Discusses 990730 Open Meeting Conducted at Region II Request Re Continuing & Planned Engineering Activites.List of Meeting Attendees & Copy of Presentation Handout Encl
ML15261A271
Person / Time
Site: Oconee  
Issue date: 08/11/1999
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mccollum W
DUKE POWER CO.
References
NUDOCS 9908170082
Download: ML15261A271 (18)


Text

August 11, 1999 Duke Energy Corporation ATTN:

Mr. W. R. McCollum Vice President Oconee Site 7800 Rochester Highway Seneca, SC 29672

SUBJECT:

MEETING

SUMMARY

- OCONEE NUCLEAR PLANT (ONS)

Dear Mr. McCollum:

This refers to the open meeting that was conducted at your request at Region II on July 30, 1999, to discuss your continuing and planned engineering activities.

A list of attendees and a copy of your presentation handout are enclosed.

It is our opinion that this meeting was beneficial. We appreciate your update on plant status, engineering focus areas, and resolution of open items.

In accordance with Section 2.790(a) of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this meeting, please contact us.

Sincerely, Original signed by Kerry D. Landis Kerry D. Landis, Chief Engineering Branch Division of Reactor Safety Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55

Enclosures:

1.

List of Attendees

2.

Licensee Presentation Handouts cc w/encls: (See page 2)

(

170018 9908170082 990811 PDR ADOCK 05000269 P

PDR

DEC 2

cc w/encls:

Compliance Manager (ONS)

R. Mike Gandy Duke Energy Corporation Division of Radioactive Waste Mgmt.

Electronic Mail Distribution S. C. Department of-Health and Environmental Control Lisa Vaughn Electronic Mail Distribution Legal Department (PB05E)

Duke Energy Corporation County Supervisor of 422 South Church Street Oconee County Charlotte, NC 28242 Walhalla, SC 29621 Rick N. Edwards Lyle Grabber, LIS Framatome Technologies NUS Corporation 1700 Rockville Pike, Suite 525 Electronic Mail Distribution Rockville, MD 20852 L. A. Keller, Manager Anne Cottington Nuclear Regulatory Licensing Winston and Strawn Duke Energy Corporation Electronic Mail Distribution 526 S. Church Street Charlotte, NC 28201-0006 Mel Fry, Director Division of Radiation Protection Peggy Force N. C. Department of Environmental Assistant Attorney General Health & Natural Resources N. C. Department of Justice Electronic Mail Distribution Electronic Mail Distribution Virgil R. Autry, Director Distribution w/encl:

Div. of Radioactive Waste Mgmt.

D. LaBarge, NRR (del)

S. C. Department of Health and PUBLIC Environmental Control Electronic Mail Distribution OFFICE RI I:DRP SIGNATURE NAME COgle:pd DATE 8/

/99 8/

/99 8/

/99 8/

/99 8/

/99 8/

/99 8/

/'99 COPY?

I YES NO YES NO f

YES NO I

YES NO I

YES NO YES NO YES NO j

OFFICIAL RECORD COPY DOCUMENT NAME:

S:\\DRS\\EB\\ocosummary.wpd

List of Attendees Licensee L. Azzarello, Design Basis Engineering Manager, Oconee Nuclear Plant (ONS)

E. Burchfield, Design Basis Engineering Supervisor, ONS M. Nazar, Engineering Division Manager, ONS

-NRC Region II C. Casto, Deputy Director, Division of Reactor Projects (DRP)

J. Johnson, Deputy Regional Administrator K. Landis, Chief, Engineering Branch, Division of Reactor Safety (DRS)

B. Mallett, Director, DRS V. McCree, Deputy Director, DRS C. Ogle, Chief, Reactor Projects Branch 1, DRP

Oconee Nuclear Station Region II Engineering Update 4ee Nude July 30, 1999 Oconee Nuclear Station

