MONTHYEARML15113A7671999-10-27027 October 1999 Informs That NRC Will Not Be Able to Issue Final Safety Evaluation for BAW-2248 Until mid-Nov Because of Scheduler Conflicts & Workload Priorities ML15261A2421999-10-13013 October 1999 Informs That on 990930,staff Completed mid-cycle PPR of Oconee Nuclear Station.No New Areas That Warranted More than Core Insp Program Over Next Five Months Identified. Historical Listing of Plant Issues Encl ML15112A7851999-10-0808 October 1999 Provides NRC Staff Plan for Resolving Open Item 2.1.3.1-1 of SER Re License Renewal of Plant,Units 1,2 & 3 ML15112A7741999-10-0505 October 1999 Requests Addl Info Re Aging Effects of Insulated Cables & Connections for Plant,Based on Insp Findings Noted in Insp Repts 50-269/99-12,50-270/99-12 & 50-287/99-12 and License Renewal Application ML15113A7511999-09-23023 September 1999 Concludes That All Info Requested by GL 98-01 & Suppl 1 Re Y2K Readiness of Computers at NPPs Provided by Util & GL 98-01 Considered Closed for Ons,Units 1,2 & 3 ML15261A4221999-09-21021 September 1999 Forwards Insp Repts 50-269/99-12,50-270/99-12 & 50-287/99-12 on 990602-0730.No Violations Noted.Insp Revealed That,In Most Cases,Existing Aging Mgt Programs,Implemented as Described in Licensee Application ML15113A7521999-09-21021 September 1999 Informs That Util 980326 Response to GL 97-06, Degradation of Steam Generator Internals Acceptable ML15112A7661999-09-20020 September 1999 Forwards SE Accepting Relief Request for Revision 25 of Pump & Valve Inservice Testing Program,Third 10-yr Interval for Plant ML15261A2411999-09-17017 September 1999 Confirms 990916 Telcon Between L Nicholson of Licensee Staff & R Carroll of NRC Re Mgt Meeting to Be Conducted on 991006 in Atlanta,Ga to Discuss Licensee Status of Ongoing Improvement Initiatives at Oconee Nuclear Station ML15112A7521999-09-10010 September 1999 Forwards SE Accepting Licensee 990806 Request for Relief to Use Alternative Rules of ASME B&PV Code on Certain Weld Matls in Replacement SGs Being Manufactured for Plant ML15261A4181999-09-10010 September 1999 Forwards Insp Repts 50-269/99-05,50-270/99-05 & 50-287/99-05 on 990704-0814.Ten Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML15113A7481999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Imposed by RG 1.147,Rev 12,acceptable Since Evaluation on Original Relief Based on Implementing Code Case for Duration of Insp Interval & That 990522 Request Valid ML15112A7611999-09-0909 September 1999 Forwards Safety Evaluation of Unresolved Safety Issue A-46 Program Implementation,Including Plant Hydro Station & Switchyard ML15261A2391999-09-0707 September 1999 Discusses 990825 Meeting in Atlanta,Ga Re Results of Recent Duke Power Co Fire Endurance Testing of Penetration Seals. List of Attendees & Presentation Handouts Encl ML15261A2371999-09-0101 September 1999 Submits Traning Manager Conference Meeting Summary of Meeting Conducted on 990812-13 on Recent Changes to Operator Licensing Program.List of Attendees & Matl Used in Presentation Enclosed ML15113A7471999-08-31031 August 1999 Responds to Providing Info on EOP Licensing Basis for Plant Requested by NRC to Base Planned NRC EOP Insp on This Info.Research Completed Into Licensing Basis of EOP & Synopsis of Basis for NRC Position Re Matter Encl ML15112A7411999-08-30030 August 1999 Forwards Request for Addl Info Re Util 990727 Requested Amend to Oconee Nuclear Station,Units 1,2 & 3 Tss.Amend Would Incorporate Keowee Hydro Unit Voltage & Frequency Protection Mod Surveillance Requirements ML15261A2711999-08-11011 August 1999 Discusses 990730 Open Meeting Conducted at Region II Request Re Continuing & Planned Engineering Activites.List of Meeting Attendees & Copy of Presentation Handout Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML15261A2721999-08-0909 August 1999 Confirms 990803 Telcon Re Mgt Meeting to Be Conducted on 990825 to Discuss Results of Recent DPC Fire Endurance Testing of Penetration Seals ML16134A5591999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML15113A7311999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Responses to GL 96-05, Periodic Verification of Design-Bases Capability of Safety-Related Movs, Issued on 960918 ML15261A4151999-07-30030 July 1999 Forwards Insp Repts 50-269/99-04,05-270/99-04 & 50-287/99-04 on 990523-0703.