CFR 50 and Section 5 of the approved Arkansas Power and Light Company Quality Assurance Manual - Operations requires that activities affecting quality shall be prescribed by appropriate documented instructions, procedures, or drawings appropriate to the circumstances.

Contrary to the above, review of pipe drawings related to pipe supports and hanger locations did not assure that activities affecting quality were appropriately documented as evidenced by:

i 1.

Hanger GCB-1-H4 was misrepresented on hanger location drawing 7-DH-6 l

as DH-15 indicating a lack of information transfer.

2.

The file copy of hanger GCB-1-DH18 was not updated as required to reflect the changes instituted in DCP-80-D-1007DD.

This is a Severity Level IV violation.

(SupplementII.D)(50-313/8614-02)

Pursuant to the provisions of 10 CFR 2.201, Arkansas Power & Light Company is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation:

(1) the reason for the violations if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas, this 13th day of August 1986