ML20205A928

From kanterella
Jump to navigation Jump to search
Rev 0 to Emergency Operating Procedure EOP 3506, Loss of All Charging Pumps
ML20205A928
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 10/09/1985
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20204H467 List: ... further results
References
EOP-3506, NUDOCS 8810260138
Download: ML20205A928 (5)


Text

e E. J. Hrot i

2-1-85 Fora Approved by Station Suparintendent Effective Dato STATION PROCEDURE COVER SHEET 7,)

lC/

A.

IDENTIFICATION Number E0P 3506 Rev.

O Title LOSS OF ALL CHARGINC PUMPS Prepared By EDGAR FETTERMAN B.

REVIEW I have reviewed the above procedure and have found it to be satisf actory.

TITLE SIGNATURE DATE DEPARTMENT HEAD C.

UNREVIEWE0 SAFETY QUESTION EVALUATION DOCUMENTATION REQUIRED:

(Significant change in procedure method or scope YES [ ]

NO [Q as described in FSAR)

(If yes, document in PORC/SORC meeting minutes)

ENVIRONMENTAL IMPACT (Adverse environmental impact)

YES [ ]

NO [\\1 (If yes, document in PORC/SORC meeting minutes)

D.

INTEGRATED SAFETY REVIEW REQUIRED (Affects response of Safety Systems, performance YES [ ]

NO N) of safety-related control systems or performance of control systems which may indirectly affect safety system response.)

(If yes, document in PORC/50RC meeting minutes. )

E.

PROCEDURE REQUIRE $

SORC REVIEW YES %

NO [ ]

f. ( P0RC/50RC APPROVAL

_a; %

POR USDRC Meeting Number 3".S5'/3 G.

APPROVAL AND IMPLEMENTATION The attached procedure is hereby approved, and effective on the date below:

~

l cm/9 Q

St fon/ Service / Unit Superintendent.

Effec'ti % Date SF 301 8810260138 081007 p,y, 7

ADOCK 050 23 gDR Page 1 of 1

l i

i E0P 3506 Page 1 l

Rev. O i

a LOSS OF ALL CHARGING PUMPS

)

l I

I Page tio.

Eff. Rev.

I i

1-4 0

l l

s 9

O

LOSS OF ALL CHARGING PI'MPS E0P 3506 Page 2 Rev, O A.

PURPOSE This procedure provides actions to be taken in the event of a failure of all charging pumps.

B.

ENTRY CONDITIONS 1)

Charging pump Auto Trip /overcurrent MB3A 5-9 2)

Charging pump flow HI/LO MB3A 4-9 3)

Pressurizer level deviation MB4A 4-1 4)

Pressurizer level lo heaters off MB4A 5-1 and letdown secure nU 9

s O

LOSS OF ALL CHARGING PUMPS E0P 3506 Page 3 Rev. O (A)

U STEP ACTION / EXPECTED RESPONSE RESPONSE NOT QeTAINED CAUTION RPCCW pumps must be running to provide seal cooling.

1 Verify at least one charging START a charging pump.

If pump is running, unable to START a charging pump prior to losing pressurizer level below 5%,

THEN go to Step 3.

t 2

Go to Step 3.

a.

Restore charging flow through normal charging, seal injection or cold leg injection b.

Return to procedure and step in effect O'

3 Verify letdown isolation.

Isolate letdown.

4 Verify the Reactor is tripped.

TRIP the Reactor and THEN t

go to E0P 35 E-0 REACTOR OR l

SAFETY INJECTION 5

Initiate RCS Cooldown Manually OR locally dump to 1 530*F steam to cooldown to i 530*F 6

Verify RCS Pressure Depressurize RCS to i 2460

(

i 1450 psia psia 7

START a Safety injection Manually open valves.

I pump and verify flow 8

Establish Max Excess Letdown

(

Flow i

9 PZR level increase to 60%

10 Verify S/D margin If 5/D margin not adequate then reduce PZR level to 20%

[

and then allow PZR level to increase to 60%.

IF S/0 margin still not

{

O adequate THEN consider Reactor l

Vessel Head Letdown to PRT.

l l

O*KM-t 3 44 i

LOSS OF ALL CHARGING PUMPS E0P 3506 Page 4 Rev. 0 r-STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 11 Raise PZR pressure to control $1 flow and PZR level 12 START a charging pump Go to Step 10 13 Go to E0P 35 ES-0.1 Step 4 REAC10R TRIP

RESPONSE

-FINAL-r O

l l

~

i O

O C *444 1 3 44 i