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML15261A2701999-07-14014 July 1999 Confirms Telcon Between Je Burchfield & Re Carroll on 990708 Re Mgt Meeting Scheduled 990730 in Atlanta Ga.Purpose of Meeting to Discuss Status of Open EFW Insp Items & Engineering Initiatives ML15113A7151999-07-13013 July 1999 Forwards Audit Rept on Y2K Contingency Planning Program for Plant Conducted on 990608-09,as follow-up to GL 98-01 ML15261A2681999-07-0202 July 1999 Confirms 990701 Telcon with L Nicholson Concerning Emergency Operating Procedures Meeting.Informs That Meeting Has Been Scheduled for 990722 ML15113A7101999-07-0101 July 1999 Forwards SE Granting Third 10-yr Interval ISI Program Plan Request for Relief 98-03.Relief Would Allow Credit to Be Taken by Plant for Limited Ultrasonic Exams on Specific Pressurizer Sensing nozzle-to-vessel Welds ML15254A1711999-06-30030 June 1999 Forwards Biological Assessment to Evaluate Whether Proposed Renewal of Oconee Nuclear Station,Units 1,2 & 3 Operating Licenses for Period of Addl 20 Years Would Have Adverse Effects on Listed Species ML15261A2671999-06-28028 June 1999 Discusses 990621 Meeting at Oconee Facility Re Results of Most Recent Periodic Plant Ppr.List of Attendees Encl ML15113A7071999-06-24024 June 1999 Discusses GL 92-001,Rev 1, Suppl 1, Reactor Vessel Structural Integrity ML15112A5111999-06-23023 June 1999 Refers to Oconee License Renewal SER Sent on 990616.Informs That Number of Copies Were Missing Pages 3-173 & 3-185. Forwards New Pages 3-173 Through 3-186 That Should Replace Existing Pages 3-174 Through 3-186 IR 05000269/19990031999-06-17017 June 1999 Forwards Insp Repts 50-269/99-03,50-270/99-03 & 50-287/99-03.Violations Being Treated as Noncited Violations ML15112A5001999-06-16016 June 1999 Forwards SER Re Licensee 980706 Application to NRC for Renewal of Oconee Nuclear Station,Units 1,2 & 3 Operating License for Addl 20 Years.Open Items Must Be Resolved Before NRC Can Make Final Determination on Application ML15261A2651999-06-15015 June 1999 Discusses 990526 Meeting Re Results of 1st Oconee License Renewal Insp.Forwards List of Attendees & Presentation Slide ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML15112A4961999-06-0808 June 1999 Forwards SE of TR DPC-NE-2005P, Use of BWU-Z Critical Heat Flux Correlation for Mark-B11 Fuel. Rept Acceptable ML15261A2631999-06-0202 June 1999 Provides NRC Decision on Licensee 980604 Request for Reconsideration of Violation B of NOV Issued on 980504 Re Timeliness in Reporting Design Basis Events or Conditions at Plant Facility ML15261A2641999-06-0202 June 1999 Informs That Meeting Re Performance of Oconee Nuclear Station Will Be Held on 990621 ML15112A4861999-05-25025 May 1999 Forwards SER Accepting Rev 1 to Topical Rept DPC-NE-3005-P, UFSAR Chapter 15 Transient Analysis Methodology Submitted by Ltr ML15261A4061999-05-24024 May 1999 Forwards Insp Repts 50-269/99-11,50-270/99-11 & 50-287/99-11 on 990426-30.No Violations Noted.Scoping & Screening Portion of License Renewal Activities Were Conducted as Described in License Renewal Application ML15112A4821999-05-21021 May 1999 Discusses Request That Topical Rept DPC-NE-3005-P,Rev 1, UFSAR Chapter 15 Transient Analysis Methodology, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML15253A5091999-05-18018 May 1999 Submits NRR mgt-approved Survey Re Hydrogen Storage at Operating Nuclear Plants.Requests That Project Managers Contact Licensees to Conduct Listed Survey & That Rept Be Submitted by Close of Business on 990528 ML15261A2601999-05-17017 May 1999 Confirms 990510 Telcon with E Burchfield Concerning Public Meeting Scheduled for 990629.Purpose of Meeting to Discuss Results of NRC Most Recent PPR of Plant