ML20205C835

From kanterella
Jump to navigation Jump to search
Rev 2 to Emergency Operating Procedure EOP 35 FR-S.2, Response to Loss of Core Shutdown
ML20205C835
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 06/15/1988
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20204H467 List: ... further results
References
EOP-35-FR-S.2, NUDOCS 8810260581
Download: ML20205C835 (4)


Text

_

Stephen E.  : ace 3-31-87 87-12

,{ Form Approved by Station Sup3rintendent Effective Date 50RC Mtg. No.

STATION PROCEDURE COVER SHEET

[v A. IDENTIFICATION Number: E0P 35 FR-S.2 Rev. 2

Title:

RESPONSE TO LOSS OF CORE SHUTOOWN Prepared By: H. K. Covin B. REVIEW I have reviewed the abova procedure and have found it to be satisfactory.

T_ITLE SIGNATURE DATE DEPARTMENT HEA0 4y 3 di ff ia

_ - . , . . - .. ~ =_.

C. SPECIFIC UN &lEL Se k(Y 00EST10N EVALUATION REQUIRED:

fM'1ifies inIei t M m 31ure arid cha.nges operation of systems as Je=c' (bad !n cesigri doctments. YES [ ] NO [ 4 (If yes, rarfore wr'tt" IM.Q detemination and Safety Evaluatior., and con

  • ar : Manager, Safety Analysis Branch to determine secd for Integrated Safety Evaluation.)

ENVIRONMENTAL (Adverse environmennt) impact REVIE%' REQIRE]) YES [ ] NO [.4

0. SPECIFIC SAFETY EVAlbATION REQUIRED Affects response of sefety systems, performance of systems which may have been credited in the safety analysis or ion credited systems which may indirectly affect spfety system response. YES [ ] NO [J (If yes, perform written Safety Evaluation and contact Mantger, Safety Analysis Branch to determine need for Inte., rated Safety Evaluation.)

E. INTEGRATED SAFETY EVALUATION REQUIRED YES ( ) NO [ T F. PROCEDURE REQUIRE 3 N SORC REVIEW (In addition to redw, ite with a YES response must be documenteo in the /SORC meeting minutes.) YES [ [ NO [ ]

G. 50RC APPRO'.AL h SORC Heeting Number 3 -# 7-NS H. APPROVAL AND IMPLEMENTATION The attached p is he y approved, and effective on the date below:

= .; - n . 7f Stationhervice/ Unit Superintendent Effective Date SF 301 Rev. 9 Page 1 of 1 0810260501 001007 PDR ADOCK 05000213 P PDR

t

( . .

f E0P 35 FR-S.2 Page 1 .

i .,

Rev. 2

~

O  :

RESPONSE TO LOSS OF CORE SHUTDOWN Page No. Eff. Rev. 3 1-3 2

[

i 4

t i

l

! i r

a [.

b i

t i

i f n

l e

i I

t I

i t

t

, I l t J

[

1 I

I l

l l

1 I

I i

1

O e .

RESPONSE TO LOSS OF E0P 35 FR-S.2 Page 2 CORE SHL'TDOWN Rev._2

( )

A. PURPOSE This procedure provides actions to restore the core to an adequate shutdown conditior.

B. ENTRY CONDITIg j This procedure is cctered from E0P 35 F-0.1, SUBCRITICALITY Critical Safety Function Status Tree, on eitiier YELLOW condition.

This procedure was written for Modes 1, 2, 3 and 4. Uting this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.

~~

\ i V

n v

- + -

OPK642 R 44

e .

PISPONSE TO LOSS OF E0P 35 FR-S.2 Page 3

, CORE SHUTDOWN Rev. 2 ,

~

'N ACTION /8XPSCTED RESPONSE RESPONSE NOT OSTAIN80

-]TW#

1 Check Intermediate Range Flux

a. Flux < 10E-10 amps a. IF flux decreasing, THEN continue to monitor flux. WHEN flux < 10E-10 amps THEN do Steps Ib, and Ic.

IF flux NOT decreasing, THEN check intermediate range channels for undercompensation.

_If undercompensated, ThEN ma.. ally energize sourcq range, detectors. IF NOT undercompensated, THEN borate RCS until flux

< 10E-10 amps.

b. Verify source range b. Manually energize source 4 detectors - ENERGIZED range detectors.

b c. Transfer nuclear recorder to source range scale 2 Check Source Range Borate until source raose Channels - ZERO OR startup rate is negative or NEGATIVE STARTUP RATE zero, i

CAUTION Boration should continue to obtain adequate snutdown margin during subsequent actions. -

l' 3 Return to. Procedure and

( Step In Et'fect, i

- FINAL -

l O

I _s p

--- - - . - - . -