Text
.
_ 1-85 E. J. MroczL Form Approved by Station Superintendent Effective Date STATION PROCEDURE COVER SHEET I
A.
IDENTIFICATION v\\
Number E0P 35 FR-C.3 Rev.
1 Title RESPONSE TO SATURATED CORE CONDITIONS Prepared By C. T. Ryan B.
REVIEW I have reviewed the above procedure and have found it to be satisfactory.
TITLE
$1GNATURE DATE DEPARTMENT HEAD Y
/.
J' 2
C.
UNREVIEWE0 SAFETY QUESTION EVALUATION DOCUMENTATION REQUIRED:
(Significant change in procedure nethod or scope YES ( )
NO X as described in FSAR)
(If yes, document in PORC/SORC meeting minutes)
ENVIRONMENTAL IMPACT (Adverse environmental impact)
YES ( )
N0 txi I
(If yes, document in PORC/SORC meeting minutes)
D.
INTEGRATED SAFETY REVIEW REQUIRED (Affects response of Safety Systems, performance YES ( )
N0 p4 of safety-related control systems or performance of control systems which may indirectly affect safety system response.)
(If yes, document in PORC/SORC meeting minutes.)
E.
PROCEDURE REQUIRES 83EC)SORC REVIEW YES C)q NO ( )
F. h 30RC APPROVAL h 0RC Heeting Number 3--85 cM4 G.
APPROVAL AND IMPLEMENTATION The attached procedure is hereby approved, and effective on the date below:
M.
tLM,W l2 - 1 J-f$
Station /Serpe/UnitSuperintWdent Effective Date SF 301 Rev. 7 0810260513 001007 Page 1 of 1 PDR ADOCK 05000213 P
E0P 35 FR-C.3 Page 1 Rev. 1 0
~
RESPONSE TO SATURATED CORE CONDITIONS Page No.
Eff. Rev.
i 1-4 1
h O
O
RESPONSE TO SATURATED CORE CONDITIONS E0P 35 FR-C.3 Pags 2 Rev. 1 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OSTAINED I
A.
PURPOSE This procedure provides actions to restore subcooled core cooling.
B.
ENTRY CONDITIONS 2
This procedure was written for Modes 1, 2, 3, and 4.
Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.
This procedure is entered from E0P 35 F-0.2, CORE COOLING Critical Safety Function Status Tree, on the YELLOW condition.
e I
3 O
r l
I s
k I
f 9
L I
I
[
i O
OPS 0041 3 64
--_7
'i
-j
'-RESPONSE TO SATURATED CORE CONDITIONS E0P 35 FR-C.k Pega 3 Rev. 1 I
i f~}'
(
~
Q-i NOTE If f.0P 35 ECA-3.2, SGTR WITH LOSS OF REACTOR CC LANT - SATURATED RECOVERY DESIRED, is in effect, this procedure should NOT he
{
pe rfo rised.
l l
CAUTION i
If RWST level decreases to less than 520,000 gal, the ECCS System should be aligned for cold les recirculation usius E0P 35 ES-1.3, TRANSFER TO COLD LEG RECIRCULATION.
e t
1.
Check RHR Systeve - HAS NOT Go to E0P 3505, MSS i
BEEN PLACED IN SERVICE FOR SNUIDOWN COOLING (RHR)
COOLDOWN 2.
Verify ECCS flow a.
Charging pump SI flow a.
START pumps and align l
indicator - CHECK FOR valves as cecessary i
FLOW l
b.
SI pump flow indicators -
b.
START pumps and align CHECK FOR FL&J valves as necessary e
I c.
RCS pressure - LESS THAN c.
Go to Step 3.
300 PSIA (450 PSIA i
for ADVERSE l
CONTAINMENT) j i
d.
RNR pump flow indicators -
d.
START pumps and align CHICK FOR FLOW valves as necessary
[
f l
i O
[
umn um r
....,3,,
_.,m._-_..---
_. _ _ _. _ _,. _. _ _ _... ~ _.. -.
vs.
~
e L_
RESPONSE TO SATURATED CORE CONDITIONS E0P 35 FR-C.3 Pege 4 Rev. 1 0
eTEP ACTION /EEPSCTED RESPONSE RESPONSE NOT 08TAINEO 3
Check RCS Vent Paths a.
PZR PORVs - CLOSED a.
Manually CLOSE PZR PORVs.
IF any valve can NOT be closed, THEN manually CLOSE its block valve.
h.
Block valves - AT LEAST b.
OPEN block valve UNLESS 1
ONE OPEN it was closed to isolate an open PZR PORV.
i c.
CVCS noras' letdown c.
CLOSE CVCS normal letdown l
isolation v. aves - CLOSED isolation valves, d.
RCS loop drain valves -
d.
CLOSE RCS leap drain CLOSED valves.
i e.
CVCS excess letdown e.
CLOSE CVCS excess isolation valve - CLOSED letdown isolation valve f.
RCS hot leg sample f.
CLOSE RCS hot les sample isolation valves - CLOSED isolation valves.
g.
RCS cold leg sample g.
CLOSE RCS cold les sample isolation valves - CLOSED isolation Salves.
p h.
PZR liquid space sample h.
CLOSE PZR liquid space l
isolation valves - CLOSED sample isolation valves.
i.
Reactor vessel head vest i.
CLOSE reactor vessel isolatfor valves - CLOSED head vent isolation valves.
I' 4.
Return To Procedure And Step In Effect s
-FINAL-I i O 4