ML15261A2591999-05-12012 May 1999 Discusses 990421 Meeting Conducted by NRC to Discuss Analysis Methodology Supporting Plant License Renewal Application.List of Meeting Attendees & Presentation Handouts Encl ML15113A6811999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Div of Licensing Project Mgt Created.Rl Emch Section Chief for Oconee.Reorganization Chart Encl ML15261A2611999-05-10010 May 1999 Responds to from Util to NRC Re Upcoming NRC Insp of Emergency Operating Procedures at Oconee Nuclear Station & Util Request That NRC Concur That Planned Insp Will Be Based on Oconee Licensing Basis ML15261A2551999-05-10010 May 1999 Confirms Telcon Between Je Burchfield & C Julian Re Meeting to Be Conducted on 990526 for NRC to Present Results of NRC First Inspection of Oconee License Renewal Program Conducted 990426 ML15217A2091999-05-10010 May 1999 Discusses Determination of Scope of Transmission Lines Impact Assessment for License Renewal.Impacts Resulting from Maint Activities Associated with 330 Miles of Transmission Lines Cited in Original Fes in Suppls to GEIS 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML15113A7671999-10-27027 October 1999 Informs That NRC Will Not Be Able to Issue Final Safety Evaluation for BAW-2248 Until mid-Nov Because of Scheduler Conflicts & Workload Priorities ML15261A2421999-10-13013 October 1999 Informs That on 990930,staff Completed mid-cycle PPR of Oconee Nuclear Station.No New Areas That Warranted More than Core Insp Program Over Next Five Months Identified. Historical Listing of Plant Issues Encl ML15112A7851999-10-0808 October 1999 Provides NRC Staff Plan for Resolving Open Item 2.1.3.1-1 of SER Re License Renewal of Plant,Units 1,2 & 3 ML15112A7741999-10-0505 October 1999 Requests Addl Info Re Aging Effects of Insulated Cables & Connections for Plant,Based on Insp Findings Noted in Insp Repts 50-269/99-12,50-270/99-12 & 50-287/99-12 and License Renewal Application ML15113A7511999-09-23023 September 1999 Concludes That All Info Requested by GL 98-01 & Suppl 1 Re Y2K Readiness of Computers at NPPs Provided by Util & GL 98-01 Considered Closed for Ons,Units 1,2 & 3 ML15261A4221999-09-21021 September 1999 Forwards Insp Repts 50-269/99-12,50-270/99-12 & 50-287/99-12 on 990602-0730.No Violations Noted.Insp Revealed That,In Most Cases,Existing Aging Mgt Programs,Implemented as Described in Licensee Application ML15113A7521999-09-21021 September 1999 Informs That Util 980326 Response to GL 97-06, Degradation of Steam Generator Internals Acceptable ML15112A7661999-09-20020 September 1999 Forwards SE Accepting Relief Request for Revision 25 of Pump & Valve Inservice Testing Program,Third 10-yr Interval for Plant ML15261A2411999-09-17017 September 1999 Confirms 990916 Telcon Between L Nicholson of Licensee Staff & R Carroll of NRC Re Mgt Meeting to Be Conducted on 991006 in Atlanta,Ga to Discuss Licensee Status of Ongoing Improvement Initiatives at Oconee Nuclear Station ML15261A4181999-09-10010 September 1999 Forwards Insp Repts 50-269/99-05,50-270/99-05 & 50-287/99-05 on 990704-0814.Ten Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML15113A7481999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Imposed by RG 1.147,Rev 12,acceptable Since Evaluation on Original Relief Based on Implementing Code Case for Duration of Insp Interval & That 990522 Request Valid ML15112A7521999-09-10010 September 1999 Forwards SE Accepting Licensee 990806 Request for Relief to Use Alternative Rules of ASME B&PV Code on Certain Weld Matls in Replacement SGs Being Manufactured for Plant ML15112A7611999-09-0909 September 1999 Forwards Safety Evaluation of Unresolved Safety Issue A-46 Program Implementation,Including Plant Hydro Station & Switchyard ML15261A2391999-09-0707 September 1999 Discusses 990825 Meeting in Atlanta,Ga Re Results of Recent Duke Power Co Fire Endurance Testing of Penetration Seals. List of Attendees & Presentation Handouts Encl ML15261A2371999-09-0101 September 1999 Submits Traning Manager Conference Meeting