I 'Ol Agenda M ud

  • Plant Status
  • Engineering Focus Areas
  • Accomplishments
  • Post-MOG Open Items
  • Closing Remarks Oconee Nuclear Station 2

ea Plant Status

  • All three units at 100% FP
  • Recently completed Unit 1 outage

- Service water modifications finished on all three units

- Generator rewind

- CRDM replacements

- Reactor coolant pump work

  • Unit 2 refueling outage this fall Oconee Nuclear Station 3

O'(,E POip feesiEngineering Focus Areas SNut Business and Work Process Nuclear Safety Production Efficiency PERFORMANCE ASSESSMENT BASIS EQUIPMENT FOCUS MANAGEMENT RELIABILITY jj McCOLLUMOSTER NAZAR NAZAR FORES A

G Ar C ijaA C f

U:Ig Itsa 01 1a e om Eq u pme Engineering aIS Program Health Clarification Reliability Assessment Improvement AarloCurtis LiftWe 6a seessment aConfiguration EnieeTn Yw And Benchmarks Management Quality Wlile Azzarello IWilkie ng nearing or Management Dobson KEY RED Neede Improvement YELLOW Meete Rapectation.

QUARTERLY GREEN E.**de Ep.t.ti.n.

STATUS YTD WHITE Unreported CURRENT BTATUS Oconee Nuclear Station

Accomplishments

  • ITS implemented on 3/27/99
  • Unit 2 outage milestones
  • Reducing PIP backlog
  • Level I self assessments
  • Questioning attitude of engineers
  • Completion of OSW Project Oconee Nuclear Station 5

Accomplishments Mud

  • Progress on EOP project
  • Continuing involvement and leadership on industry activities related to GL 96-06
  • Improving root cause quality Oconee Nuclear Station 6

II Post-MOG Open Items Schedule for Post-MOG Open Items 6

E 4

0

-3 01 CI)

)

0 I

0 010 Oconee Nuclear Station 7

Pv E P Xoil OSRDC Nud

  • Project remains on schedule
  • Event mitigation calculations completed
  • Equipment database contains,~ 10,000 components 80% of components are QA-1
  • Implementation of QA-5 program will continue through 2000 Oconee Nuclear Station 8

UFSAR Reverification Project Muct

  • Open items from first pass review being addressed

- 3/2000 completion date for high priority chapters

- 3/2001 completion date for low priority chapters

  • 2nd pass review completed
  • Expert panel has reviewed open items
  • Disposition of open items will be scheduled by September 1999 Oconee Nuclear Station 9

UFSAR Reverification Project Status-High Priority Chapters 350-73 % Complete 300 Planned CAs 250

. -Actual Open 200 8150 100 sCA' 0

00 0o

0) 0 ZP Cu D.

Oconee Nuclear Station 10

eI UFSAR Reverification Project Nud Status-Low Priority Chapters 33 % Complete 200 Planned C As Actual Open 150 CAs 100 500 50 0

0)
0)

M) 02 9

C Ooe N

a S

Oconee Nuclear Station

I ' I I

E EFW Design Basis

  • TDEFW pump runout protection license amendment submitted 4/99
  • MDEFW pump runout test completed during Unit 1 refueling outage
  • Single failure analysis underway - complete by October 1999
  • Pursuing long-term improvements via Automatic Feedwater Isolation System (AFIS) and EFW control system modifications Oconee Nuclear Station 12

High Energy Line Break

  • HPI pumps successfully tested from ASW switchgear during Unit 1 refueling outage

- Project to be completed in 2000 Oconee Nuclear Station 13

Control Room Habitability

%eNucId

  • Ductwork sealed
  • Tracer gas testing completed
  • Stone & Webster design study completed
  • Design study of possible modifications completed
  • Sensitivity study of dose results underway
  • Meeting planned 11/99 with NRR to discuss resolution of licensing issues
  • License amendments will follow NRR meeting Oconee Nuclear Station 14

Closing Remarks Oconee Nuclear Station 15