2-1-85 Fora Approved by Station Suparintendent Effective Dato STATION PROCEDURE COVER SHEET 7,)
lC/
A.
IDENTIFICATION Number E0P 3506 Rev.
O Title LOSS OF ALL CHARGINC PUMPS Prepared By EDGAR FETTERMAN B.
REVIEW I have reviewed the above procedure and have found it to be satisf actory.
TITLE SIGNATURE DATE DEPARTMENT HEAD C.
UNREVIEWE0 SAFETY QUESTION EVALUATION DOCUMENTATION REQUIRED:
(Significant change in procedure method or scope YES [ ]
NO [Q as described in FSAR)
(If yes, document in PORC/SORC meeting minutes)
ENVIRONMENTAL IMPACT (Adverse environmental impact)
YES [ ]
NO [\\1 (If yes, document in PORC/SORC meeting minutes)
D.
INTEGRATED SAFETY REVIEW REQUIRED (Affects response of Safety Systems, performance YES [ ]
NO N) of safety-related control systems or performance of control systems which may indirectly affect safety system response.)
(If yes, document in PORC/50RC meeting minutes. )
E.
PROCEDURE REQUIRE $
SORC REVIEW YES %
NO [ ]
- f. ( P0RC/50RC APPROVAL
_a; %
POR USDRC Meeting Number 3".S5'/3 G.
APPROVAL AND IMPLEMENTATION The attached procedure is hereby approved, and effective on the date below:
~
l cm/9 Q
St fon/ Service / Unit Superintendent.
Effec'ti % Date SF 301 8810260138 081007 p,y, 7
ADOCK 050 23 gDR Page 1 of 1
l i
i E0P 3506 Page 1 l
Rev. O i
a LOSS OF ALL CHARGING PUMPS
)
l I
I Page tio.
Eff. Rev.
I i
1-4 0
l l
s 9
O
LOSS OF ALL CHARGING PI'MPS E0P 3506 Page 2 Rev, O A.
PURPOSE This procedure provides actions to be taken in the event of a failure of all charging pumps.
B.
ENTRY CONDITIONS 1)
Charging pump Auto Trip /overcurrent MB3A 5-9 2)
Charging pump flow HI/LO MB3A 4-9 3)
Pressurizer level deviation MB4A 4-1 4)
Pressurizer level lo heaters off MB4A 5-1 and letdown secure nU 9
s O
LOSS OF ALL CHARGING PUMPS E0P 3506 Page 3 Rev. O (A)
U STEP ACTION / EXPECTED RESPONSE RESPONSE NOT QeTAINED CAUTION RPCCW pumps must be running to provide seal cooling.
1 Verify at least one charging START a charging pump.
If pump is running, unable to START a charging pump prior to losing pressurizer level below 5%,
THEN go to Step 3.
t 2
Go to Step 3.
a.
Restore charging flow through normal charging, seal injection or cold leg injection b.
Return to procedure and step in effect O'
3 Verify letdown isolation.
Isolate letdown.
4 Verify the Reactor is tripped.
TRIP the Reactor and THEN t
go to E0P 35 E-0 REACTOR OR l
SAFETY INJECTION 5
Initiate RCS Cooldown Manually OR locally dump to 1 530*F steam to cooldown to i 530*F 6
Verify RCS Pressure Depressurize RCS to i 2460
(
i 1450 psia psia 7
START a Safety injection Manually open valves.
I pump and verify flow 8
Establish Max Excess Letdown
(
Flow i
9 PZR level increase to 60%
10 Verify S/D margin If 5/D margin not adequate then reduce PZR level to 20%
[
and then allow PZR level to increase to 60%.
IF S/0 margin still not
{
O adequate THEN consider Reactor l
Vessel Head Letdown to PRT.
l l
O*KM-t 3 44 i
LOSS OF ALL CHARGING PUMPS E0P 3506 Page 4 Rev. 0 r-STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 11 Raise PZR pressure to control $1 flow and PZR level 12 START a charging pump Go to Step 10 13 Go to E0P 35 ES-0.1 Step 4 REAC10R TRIP
RESPONSE
-FINAL-r O
l l
~
i O
- O C *444 1 3 44 i