Summary of Meeting Conducted on 990812-13 on Recent Changes to Operator Licensing Program.List of Attendees & Matl Used in Presentation Enclosed ML15113A7471999-08-31031 August 1999 Responds to Providing Info on EOP Licensing Basis for Plant Requested by NRC to Base Planned NRC EOP Insp on This Info.Research Completed Into Licensing Basis of EOP & Synopsis of Basis for NRC Position Re Matter Encl ML15112A7411999-08-30030 August 1999 Forwards Request for Addl Info Re Util 990727 Requested Amend to Oconee Nuclear Station,Units 1,2 & 3 Tss.Amend Would Incorporate Keowee Hydro Unit Voltage & Frequency Protection Mod Surveillance Requirements ML15261A2711999-08-11011 August 1999 Discusses 990730 Open Meeting Conducted at Region II Request Re Continuing & Planned Engineering Activites.List of Meeting Attendees & Copy of Presentation Handout Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML15261A2721999-08-0909 August 1999 Confirms 990803 Telcon Re Mgt Meeting to Be Conducted on 990825 to Discuss Results of Recent DPC Fire Endurance Testing of Penetration Seals ML16134A5591999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML15113A7311999-08-0202 August 1999 Forwards SE Accepting Licensee 60-day Responses to GL 96-05, Periodic Verification of Design-Bases Capability of Safety-Related Movs, Issued on 960918 ML15261A4151999-07-30030 July 1999 Forwards Insp Repts 50-269/99-04,05-270/99-04 & 50-287/99-04 on 990523-0703.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML15261A2701999-07-14014 July 1999 Confirms Telcon Between Je Burchfield & Re Carroll on 990708 Re Mgt Meeting Scheduled 990730 in Atlanta Ga.Purpose of Meeting to Discuss Status of Open EFW Insp Items & Engineering Initiatives ML15113A7151999-07-13013 July 1999 Forwards Audit Rept on Y2K Contingency Planning Program for Plant Conducted on 990608-09,as follow-up to GL 98-01 ML15261A2681999-07-0202 July 1999 Confirms 990701 Telcon with L Nicholson Concerning Emergency Operating Procedures Meeting.Informs That Meeting Has Been Scheduled for 990722 ML15113A7101999-07-0101 July 1999 Forwards SE Granting Third 10-yr Interval ISI Program Plan Request for Relief 98-03.Relief Would Allow Credit to Be Taken by Plant for Limited Ultrasonic Exams on Specific Pressurizer Sensing nozzle-to-vessel Welds ML15254A1711999-06-30030 June 1999 Forwards Biological Assessment to Evaluate Whether Proposed Renewal of Oconee Nuclear Station,Units 1,2 & 3 Operating Licenses for Period of Addl 20 Years Would Have Adverse Effects on Listed Species ML15261A2671999-06-28028 June 1999 Discusses 990621 Meeting at Oconee Facility Re Results of Most Recent Periodic Plant Ppr.List of Attendees Encl ML15113A7071999-06-24024 June 1999 Discusses GL 92-001,Rev 1, Suppl 1, Reactor Vessel Structural Integrity ML15112A5111999-06-23023 June 1999 Refers to Oconee License Renewal SER Sent on 990616.Informs That Number of Copies Were Missing Pages 3-173 & 3-185. Forwards New Pages 3-173 Through 3-186 That Should Replace Existing Pages 3-174 Through 3-186 IR 05000269/19990031999-06-17017 June 1999 Forwards Insp Repts 50-269/99-03,50-270/99-03 & 50-287/99-03.Violations Being Treated as Noncited Violations ML15112A5001999-06-16016 June 1999 Forwards SER Re Licensee 980706 Application to NRC for Renewal of Oconee Nuclear Station,Units 1,2 & 3 Operating License for Addl 20 Years.Open Items Must Be Resolved Before NRC Can Make Final Determination on Application ML15261A2651999-06-15015 June 1999 Discusses 990526 Meeting Re Results of 1st Oconee License Renewal Insp.Forwards List of Attendees & Presentation Slide ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML15112A4961999-06-0808 June 1999 Forwards SE of TR DPC-NE-2005P, Use of BWU-Z Critical Heat Flux Correlation for Mark-B11 Fuel. Rept Acceptable ML15261A2641999-06-0202 June 1999 Informs That Meeting Re Performance of Oconee Nuclear Station Will Be Held on 990621 ML15261A2631999-06-0202 June 1999 Provides NRC Decision on Licensee 980604 Request for Reconsideration of Violation B