Rev 2 to Emergency Operating Procedure FR-I.2, Response to Low Pressurizer Level
ML20204K081
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 06/03/1988
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20204H467 List: ... further results
References
FR-I.2, NUDOCS 8810250340
Download: ML20204K081 (3)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

JUN 3 1988 NUMBER TTT12 REY. ISSUFJDATE FR.I.2 RESPONSE TO LOW PRESSURIZER LEVEL Rev. 2

(

A.

PURPOSE nis procedure provides actions to respond to a low pressurizer level B.

SYMPTOMS OR ENTRY CONDITIONS This procedure is entered from F-0.6, INVENTORY Critical Safecy Function Status Tree on a YELLOW condition.

i i

1 I

i f

l l

Page 1 of 3 8810250340 081C" l

PDR ADOCK 050 3

P

JUN 3 1988 NUMBER EU REY ISSUE /DATE FR.I.2 RESPONSE TO PRESSURIZER LOW LEVEL Rev.2

(

$17.P ACT10N/EXPECED RESPONSE RESPONSE NOT OBTAINED 1

CHECK IF SI HAS BEEN ERMINARD:

l l

a. Check both HPSI pumps -
a. RETURN IQ procedure and step STOPPED ineffect.

j 2

VERIFY LETDOWNISOLARD MANUALLY ISOLAE LEIDOWW.

3 CHECK IF CHARGING FLOW HAS BEEN ESTABLISHED:

a. Check charging pumps -
a. Perform the following:

AT LEAST ONE RUNNING i

1. Check CCW flow to RCP thermal j

barriers established.

E CCW flow to RCP thermal barriers NQIestablished, J

T11EN close RCP seal water supply valves CH V.345A through CH V 354D.

l

2. Start one charging pump.

l

b. Check containment instrument
b. Start one containment instrurnent air pressure -

air compressor e establish GREATER THAN 118 PSIG instrument air pressure.

I j

c. Check char #c flow-
c. Perform the following ESTABLIS 4E)
1. Select and place in mannual l

CH FCV 110 QR CH FCV.110A.

2. Set flow control valve for minimum.
3. O wn CH MOV 2928 and 1

Ci MOV 292C.

4 INCREASE CHARGING FLOW E CHARGING FLOW AT MAXIMUM, l

TO RESTORE PRZRIl! VEL T1IEN MANUALLY OPERATE Si PUMPS AS NECESSARY, E PRZR LEVEL CAN NQIBE

RESTORED, j

TliEN QQIQ E 1 LOSS OF REACTOR COOLANT. STEP 1.

I 1

l

\\

J Page 2 of 3

NUMBER MM REY. ISSUE /DAH FR.I.2 RESPONSE TO PRESSURIZER LOW LEVEL Rev.2

(

STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 5

CHECK PRESSURIZER LEVEL:

a. Checklevel INCREASING
a. RETURN IQ Step 4.
b. Checklevel-
b. RETURNIQ Step 5 a.

GREATER THAN 11.5 %

I 6

TURN ON PRZR HEATERS AS NECESSARY 7

RETURNIQ PROCEDURE AND STEP IN EFFECT j

i END

.i i

I l

l Page 3 of 3