ML20205A928

From kanterella
Jump to navigation Jump to search
Rev 0 to Emergency Operating Procedure EOP 3506, Loss of All Charging Pumps
ML20205A928
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 10/09/1985
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20204H467 List: ... further results
References
EOP-3506, NUDOCS 8810260138
Download: ML20205A928 (5)


Text

e E. J. Hrot i 2-1-85

, Fora Approved by Station Suparintendent Effective Dato

. STATION PROCEDURE COVER SHEET l7 ,)

C/ A. IDENTIFICATION Number E0P 3506 Rev. O Title LOSS OF ALL CHARGINC PUMPS Prepared By EDGAR FETTERMAN B. REVIEW I have reviewed the above procedure and have found it to be satisf actory.

TITLE SIGNATURE DATE DEPARTMENT HEAD C. UNREVIEWE0 SAFETY QUESTION EVALUATION DOCUMENTATION REQUIRED:

(Significant change in procedure method or scope YES [ ] NO [Q as described in FSAR)

(If yes, document in PORC/SORC meeting minutes)

ENVIRONMENTAL IMPACT (Adverse environmental impact) YES [ ] NO [\1 (If yes, document in PORC/SORC meeting minutes)

D. INTEGRATED SAFETY REVIEW REQUIRED (Affects response of Safety Systems, performance YES [ ] NO N) of safety-related control systems or performance of control systems which may indirectly affect safety system response.)

(If yes, document in PORC/50RC meeting minutes. )

E. PROCEDURE REQUIRE $ SORC REVIEW YES % NO [ ]

f. ( P0RC/50RC APPROVAL

_a; %

POR USDRC Meeting Number 3".S5'/3 G. APPROVAL AND IMPLEMENTATION The attached procedure is hereby approved, and effective on the date below:

~

Q l cm/9 St fon/ Service / Unit Superintendent. Effec'ti % Date SF 301 8810260138 08100723 p,y, 7 ADOCK 050 Page 1 of 1 gDR

l

  • i i
E0P 3506 Page 1 l . Rev. O i a

! LOSS OF ALL CHARGING PUMPS

)

l I I Page tio. Eff. Rev.

I i 1-4 0 l

l s

9 -

O

LOSS OF ALL CHARGING PI'MPS E0P 3506 Page 2 Rev, O A. PURPOSE .

This procedure provides actions to be taken in the event of a failure of all charging pumps.

B. ENTRY CONDITIONS

1) Charging pump Auto Trip /overcurrent MB3A 5-9
2) Charging pump flow HI/LO MB3A 4-9
3) Pressurizer level deviation MB4A 4-1
4) Pressurizer level lo heaters off MB4A 5-1 and letdown secure n

U 9

s O

LOSS OF ALL CHARGING PUMPS E0P 3506 Page 3 Rev. O (A

U

)

STEP ACTION / EXPECTED RESPONSE RESPONSE NOT QeTAINED CAUTION RPCCW pumps must be running to provide seal cooling.  ;

1 Verify at least one charging START a charging pump. If pump is running, unable to START a charging pump prior to losing pressurizer level below 5%,

THEN go to Step 3. t 2 Go to Step 3.

a. Restore charging flow through normal charging, seal injection or cold leg injection
b. Return to procedure and step in effect O' 3 Verify letdown isolation. Isolate letdown.

4 Verify the Reactor is tripped. TRIP the Reactor and THEN t go to E0P 35 E-0 REACTOR OR l SAFETY INJECTION 5 Initiate RCS Cooldown Manually OR locally dump to 1 530*F steam to cooldown to i 530*F  !

6 Verify RCS Pressure Depressurize RCS to i 2460 (

i 1450 psia psia 7 START a Safety injection Manually open valves. I pump and verify flow 8 Establish Max Excess Letdown (

Flow i

9 PZR level increase to 60%

10 Verify S/D margin If 5/D margin not adequate then reduce PZR level to 20% [

and then allow PZR level to  ;

increase to 60%.

IF S/0 margin still not {

O adequate THEN consider Reactor Vessel Head Letdown to PRT.

l l

l O*KM- t 3 44 i

LOSS OF ALL CHARGING PUMPS E0P 3506 Page 4 Rev. 0 r- STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 11 Raise PZR pressure to control $1 flow and PZR level 12 START a charging pump Go to Step 10 13 Go to E0P 35 ES-0.1 Step 4 REAC10R TRIP .

RESPONSE

-FINAL-r O

l l

~

i O

O C *444 1 3 44 i