- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
JUN 3 1988 NUMBER TTT12 REY. ISSUFJDATE FR.I.2 RESPONSE TO LOW PRESSURIZER LEVEL Rev. 2
(
A.
PURPOSE nis procedure provides actions to respond to a low pressurizer level B.
SYMPTOMS OR ENTRY CONDITIONS This procedure is entered from F-0.6, INVENTORY Critical Safecy Function Status Tree on a YELLOW condition.
i i
1 I
i f
l l
Page 1 of 3 8810250340 081C" l
PDR ADOCK 050 3
P
JUN 3 1988 NUMBER EU REY ISSUE /DATE FR.I.2 RESPONSE TO PRESSURIZER LOW LEVEL Rev.2
(
$17.P ACT10N/EXPECED RESPONSE RESPONSE NOT OBTAINED 1
CHECK IF SI HAS BEEN ERMINARD:
l l
- a. Check both HPSI pumps -
- a. RETURN IQ procedure and step STOPPED ineffect.
j 2
VERIFY LETDOWNISOLARD MANUALLY ISOLAE LEIDOWW.
3 CHECK IF CHARGING FLOW HAS BEEN ESTABLISHED:
- a. Check charging pumps -
- a. Perform the following:
AT LEAST ONE RUNNING i
barriers established.
E CCW flow to RCP thermal barriers NQIestablished, J
T11EN close RCP seal water supply valves CH V.345A through CH V 354D.
l
- 2. Start one charging pump.
l
- b. Check containment instrument
- b. Start one containment instrurnent air pressure -
air compressor e establish GREATER THAN 118 PSIG instrument air pressure.
I j
- c. Check char #c flow-
- c. Perform the following ESTABLIS 4E)
- 1. Select and place in mannual l
- 2. Set flow control valve for minimum.
Ci MOV 292C.
4 INCREASE CHARGING FLOW E CHARGING FLOW AT MAXIMUM, l
TO RESTORE PRZRIl! VEL T1IEN MANUALLY OPERATE Si PUMPS AS NECESSARY, E PRZR LEVEL CAN NQIBE
- RESTORED, j
TliEN QQIQ E 1 LOSS OF REACTOR COOLANT. STEP 1.
I 1
l
\\
J Page 2 of 3
NUMBER MM REY. ISSUE /DAH FR.I.2 RESPONSE TO PRESSURIZER LOW LEVEL Rev.2
(
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 5
CHECK PRESSURIZER LEVEL:
- a. Checklevel INCREASING
- a. RETURN IQ Step 4.
- b. Checklevel-
- b. RETURNIQ Step 5 a.
GREATER THAN 11.5 %
I 6
TURN ON PRZR HEATERS AS NECESSARY 7
RETURNIQ PROCEDURE AND STEP IN EFFECT j
i END
.i i
I l
l Page 3 of 3