E. J. Hrocz 85 Form Approved by Station Superintendent Effective Date e
i STATION PROCEDURE COVER SHEET
- 3 i
A.
IDENTIFICATION m
Number E0P 35 FR-Z.2 Rev.
1 Title RESPONSE TO CONTAINMENT FLOODING Prepared By J. A. Ruttar B.
REVIEW I have reviewed the above procedure and have found it to be satisfactory.
TITLE SIGNATURE DATE DEPARTMENT HEAD
// n 3
/J.
~
C.
UNREVIEWED SAFETY QUESTION EVALUATION DOCUMENTATION REQUIRED:
(Significant change in procedure method or scope YES [ ]
NO M as described in FSAR)
(If yes, document in PORC/SORC meeting minutes)
ENVIRONMENTAL IMPACT (Adverse environmental impsct)
YES [ ]
NO M (If yes, document in PORC/SORC meeting minutes)
D.
INTEGRATED SAFETY REVIEW REQUIRED (Affects response of Safety Systems, performance YES [ ]
NO N of safety-related control systems or performance of control systems which may indirectly affect safety system response.)
(If yes, document in PORC/SORC meeting minutes.)
E.
PROCEDURE REQUIRES 80 M ORC REVIEW YES D<Q NO [ ]
d'0ic)SORCAPPROVAL F.
0 h 0RC Heeting Number I 5 ' 826' SM' G.
APPROVAL AND IMPLEMENTATION 7ne attached procedure is hereby approved, and effe:tive on the date below:
WS-I.1-lk6T (v)
Station /S(rvice/UnitSuperinpndent Effective Date SF 301 Rev. 7 Page 1 of 1 8010260570 001007 DR ADOCK ODO 3
e EGP 35 FR-Z.2 dage 1 Rev. 1
(
~
RESPONSE TO CONTAINMENT FLOODING Page No.
Eff. Rev.
1-3 1
i e
4
[
I l
l
RESPONSE TO CONTAINMENT FLOODING E0P 35 FR-Z.2 Page 2 Rev. 1 A.
PURPOSE This procedure provides actions to respond to containment flooding.
B.
ENTRY CONDITIONS This procedure was written for Modes 1, 2, 3, and 4.
Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.
This procedure is entered from E0P 35 F-0.5, CONTAINMENT Critical Safety i
Function Status Tree on an ORANGE condition.
0 1
1 O
I h
h
}
i l
1 i
(
' O wesoes.: tn
RESPONSE TO CONTAINMENT FLOODING E0P 35 FR-Z.2 Page 3 Rev. 1
(-
STEP ACTION /tXPECTED RESPONSE RESPONSE NOT OSTAINED 1
Identi 'y Unexpected Source Of Water To Sump and Isolate l
It If Possible
~
a.
Main Steam b.
Main Feed c.
Auxiliary Feed d.
Reactor Plant Component Cooling e.
Chilled Water f.
Fire Protection Water
(
g.
Chemical and Volume Control h.
Low Pressure Safety Injection i.
j.
Quench Spray k.
Fuel Pool Cooling and Purification 1.
Primary Grade Water m.
Steam Generator Chemical Feed NOTE O
The following step can only be accomplished if a Containment Recire Pump is operating.
2 Sample Containment Sump Activity Level at the Reactor Plant Sample Sink SAS1 t
3 Notify Director of Station Emergency Organization (DSEO)
Of Sump Level And Activity i
Level (if available)
To obtain Recommended Action 4
Return To Procedure And Step In Effect
-FINAL-i oruse1 tes