e STATICN PROCEDURE COVER SHEET A.
IDENTIFICATION l
Number: E0P 25408 Rev.
2
Title:
FUNCTIONAL RECOVERY OF VITAL AUXILIARIES (AC AND OC POWER)
I Prepared By: S. Brinkman B.
REVIEW I have reviewed the above procedure and have found it to be satisfactory.
[
TITLE SIGHATURE DATE DEPARTMENT HEAD M Y o,as m. m-c2nM e,,
a C.
SPECIFIC UNREVIEWED SAFETY QUESTION EVALUATION REQUIRED:
Modifies intent of procedure and changes operation of systems as described in design documents.
YES [ ]
NO [M 4
(If yes, perform written USQ determination and Safety,
Evaluation, and contact Manager, Safety Analysis Branch to determine need for Integrated Safety Evaluation.)
ENVIRONMENTAL REVIEW REQUIRED
[
(Adverse environmental impact)
YES [ ]
NO ()()
t D.
SPECIFIC SAFETY EVALUATION REQUIRED l
Affects response of safety systems, performance of systems which may have been credited in the I
safety analysis or non-credited systems which may indirectly affect safety system response.
YES [ ]
NO [M (If yes, perform written Safety Evaluation and contact Manager, Safoty Analysis Branch to determine
[
l need for Integrated Safety Evaluation.)
E.
INTEGRATED SAFETY EVALUATION REQUIRED YES [ ]
NO %
F.
PROCEDURE REQUIRES PORC/50RC REVIEW ITnadditiontoreview, items with a YES response must be documented in the PORC'SORC meeting minutes. )
YES i]
NO ( )
l G.
PORC/SORC APPROVAL PORC/50RC Meeting Number 2-N-ISI 3-H.
APPROVAL AND IMPLEMENTATION i
The attached procedure is hereby approved, and effective on the date below
)
M &. &Mw YYSY j
StatioJ/ Service /UnitSuperintendent Effettive Date j
SF301/9/s/SES/87-12/lof1 e
i 801026004B 001007 i
DR ADOCI'. 050 23 I
I I
f FUNCTIONAL RECOVERY OF VITAL AUXILIARIES (AC AND OC POWER) i I
Page No.
Eff. Rev.
1-19 2
i h
i i
I l
i i
)
i' I
i l
1 i
l h
l 4
6 1
4 l
i l
l f,
i, I
I 1
L 1
L 1
I i
e, t
i t
4 I
E0P 2540B Page 1 l
Rev. 0 l
%uf FUNCTIONAL RECOVERY OF VITAL AUXILIARIES (AC AND OC POWER) 1.
PURPOSE To provide a systematic procedure to ensure that adequate AC and DC electrical power is maintained to the Unit, 2.
ENTRY CONDITIONS Functional Recovery Procedure.
E0P 2540, indicates th*at site electrical requirement are not being satisfied.
O E0P 2540B Page 2 Rev. 2
FUNCTIONAL RECOVERY OF VITAL AUMLIARIES (AC AND DC POWER) 3.
OPERATOR ACTIONS Instructions Contingency Actions CAUTION Do not leave this procedure until satisfying Vital Auxiliary requirements.
Other safety function (s) may be pursued concurrently.
3.1 Determine, based on present 3.1 Continue with this procedure plant conditions, which success paths can be used to satisfy AC and DC power requirements.
Refer to Figure 4.1, Vital Auxiliaries, f
NOTES 1.
Step 3.2 pertains to Loss of DC.
Steps 3.3 through 2.5 pertain to Loss of AC 2.
This procedure can be entered at any step as a result of assessing probable success paths.
E0P 2540B Page 3 Rev. 2
t
~
(-)
Instructions Contingency Actions v
OC Power from 125VOC System l
CAUTIONS 1.
Attempting to re-energize Bus 201A or 2018 by closing 125VDC Load Center Tie Breakers 00104 and 00204 could result in breakers opening on the energized Bus.
2.
If the load Center Feed Breaker trips while attempting to re-energize the 125 VOC load center, do not attempt to I
re-energize again until the cause is determined and corrected or isolated.
l 3.
The diesel on the affected facility will start on loss of DC and f
operate at minimum speed en the mechanical governor.
There will be no diesel protection except for mechanical overspeed.
l 3.2 Restore power to at least 3.2 one mala DC bus by the following (Refer to Figure 4.2) a.
Open all breakers on a.
Continue with this on de-energized 6.9 and procedure 4.16 KV buses per OP 2343, Station Electrical (tocal) t b.
Ydeify battery dis-b.
connects are closed i.
Ensure battery (local) bus is de-energized a n,,d 11.
Close battery disconnects O
E0P 25408 Page 4 Rev. 2
Instructions Contingency Actions c.
Open all breakers in c.
Continue with this each of the distribution procedure panels (local)
BUS 201A DV10, DV30 t
011. 012 BUS 201B DV20, DV40 021, 022 d.
