MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20211G1341999-08-24024 August 1999 Proposed Tech Specs Replacement Pages,Incorporating Addl Info for Pending TS Change ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20195C8591999-06-0303 June 1999 Proposed Tech Specs Incorporating Changes Which Reflect Limitations & Requirements Appropriate to Present Configuration of Plant ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199K4861999-01-18018 January 1999 Proposed Tech Specs to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TSs to TRM ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20154A7401998-09-24024 September 1998 Spent Fuel Pool Cooling & Makeup Monitoring Program ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20249B7841998-06-12012 June 1998 Rev 1 to CY-HP-0025,HNP Health Physics Dept Technical Support Document, Background Cs-137 Concentration in Soil ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247Q6491998-05-0707 May 1998 Revised Nuclear Emergency Planning Operating Procedure Index ML20217Q9101998-04-30030 April 1998 Matl Recovery Plan ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept 1999-07-31
[Table view] |
Text
_ _ _ _ _ _ - - - - - -
E. J. Mrec: *
- 2-1-85 Form Appr vcd by Station superintendent Effei:tive Dnto STATION PROCEDllRE COVER SHEET
[ A. IDENTIFICATION LI Number E0P 35 FR-H.S Rev. 1 Title RESPONSE TO STEAM GENERATOR LOW LEVEL Prepared By J. D. Catlin B. REVIEW I have reviewed the above procedure and have found it to be satisfactory.
TITLE SIGNATURE DATE -
DEPARTMENT HEAD J) is C. UNREVIEWED SAFETY QUESTION EVALUATION DOCUMENTATION REQUIRED:
(Significant change in procedure method or scope YES [ ] NO bd as described in FSAR)
(If yes, document in PORC/SORC meeting minutes)
) ENVIRONMENTAL IMPACT (Adverse environmental impact) YES ( ) NO T)4 (If yes, document in PORC/SORC meeting minutes)
D. INTEGRATED SAFETY REVIEW REQUIRED (Affects response of Safety Systems, performance YES [ ] NO > <J of safety-related control systems or performance of control systems which may indirectly affect safety system response.)
(If yes, document in PORC/SORC meeting minutes.)
E. PROCEDURE REQUIRES b ORC REVIEW YES % NO [ ]
F. h 0RC APPROVAL M _0RC Meeting Number 3-seam G. APPROVAL AND IMPLEMENTATION The attached procedure is hereby approved, and effective on the date below:
t maw W Station /pvice/ Unit Superiril7r ndent 12- 04S~
Effective Date SF 301 go2ggg{$$o8 3 a 1 of 1 P
i: .
I l .
E0P 35 FN-H.5 Page 1 I
- Rev. 1 I
~
RESPONSE TO STEAM GENERATOR LOW LEVEL
! Paae No. Eff. Rev. .j 1-4 1 ,
l T
l
- i
(
I I
i
t I
i O
e
[
i I
e i
t t
O i
~
RESPONSE TO STEAM GENERATOR LOW LEVEL E0P 35 FR-H.S Page 2 Rev. 1 J ,
A. PURPOSE This procedure provides actions to respond to a steam generator low level condition.
B. ENTRY CONDITIONS ,
This procedure was written for Modes 1, 2, 3, and 4. Using this ;
procedure when not in these modes requires a step by step evaluation I
to determine if the required action is still applicable to current plant conditions. i This procedure is entered from E0P 35 F-0.3, HEAT SINK Critical Safety L Function Status Tree on a YELLOW condition, r 4
O t
I a
i i
l i
r t
I t
) MM*! $l M
)
. r j
e .
RESPONSE TO STEAM GENERATOR LOW LEVEL E0P 35 FR-H.5 Page 3 Rev. I' U -
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED NOTE Throughout this procedure, "affected" refers to any SG in which narrow range level is less than 4% (34% for adverse containment).
CAtTTION Steam releases from affected SG(s) should be minimized.
1 Identify Affected SG(s)
- a. Narrow range level - LESS a. Return.to procedure and THAN 4% (34% step in effect.
FOR ADVERSE CONTAINMENT) 2 Verify Blowdown Isolatica Manually close valves.
Valves From Affected sG(s) -
CLOSED i
CAUTION AW flow should not be established to any 4
faulted SG that has been isolated unless needed for RCS cooldown.
J 3 Check If Affected SG(s) Not Faulted
- a. Check pressure in affected a. IFF affected SG(s)
SG(s) - previously identified
- 1) NOT DECREASING IN AN as faulted, THEN return UNCONTROLLED MANNER to procedure and step in A_ND effect. IF NOT, THEN go
- 2) NOT COMPLETELY to E0P 35 E-2, FAULTED DEPRESSURIZED STEAM GENERATOR ISOLATION, Step 1.
O OPS 064-1 3-44
'*9b RESPONSE TO STEAM GENERATOR LOW LEVEL E0P 35 FR-H.5 Page 4 Rev. 1
-() -
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED 4 Check AFW Flow To Affected E affected SG(s) wide range SG(s) - GREATER THAN 75 level greater than 4% (34%
CPM for adverse containment), THEN establish AFW flow as necessary to refill affected SG(s).
E affected SG(s) wide range level less than 4% (34% for adverse containment), THEN establish AFW flow to affected SG(s) at a rate not to exceed 100 gpm per SG.
5 Continue Filling Affected
- SG(s) Until Narrow Range Level Greater Than 4% .
(34% For Adverse .
Containment) 6 Return To Procedure and Step In Effect
+ ,(%j)
\
-FINAL-i l
l t
l l
O I
OPS 0681 3-84 L