ML20204K072
| ML20204K072 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Haddam Neck, 05000000 |
| Issue date: | 06/03/1988 |
| From: | CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | |
| Shared Package | |
| ML20204H467 | List:
|
| References | |
| FR-Z.3, NUDOCS 8810250334 | |
| Download: ML20204K072 (2) | |
Text
__ _ _ _ _
JUN 3 1988 NUMBER TME REY. ISSUE /DATE g
FR.Z.3 RESPONSE TO HIGH CONTAINMENT Rev. 2 RADIATON LEVEL j
k A.
PURPOSE nis procedure provides aedons to respond to high containnwnt radiadon level.
B.
SYMPTOMS OR ENTRY CONDITIONS His procedure is entered from F 0.5, CONTAINMENT Crideal Safety Function Status Tree on a YELLOW path.
4 4
i l
I i
Page 1 of 2 t
0810250334 001007 PDR ADOCK 05000213 P
JUN 3 1988 g
NUMBER TTH E REV. !SSLTA) ATE i
FR.Z.3 RESPONSE TO CONTAINMENT HIGH Rev.2 RADIATION LEVEL
=
\\
STEP ACT10N/ EXPECTED RESPONSE RESPONSE NOTOBTAINED 1
CHECK CONTAINMENT PRESSURE:
- a. Check containment pressuri-
- a. QQIQ Step 2.
GREATER THAN 5 PSIO
- b. Verify HCP relays DUPPED
- c. Verify containment isolation valves -
- c. Manually close containment isolation CLOSED valves as necessary.
(SEE OPPOSITE PAGE) 2 VERIFY CONTALNMENT AIR RECIRCULATION SYSDiM OPERADNG:
a Check all face dampers OPEN
- a. Place face damper control switches in the test posinon.
- b. Check all available CARFANs -
- b. Start all available CARFANs.
RUNNING 3
NOTIFY PLANT ENGINEERING l
STAFF OF CONTAINMEST i
RADIATION LEVELTO OBTAIN RECOMMENDED ACTION 4
RERJRNIQ PROCEDURE AND STEP IN EFFECT END i
I i
I l
Page 2 of 2 1
- - - - - - - - - ~ -, _ - - - - - - -
,..