Ensure the following feeder d.
C,nntinue with this breakers are closed (local) procedure BUS 201A Breaker Feed to Panel 00105 DV10 00108 OV30 00109 011 00110 012 BUS 201B Breaker Feed to Panel 00205 DV20 00208 OV40 1
00209 021 00210 022 j
e.
Close battery bus 201A (2018) e.
Continue with this supply breaker L0103 (00203) procedure i
f.
Verify at least one main DC bus f.
Investigate for faults is energized on DC bus (local) 9 Close the individual load g.
Continue with this breakers one at a time.
procedure (local)
!O I
E0P 25408 Page 5 Rev. 2
Instructions Contingency Actions h.
Verify at least une ma!n DC h.
bus is still energized (C08) 1.
Continue actions to restore at least one main DC bus and 11.
H DC power cannot L
be restored to at least one DC bus.
Then immediately start actions to remove RCS heat per RCS Heat Re6 oval, E0P 25400 Step 3.2 1.
i.
i 1.
Go to next safety function 1.
Not applicable not s'atisfied. (Refer to OPS Form 2540-1) i E
11.
E all safety functions are satisfied per OPS Form 2540-1, Then go to E0P 2540, Step 3.10 1
l l
l 1
1 O
l l
l E0P 2540B Page 6 Rev. 2
- r
g\\
(LJ Instructions j ntingency Actions AC Power from Unit 2 RSST
- 3. 3 Verify the fast transfer of 3.3 6.9 KV and 4.16 KV buses to a.
the Unit 2 RSST (Refer to 1.
Open all breakers Figure 4.3) on the affect 0d bus, a.
Ensure both vital AC
- 11. Obtain ESAS buses are energized undervoltage keys.
l (C08) iii. Block and Reset.
r LNP on bus to be energized from the l
RSST iv. Reenergize 4160 volt i-s buses.
(Refer to OP 23'43).
b.
b.
Not applicable i.
Go to next safety function not satisfied.
(Refer to OPS Form 2540-1)
E 11.
If all safety functions are
[
t satisfied, Then go the E0P 2540, step 3.10 f
I l
i E0P 2540B Page 7 l
l Rev. 2 yw
,v-,w m.-
r
Instrpctions Contingency Actions v
,AC Power from Diesel Generators CAUTION Service' water cooling is required to prevent diesel generator overheating.
Each diesel generator's vital bus must N energized to supply service water.
i 3.4 Restore AC Power using 3.4 i
diesel generators (Refer to Figure A.4) a.
Verify at least one diesel a.
generator starts and i,
ifbothdieselgenera-energizes bus 24C or 240 tors failed to start, (C08)
Then dispatch an-operator with portable lights and communications to the diesel room to investigate E
- 11. Iff,either diesel generator starts but it's respective vital bus is not energized.
Then emergency trip the diesel to prevent overheating (C08)
O E0P 2540B Page 8 Rev. 2
r-i Instructions Contingency Actions, f
b.
Alian fire system to instrument b.
Align RBCCW to ins.rument a
air compressors (local) air compressors (local).
c, Start instrument air compressors.
c.
Notify Unit 1 and open Refer to Instrument Air, OP 23328 the station air cross-(local) tie valve to receive instrument air from Unit i
1 (local) d.
Prevent backdraft of Unit I d.
Continue with this stack gases into Unit 2 by procedure the following i.
Open 2-EB-50 (40; and i
2-EB-51 (41), EBFS i
dampers (C01) 11.
Start A(B) EBFS Fan (COI) j tit. Close 2-EB-55 and 2-EB 56 Condenser Air Removal Fan Otscharge to Unit 1 (C06) iv.
Close 2-EB-57 Condenser Air Removal to Unit 2 (C06) v.
Place switches for F-55A and F-55R in "stop" (C06) e.
Monitor diesel fuel oil tank e.
If level falls below level (C08) 92%, Then replenish per Diesel Generator, UP 2346A O
E0P 25408 Page 9 Rev. 2
s O
Instructions Contingency Acticns
[G f.
Verify AC electrical requirements f.
M AC electrical require-are being met by ments are ng met, i.
At least one diesel Then evaluate the use of generator running (C08) another sucess path per and Figure 4.1 11.
At least one vital AC bus energized (C08) g.
g.
Not applicable i.
go to next safety function not satisfied.
(Refer to OPS Form 2540-1)
E 11.
H all safety functions are satisfied per OPS Form 2540-1, Then go to E0P 2540, step 3.10 O
E0P 2540B Page 10 Rev. 2
I e
Instrcctions Contingency Actions 3'
AC Power from Unit 1 RSST CAUTION When 24E and 24C (24E and 240) are being powered from Unit 1 RSST, do not exceed 3.0 MVA or 460 amps cn 24F.
Refer to Figure 4.6.
3.5 Restore AC Power to at least 3.5 one vital AC bus from Unit 1 RSST.
Refer to Figure 4.5 a.