of NOV Issued on 980504 Re Timeliness in Reporting Design Basis Events or Conditions at Plant Facility ML15112A4861999-05-25025 May 1999 Forwards SER Accepting Rev 1 to Topical Rept DPC-NE-3005-P, UFSAR Chapter 15 Transient Analysis Methodology Submitted by Ltr ML15261A4061999-05-24024 May 1999 Forwards Insp Repts 50-269/99-11,50-270/99-11 & 50-287/99-11 on 990426-30.No Violations Noted.Scoping & Screening Portion of License Renewal Activities Were Conducted as Described in License Renewal Application ML15112A4821999-05-21021 May 1999 Discusses Request That Topical Rept DPC-NE-3005-P,Rev 1, UFSAR Chapter 15 Transient Analysis Methodology, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML15253A5091999-05-18018 May 1999 Submits NRR mgt-approved Survey Re Hydrogen Storage at Operating Nuclear Plants.Requests That Project Managers Contact Licensees to Conduct Listed Survey & That Rept Be Submitted by Close of Business on 990528 ML15261A2601999-05-17017 May 1999 Confirms 990510 Telcon with E Burchfield Concerning Public Meeting Scheduled for 990629.Purpose of Meeting to Discuss Results of NRC Most Recent PPR of Plant ML15261A2591999-05-12012 May 1999 Discusses 990421 Meeting Conducted by NRC to Discuss Analysis Methodology Supporting Plant License Renewal Application.List of Meeting Attendees & Presentation Handouts Encl ML15113A6811999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Div of Licensing Project Mgt Created.Rl Emch Section Chief for Oconee.Reorganization Chart Encl ML15261A2611999-05-10010 May 1999 Responds to from Util to NRC Re Upcoming NRC Insp of Emergency Operating Procedures at Oconee Nuclear Station & Util Request That NRC Concur That Planned Insp Will Be Based on Oconee Licensing Basis ML15217A2091999-05-10010 May 1999 Discusses Determination of Scope of Transmission Lines Impact Assessment for License Renewal.Impacts Resulting from Maint Activities Associated with 330 Miles of Transmission Lines Cited in Original Fes in Suppls to GEIS ML15261A2551999-05-10010 May 1999 Confirms Telcon Between Je Burchfield & C Julian Re Meeting to Be Conducted on 990526 for NRC to Present Results of NRC First Inspection of Oconee License Renewal Program Conducted 990426 ML15261A4031999-05-0505 May 1999 Forwards Insp Repts 50-269/99-02,50-270/99-02 & 50-287/99-02 on 990228-0410.Five Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-09
[Table view] |
Text
CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9906220192 DOC.DATE: 99/06/15 NOTARIZED: NO DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.
05000270 50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.
05000287 AUTH.NAME AUTHOR AFFILIATION MCCREE,V.M.
Region 2 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION MCCOLLUM,W.R.
Duke Power Co.
C
SUBJECT:
Discusses 990526 meeting re results of 1st Oconee license renewal insp.Forwards list of attendees & presentation A
slide.
DISTRIBUTION CODE: IE45D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Summary of Significant Meeting with Licensee (Part 50)
E NOTES:
G RECIPIENT COPIES RECIPIENT COPIES 0
ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-1 PD 1
1 LABARGE,D 1
1 R
INTERNAL: DEDRO 1
1E CE ER 1
1 Y
NRR/DIPM/IOLB 1
1 1
1 RES/DET/EIB 1
1 RGN2 FILE 01 1
1 2
EXTERNAL:
NOAC 1
1 NRC PDR 1
1 D
0 C
U M
E N
T NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
June 15, 199S Duke Energy Corporation ATTN:
Mr. W. R. McCollum Vice President Oconee Nuclear Station P. 0. Box 1439 Seneca, SC 29679 SUBJECT.
MEETING
SUMMARY
- OCONEE NUCLEAR STATION
Dear Mr. McCollum:
This refers to the meeting conducted by NRC request at the Oconee Nuclear Station on May 26, 1999, to discuss the results of the first Oconee license renewal inspection as documented in NRC Inspection Report 99-11. Enclosures and 2 are a list of meeting attendees and NRC's presentation slide respectively.
In accordance with Section 2.790(a) of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this meeting summary, please contact Mr. Caudle Julian at (404) 562-4603.
Sincerely, (Original Signed by V. M. McCree)
Victor M. McCree, Deputy Director Division of Reactor Safety Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55
Enclosures:
- 1. List of Attendees
- 2. NRC Presentation Slide cc w/encls:
J. E. Burchfield Compliance Duke Energy Corporation P. 0. Box 1439 Seneca, SC 29679 (cc w/encl cont'd - See page 2) 9906220192 990615 PDR ADOCP 05000269 GP DR
DEC 2
cc cont'd:
Rick N. Edwards Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Anne Cottingham Winston and Strawn 1400 L Street, NW Washington, D. C. 20005 Mel Fry, Director Division of Radiation Protection N. C. Department of Environmental Health & Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 Virgil R. Autry, Director Bureau of Radioactive Waste Management S. C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 County Supervisor of Oconee County Walhalla, SC 29621 Manager, LIS NUS Corporation 2650 McCormick Drive Clearwater, FL 34619-1035 L. A. Keller Licensing - ECO50 Duke Energy Corporation P. 0. Box 1006 Charlotte, NC 28201-1006 Peggy Force Assistant Attorney General N. C. Department of Justice P. 0. Box 629 Raleigh, NC 27602 Steven P. Shaver Senior Sales Engineer Westinghouse Electric Company 5929 Carnegie Blvd., Suite 500 Charlotte, NC 28209 (cc cont'd: - See page 3)
DEC 3
(cc cont'd)
Chattooga River Watershed Coalition P. 0. Box 2006 Clayton, GA 30525 Gregory D. Robison Duke Energy Corporation Mail Stop EC-12R P. 0. Box 1006 Charlotte, North Carolina 28201-1006 Douglas J. Walters Nuclear Energy Institute 1776 I Street, NW Suite 400 Washington, DC 20006-3708
DEC 4
Distribution w/encls:
L. Plisco, Rll D. LaBarge, NRR R. Carroll, RIl H. Berkow, NRR C. Casto, Ril C. Julian, Rll C. Ogle, Ri NRC Resident Inspector PUBLIC OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE NAME CJulian COgle VMcCree DATE 9
6/
19 6/
199 61 199 COPY?
YES NO YES NO YES YES NO YES NO YES No OFFWAL RECORD COPY DOCUMENT NAME: S:ADRS1METSUM2.WPD
PUBLIC
LIST OF ATTENDEES Nuclear Regulatory Commission S. Freeman, Resident Inspector - Oconee Nuclear Station, DRP, Rll C. Grimes, Chief, License Renewal and Standardization Branch NRR R. Hannah, Public Affairs Officer, Rll V. McCree, Deputy Director, Division of Reactor Safety (DRS), Rll L. Reyes, Regional Administrator, Region II (RII)
M. Scott, Senior Resident Inspector - Oconee Nuclear Station, DRP, RII Duke Energy Corporation (DEC)
L. Azzarello, Mechanical Systems Engineering Supervisor, ONS E. Burchfield, Regulatory Compliance Manager, ONS W. Foster, Safety Assurance Manager, ONS M. Gaudy, Radiation Waste Manager R. Nader, Duke Power Company License Renewal L. Nicholson, Licensing Engineer, ONS W. McCollum, Vice President, Oconee Nuclear Station (ONS)
T. Pettit, Customer Relations Manager, DEC T. Shiel Duke Power/Public Affairs J. Smith, Technical Specialist, ONS D. Stewart, Duke Power Community Rel.
J. Weast, Licensing Engineer, ONS L. Wilkie, Duke Power Engineering Assessments Others T. Cregar, Reporter, Greenville News L. Gabrels, Anderson Independent R. Mangrum, WGOG
\\ '
REG&j, OCONEE LICENSE RENEWAL TIMELINE Region II Oconee Notice of Staff Presents Applicant First Inspection Submits Opportunity Local Public Questions Provides (Scoping &
Renewal for Hearing Meeting (RAIs)
Responses Screening)
Application July 7, August 11, October 19, December 29, March 3, April 26-30, 1998 1998 1998 1998 1999 1999 NRC Issues Draft NRC Issues Environmental First Inspection NR susRegion 11 Statement Public Exit Safety Evaluation Report Local Public Second Inspection (DES) For (SER) with Open Items Meeting on DES (Aging Management Commnt
-Programs)
Comment May 20, May 26, June 17, July 8, July 12-26, 1999 1999 1999 1999 1999 NRC Issues Final Environmental Region II Region II NRC Decision on Statement Third Inspections Final ACRS Oconee License (FES) & SER Inspection Complete Meeting Renewal February 12, March 2000 April 2000 May 12, August 2000 2000 2000