Check open feed from RSST and a.
Continue with this tie; from 24A(B) (C08) procedure
/;
b.
Notify Unit 1 and energize b.
Evaluate use of other t\\-
24E and 24C (24E and 240) success path from Unit 1 RSST (C08) c.
Reenergize 24E and 24C c.
Continue with this loads (24E and 240) (C08) procedure d.
Align fire system to d.
Align RBCCW to instrument instrument air compressors air compressors (local)
(local) e.
Start instrument air e.
Notify Unit 1 and open compressors.
Refer to the station air crosstie Instrument Air, OP 23328 valve to receive instrument (local) air from Unit 1 (local)
(
'\\
V E0P 2540B Page 11 Rev. 2
g
[Q.s
_I structions Contingency Actions f.
Prevent backdraft.of Unit 1 f.
Continue with this stack gases into Unit 2 by procedure the following 1.
Open 2-EB-50 (40) and 2-EB-51 (41) EBFS l
dampers (C01) 11.
Start A(B) EBFS Fan (C01) iii. Close 2-EB-55 and 2-EB-56, Condenser Air Removal Fan Discharge to Unit 1 (C06) iv.
Close 2-EB-57, Condenser Air Removal to Unit 2 (C06) v.
Place switches for F-55A and F-SSB in "stop" (C06) g.
Verify AC electrical require-g.
H AC electrical ments are being met by at least requirements are not. met, one vital AC bus energized load shed DC loads (Refer (C08) to OP 23450) and evaluate the use of another success path per Figure 4.1.
h.
h.
Not applicable J to next safety function i.
G not satisfied.
(Refer to OPS Form 2540-1) 2.C 11.
M all safety functions are satisfied per OPS Form 2540-1, Then go to E0P 2540, Step 3.10 0
E0P 25408 Page 12 Rev. 2
r-4.
FIGURES 4.1 Vital Auxiliaries 4.2 OC Power from 125VOC System 4.3 AC Power from Unit 2 RSST 4.4 AC Power from Diesel Generators 4.5 AC Power from Unit 1 RSST 4.6 Electrical Limits on Bus 24F SB: f aj
- Final -
O
- O E0P 2540B Page 13 Rev. 2
e
(.
\\_-)
FIGURE 4.1 VITAL AUXILIARIES (At AND DC POWER) SUCCESS PATHS SUCCESS METHOD STEP FUNCTIONAL PATH SCHEMATIC DC Power from 125 VDC Buses 201A and/or 3.2 4.2 125 VDC System 2018 AC Power from RSST supply 24C and/or 240 3.3 4.3 RSST AC Power from 12u or 13u D/G supplying 3.4 4.4 Diesel Generators Buses 24C and/or 24D AC Power from Unit 1 RSST supply 24C 3.5 4.5 t'~s Unit 1 or 240 through 24E N~-l, O
E0P 25408 Page 14 Rev. 2
1' FIGURE 4.2 DC POWER FROM 125 VOC SYSTEM O
~
BA7TERY BATTERY ZotA 2cis "g
- g
-Q BATTERY BidTER/
BATTEW CHA EER CHAMEK CHARGER Z
)
')
).
/
bE b5 bE b5 125VDC 125 VDC.
BUS 201A B06 201B j
))))))
))))))
l l
1 I
I I
LOADS I
LOADS l
O E0P 25409 Page 15 Rev. 2 i
i
F FIGURE 4.3 AC POWER FROM UNIT 2 RSST 545 KV 6
A ww S45 KV LMIT E N55T 1 r UNrT 2 RSST
- WN,xv NW e 2.u 4.sxv s.
a, c<
4.4 xv
)d
)d 25A 25B 24G
' O 4
)
1) d d
l 14 A 24B 24C 24D 24 E l
d'N d
M n
i E0P 2540B Page 16 Rev. 2 I
i
FIGURE s 4 AC POWER FROM OIESE' GENERAT'RS
~
O 12 u. DIESEL QENERATOR 13u blE5EL GENERATOR 8
)
24 C 24 D
)
O WW WW mm M N\\
24 E 22e 227 l
O i
E0P 2540B Page 17 i
Rev, 2
6 FIGURE 4.5 AC POWER FROM UNIT 1 RSST 345 KV
@w" UNIT 1 RSST 24 F
)
)
24 E O
HE W
24 C 24 D l
)
)
mu mn W
WW l
l l
zz e 22 7 l
l l
E0P 25408 Page 18 Rev. 2
~
FIGURE 4.6 ELECTRICAL LIMIT ON BUS 24F
+100 3
s 4l00 UNACCEPTABLE REGION
- O m
V Q
~
3900,,
L T
3 ACCEPTABLE REGION 38 00 <.
370,0 1
l 3600 410 tio ih 440
+50 160 A M PS
- This limit applies on'y when 24F is being supplied from Unit 1 RSST.
O E0P 25408 Page 19 Rev. 2
_